the construction. As the Owner's
Representative, Constantine would be overseeing the project in the following manner
summarized as: serve as the Design Criteria Professional; prepare the RFQ (for Design/Build
Team), the Request for Proposal (RFP), and the Design Criteria Package (DCP; performance
specifications and preliminary engineering); evaluate Statement of Qualifications and bids;
perform engineer's cost estimates; groundwater modeling; permitting; engineering services
during construction; resident observation; develop and manage Owner Purchased Equipment
(OPE) program; coordinate complete system startup; construction administration; perform any
miscellaneous engineering and technical service required in support of the project and
specifically requested by the County. A more thorough explanation is included with Exhibit A.
With the approval of this Agreement, Constantine's first major task would be to draft the RFQ
for a Design/Build (D/B) Team. Therefore, staff is also requesting to move forward with a
qualifications based selection process for a contract with a D/B Team, with the following
process:
- Constantine to prepare the RFQ for staff's consideration. Staff will then review and finalize the
RFQ.
- Purchasing Staff to advertise RFQ and oversee.
- Upon receiving submissions from interested D/B Teams, on behalf of the County, Constantine
to serve as the technical expert to evaluate the D/B Teams using pass/fail criteria and provide a
recommendation to the OCWS Staff as to the elimination of any firm that failed to meet the
minimum standards. OCWS Staff will then meet and evaluate those that meet the minimum
requirement to arrive at the short-list of D/B Teams.
- Constantine to prepare the DCP and RFP for staff's consideration. RFP would go through
County Contract Review. The DCP is a technical document - preliminary drawings and
performance specifications.
- RFP and DCP to be issued to short-listed D/B Teams.
- OCWS Staff and Constantine will hold a mandatory pre-proposal meeting with all short-listed
D/B Teams present. In addition, Proprietary Meetings will be held with each of the short-listed
D/B Teams to discuss confidential conceptual design ideas.
- Upon receiving the proposals from the D/B Team, the following Review Committee would
review:
Zan Fedorak or designee - Purchasing Manager (non-voting member to
Packet Pg. 391
oversee)
Nathan Boyles - Board of County Commissioners, Water & Sewer Liaison
Jeff Littrell - Water & Sewer, Director
Jeb Chessher - Water & Sewer, Project Manager
Darren Alford - Water & Sewer, Wastewater Operations Manager
Jason Autrey - Public Works, County Engineer
- Upon the Review Committee selecting the most qualified D/B Team to be recommended to the
BCC, OCWS Staff and Constantine would then open up the price envelope (a separate cost
proposal from the qualifications proposal), and then proceed to negotiate a contract with the D/B
Team. Florida Statutes 287.055 (AKA "Consultants' Competitive Negotiation Act (CCNA)")
will be followed and adhered to. This was also explained in the Jan. 7, 2014 Agenda Request.
-Resulting Agreement with the selected D/B Team would then be routed through County
Contract Review and then be brought to the BCC for approval and execution.
OPTIONS: Approve or deny.
RECOMMENDATIONS: OCWS and Purchasing staff recommend BCC approval to award
RFQ #WS 37-14 to Constantine Engineering to serve as the Owner's Representative and Design
Criteria Professional for the Arbennie Pritchett WRF Expansion Project and to authorize the
Chairman to execute the "Agreement for Consulting Services" with Constantine Engineering for
an amount not to exceed $1,189,400. Staff also recommend to move forward with a
qualifications based selection process for a contract with a Design/Build (D/B) Team, as outlined
above.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Packet Pg. 392
Packet Pg. 393
Packet Pg. 394
Packet Pg. 395
Packet Pg. 396
Packet Pg. 397
Packet Pg. 398
Packet Pg. 399
Packet Pg. 400
Packet Pg. 401
Packet Pg. 402
Packet Pg. 403
Packet Pg. 404
Packet Pg. 405
Packet Pg. 406
Packet Pg. 407
Packet Pg. 408
Packet Pg. 409
Packet Pg. 410
Packet Pg. 411
Packet Pg. 412
Packet Pg. 413
Packet Pg. 414
Packet Pg. 415
Packet Pg. 416
Packet Pg. 417
Packet Pg. 418
Packet Pg. 419
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: January 7, 2014
TO: Honorable Chairman and Members of the Board
FROM: Jeff Littrell
SUBJECT: Arbennie Pritchett WRF Expansion - Engineering RFQ & Review
Committee
DEPARTMENT: Water and Sewer
BCC DISTRICT: All
STATEMENT OF ISSUE: OCWS and Purchasing staff request permission to move forward
with a qualifications based selection process for a contract with an engineering consultant for the
Arbennie Pritchett WRF Expansion Project to serve as the Owner's Representative and Design
Criteria Professional.
BACKGROUND: Construction of the Arbennie Pritchett Water Reclamation Facility (APWRF)
was completed in 2009 and has an annual average daily flow (AADF) capacity of 10 million
gallons per day (MGD). This $65M program with 5 sub-projects was a huge success. The
project was completed within budget and on-time. This state-of-the-art WRF has now been
operating efficiently for about 4 years with parameters well below our state permit requirements.
