READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — April 27, 2013 — Terms and Conditions of Accepting AIP Grants — reading text
Part 4 of 8. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 102-Terms and Conditions of Accepting AIP Grants.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
development, the Sponsor
agrees to implement within five years of such grant the airport development that requires this land
acquisition, unless the FAA agrees to a different duration. Furthermore, the Sponsor agrees not to
dispose of the land by sale or lease without prior consent and approval of the FAA. In the event the land
is not used within ten years for the purpose for which it was acquired, the Sponsor will refund the Federal
share of acquisition cost or the current fair market value of the land, whichever is greater, unless the FAA
agrees to a different duration.
Runway Protection Zones. The Sponsor agrees to take the following actions to maintain and/or acquire
a property interest, satisfactory to the FAA, in the Runway Protection Zones:
1. Existing Fee Title Interest in the Runway Protection Zone: The Sponsor agrees to prevent the
erection or creation of any structure or place of public assembly in the Runway Protection Zone,
except for NAVAIDS that are fixed by their functional purposes or any other structure approved by the
FAA. Any existing structures or uses within the Runway Protection Zone will be cleared or
discontinued unless approved by the FAA.
2. Existing Easement Interest in the Runway Protection Zone: The Sponsor agrees to take any and all
steps necessary to ensure that the owner of the land within the designated Runway Protection Zone
will not build any structure in the Runway Protection Zone that is a hazard to air navigation or which
might create glare or misleading lights or lead to the construction of residences, fuel handling and
storage facilities, smoke generating activities, or places of public assembly, such as churches,
schools, office buildings, shopping centers, and stadiums.
3. Future Interest in the Runway Protection Zone: The Sponsor agrees that it will acquire fee title or less-
than-fee interest in the Runway Protection Zones that presently are not under its control under an
agreed schedule with the FAA. Said interest shall provide the protection noted in above
Subparagraphs 1 and 2.
Noise Projects on Privately Owned Property. No payment shall be made under the terms of this grant
agreement for work accomplished on privately owned land until the Sponsor submits the agreement with
the owner of the property required by Assurance 5d of the ASSURANCES Airport Sponsors, and such
agreement is determined to be satisfactory. As a minimum, the agreement with the private owner must
contain the following provisions:
1. The property owner shall subject the construction work on the project to such inspection and approval
during the construction or installation of the noise compatibility measures and after completion of the
measures as they may reasonably be requested by the Secretary or the Sponsor.
2. The property owner shall assume the responsibility for maintenance and operation of the items
installed, purchased, or constructed under this grant agreement. Neither the FAA nor the Sponsor
bears any responsibility for the maintenance and operation of these items.
3. If Federal funds for the noise compatibility measures are transferred by the Sponsor to the owner of
the private property, or the owner's agent, the property owner shall agree to maintain and make
available to the Secretary or the Sponsor, upon reasonable request, records disclosing the amount of
funds received and the disposition of those funds.
4. The property owner's right to sue the owner of the noise-impacting Airport for adverse noise impacts
will be abrogated if the property owner deliberately or willfully acts to reduce or destroy the
effectiveness of the noise compatibility measures during the useful life of such measures. This
obligation shall remain in effect throughout the useful life of the noise compatibility measures, but not
to exceed 20 years from the date of the Sponsor's acceptance of federal aid for the project.
Update Approved Exhibit “A” For Land in Project. It is understood and agreed by and between the
parties hereto that notwithstanding the fact that this grant offer is made and accepted upon the basis of
the current Exhibit “A” Property Map, the Sponsor hereby covenants and agrees that upon completion of
an AIP funded land acquisition project, it will update said Exhibit “A” Property Map to standards
satisfactory to the FAA and submit said documentation in final form to the FAA. It is further mutually
agreed that the reasonable cost of developing said Exhibit “A” Property Map is an eligible administrative
cost for participation within the scope of this project.
Friction Measuring Devices. [f this grant includes acquisition of friction measuring devices, the Sponsor
assures that it will properly calibrate, operate, and maintain the friction measuring equipment in
accordance with the manufacturer's guidelines and instructions and Advisory Circular 150/5320-12. The
friction measuring equipment and tow vehicle (if applicable) shall not be used for any other purpose other
than for conducting friction measuring tests on airport pavement surfaces and directly related activities,
such as training and calibration.
7 of 16
Z. Low Emission Systems. If this grant includes low emission systems work, the Sponsor agrees to the
following conditions under the Voluntary Airport Low Emission (VALE) program:
1. Vehicles and equipment purchased with assistance from this grant shall be maintained and used for
their useful life at the airport for which they were purchased. Moreover, any vehicles or equipment
teplaced under this program shall not be transferred to another airport or location within the same or
any other nonattainment or maintenance area. No airport-owned vehicles or equipment may be
transferred to, taken to, or used at another airport without the consent of the FAA in consultation with
the United States Environmental Protection Agency and State air quality agency.
2. All vehicles and equipment purchased with assistance from this grant shall be clearly labeled using
the VALE program emblem designed by the FAA.
3. The Sponsor shall maintain annual reporting records of all vehicles and equipment purchased with
assistance from this grant. These public records shall contain detailed information involving individual
vehicles and equipment, project expenditures, cost effectiveness, and emission reductions.