In addition, the APWRF has been the foundation for many related agreements that have
generated revenue or reduced expenses for the Water & Sewer Enterprise Fund: 7th Special
Forces, City of Ft. Walton Beach, Eglin Air Force Beach (Duke Field, Camp Rudder, Main Base,
and the Navy EOD school), and Niceville/Valparaiso (diverting East County flow).
Currently, the actual AADF is approximately 6.3 MGD. With the additional flow of the above-
mentioned projects and other ongoing development, we anticipate being above 8 MGD of actual
AADF in about 2 years. On paper, the capacity reserved is approximately 8.5 MGD. Although
we have about 15% capacity remaining of the average daily flow, this puts us in an
uncomfortable position for the long-term and the short-term during peak flow events, such as
storms or hi-flow summer weekends. Because of this, OCWS has a 5 MGD plant expansion in
our approved 5-year CIP: $2M in FY2014, $8M in FY2015, and $3M in FY2016. Most
importantly, we expect this $13M total to be funded with cash. In account 411-4199-599360,
OCWS has been saving up Capacity Expansion Charges (CECs) that have been received on the
above-mentioned projects and other large projects, such as some of the recent hotels. We
currently have approximately $4.5M in this account and are under contract with Eglin AFB for
another $8.5M, which is expected to be received in the summer of 2014. Staff feels that the
responsible thing to do is fund the 5 MGD needed expansion from the $13M to be in this
account. There is also a desire to proceed with the expansion before the amount of CEC funds
available is rendered insufficient by construction material inflation. Fortunately, the APWRF
was designed and constructed with a future expansion in mind, from 10 MGD to 15 MGD.
Certain components (i.e. head works, UV channels, admin building, etc.) have already been
constructed for 15 MGD AADF, and room on the site has been left available for the needed
expansion (oxidation ditch, clarifier, etc.).
Packet Pg. 420
As Okaloosa County did in the late 2000s, when APWRF went through the procurement and
design process, staff is proposing the design-build method of procurement, following Florida
Statues and Design Build Institute of America (DBIA) requirements/guidelines. We feel that
design-build is the best approach to large, high-dollar projects; with 1 company doing both the
design and construction, it avoids finger pointing and potentially litigious situations, thereby
lowering risk to the owner. The bidding process of selecting a design-build (D-B) contractor is
qualifications based. Interested firms would submit both qualifications and bids in separate
envelopes. The most qualified D-B contractor would be selected with the intent to negotiate a
contract. The other set of envelopes would then be opened with their actual bid price.
Negotiation then occurs with the most-qualified bidder until a final price is reached. If a price
cannot be negotiated, negotiations would cease with the most-qualified bidder and commence
with the next-most qualified bidder. This paragraph is just a brief summary of the D-B
procurement process. Staff will come back to the Board in the future to obtain permission to
move forward with the Request for Qualifications (RFQ) for a D-B contractor.
Currently, staff is requesting permission to issue an RFQ for an engineering consultant to serve
as the Owner's Representative and be the Design Criteria Professional (DCP), as outlined in
Florida Statutes 287.055 (AKA "Consultants' Competitive Negotiation Act (CCNA)"). Because
the anticipated amount of this contract exceeds the thresholds listed in this statute, an existing
continuing contract (AKA "master services agreement") cannot be utilized. A new contract will
need to be executed for the professional engineering services necessary to move forward with the
plant expansion. These professional engineering services may include but are not limited to the
following services: owner's representative in procuring and coordinating with D-B contractor;
serve as the Design Criteria Professional; prepare the RFQ (for D-B contractor), the Request for
Proposal (RFP), and the Design Criteria Package (performance specifications and preliminary
engineering); evaluate Statement of Qualifications and bids; perform engineer's cost estimates;
groundwater modeling; permitting; engineering services during construction; resident
observation; develop and manage Owner Purchased Equipment (OPE) program; coordinate
complete system startup; construction administration; perform any miscellaneous engineering
and technical service required in support of the project and specifically requested by the County.
OCWS and Purchasing staff would now like to begin the process of obtaining an engineering
consultant for the APWRF Expansion Project via the formal qualifications based selection
process. If authorized by the Board, OCWS staff will work with Purchasing staff to formulate a
Request for Qualifications (RFQ) to begin the formal selection process. In the State of Florida
per the Competitive Consultants Negotiations Act (CCNA), the selection criteria for the award of
engineering contracts are qualifications based.
Staff also recommends the following Review Committee to evaluate the statements of
qualifications received and bring back a recommendation to the Board, regarding which firms to
enter contracts with:
Zan Fedorak or designee - Purchasing Manager (non-voting member to oversee)
Nathan Boyles - Board of County Commissioners, Water & Sewer Liaison
Packet Pg. 421
Jeff Littrell - Water & Sewer, Director
Jeb Chessher - Water & Sewer, Project Manager
Darren Alford - Water & Sewer, Wastewater Operations Manager
Jason Autrey - Public Works, County Engineer
OPTIONS: Approve or deny.
RECOMMENDATIONS: Staff requests BCC approval to move forward with the qualifications
based selection process (via a RFQ) for a contract with an engineering