The Sponsor certifies that it shall replace any disabled or seriously damaged vehicle or equipment
purchased with assistance from this grant, at any time during its useful life, with an equivalent vehicle or
unit that produces an equal or lower level of emissions. The Sponsor assumes all financial responsibility
for replacement costs. The Sponsor also certifies that it shall fulfill this replacement obligation, beyond the
useful life of the affected vehicle or equipment, for the possible longer life of Airport Emission Reduction
Credits that were granted to the Sponsor for this vehicle or equipment.
Iv. ASSURANCES
The following FAA document titled ASSURANCES Airport Sponsors, dated March 29, 2005, is incorporated as
part of these Terms and Conditions:
ASSURANCES
Airport Sponsors
A. General.
1. These assurances shall be complied with in the performance of grant agreements for airport development,
airport planning, and noise compatibility program grants for airport sponsors.
2. These assurances are required to be submitted as part of the project application by sponsors requesting
funds under the provisions of Title 49, U.S.C., subtitle VII, as amended. As used herein, the term "public
agency sponsor" means a public agency with control of a public-use airport; the term "private sponsor"
means a private owner of a public-use airport; and the term "Sponsor" includes both public agency
sponsors and private sponsors.
3. Upon acceptance of this grant offer by the Sponsor, these assurances are incorporated in and become
part of this grant agreement.
B. Duration and Applicability.
1. Airport development or Noise Compatibility Program Projects Undertaken by a Public Agency
Sponsor. The terms, conditions and assurances of this grant agreement shall remain in full force and
effect throughout the useful life of the facilities developed or equipment acquired for an airport
development or noise compatibility program project, or throughout the useful life of the project items
installed within a facility under a noise compatibility program project, but in any event not to exceed twenty
(20) years from the date of acceptance of a grant offer of Federal funds for the project. However, there
shall be no limit on the duration of the assurances regarding Exclusive Rights and Airport Revenue so
long as the airport is used as an airport. There shall be no limit on the duration of the terms, conditions,
and assurances with respect to real property acquired with federal funds. Furthermore, the duration of the
Civil Rights assurance shall be specified in the assurances.
2. Airport Development or Noise Compatibility Projects Undertaken by a Private Sponsor. The
preceding paragraph 1 also applies to a private sponsor except that the useful life of project items
installed within a facility or the useful life of the facilities developed or equipment acquired under an airport
development or noise compatibility program project shall be no less than ten (10) years from the date of
acceptance of Federal aid for the project.
3. Airport Planning Undertaken by a Sponsor. Unless otherwise specified in this grant agreement, only
Assurances 1, 2, 3, 5, 6, 13, 18, 30, 32, 33, and 34 in section C apply to planning projects. The terms,
conditions, and assurances of this grant agreement shall remain in full force and effect during the life of
the project.
C. Sponsor Certification. The Sponsor hereby assures and certifies, with respect to this grant that:
1. General Federal Requirements. It will comply with all applicable Federal laws, regulations, executive
orders, policies, guidelines, and requirements as they relate to the application, acceptance and use of
Federal funds for this project including but not limited to the following:
Federal Legislation
Title 49, U.S.C., subtitle VIl, as amended.
Davis-Bacon Act - 40 U.S.C. 276(a), et sea.’
Federal Fair Labor Standards Act - 29 U.S.C. 201, et seq.
Hatch Act - 5 U.S.C. 1501, et sea.”
Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 Title 42 U.S.C.
4601, et seq.'?
National Historic Preservation Act of 1966 - Section 106 - 16 U.S.C. 470(f).'
paocD
8 of 16
Archeological and Historic Preservation Act of 1974 - 16 U.S.C. 469 through 469c.'
Native Americans Grave Repatriation Act - 25 U.S.C. Section 3001, et seq.
Clean Air Act, P.L. 90-148, as amended.
Coastal Zone Management Act, P.L. 93-205, as amended.
Flood Disaster Protection Act of 1973 - Section 102(a) - 42 U.S.C. 4012a."
Title 49, U.S.C., Section 303, (formerly known as Section 4(f))
. Rehabilitation Act of 1973 - 29 U.S.C. 794.
Civil Rights Act of 1964 - Title VI - 42 U.S.C. 2000d through d-4.
Age Discrimination Act of 1975 - 42 U.S.C. 6101, et seq.
American Indian Religious Freedom Act, P.L. 95-341, as amended.
Architectural Barriers Act of 1968 -42 U.S.C. 4151, et sea.’
Power plant and Industrial Fuel Use Act of 1978 - Section 403- 2 U.S.C. 8373.'
Contract Work Hours and Safety Standards Act - 40 U.S.C. 327, et seq.’
Copeland Anti kickback Act - 18 U.S.C. 874.1
National Environmental Policy Act of 1969 - 42 U.S.C. 4321, et seq.’
Wild and Scenic Rivers Act, P.L. 90-542, as amended.
Single Audit Act of 1984 - 31 U.S.C. 7501, et seg.”
Drug-Free Workplace Act of 1988 - 41 U.S.C. 702 through 706.
Executive Orders
<e<er ere ee ge ero Se
Executive Order 11246 - Equal Employment Opportunity’
Executive Order 11990 - Protection of Wetlands
Executive Order 11998 — Flood Plain Management
Executive Order 12372 - Intergovernmental Review of Federal Programs
Executive Order 12699 - Seismic Safety of Federal and Federally Assisted New Building
