READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — April 27, 2013 — Terms and Conditions of Accepting AIP Grants — reading text

Part 3 of 8. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 102-Terms and Conditions of Accepting AIP Grants.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

project, the FAA determines that this grant amount exceeds the expected needs of the Sponsor by $5,000 or five percent (5%), whichever is greater, this grant amount can be unilaterally reduced by letter from FAA advising of the budget change. Conversely, with the exception of planning projects, if there is an overrun in the eligible project costs, FAA may increase this grant to cover the amount of the overrun not to exceed the statutory fifteen (15%) percent limitation for primary airports or either by not more than fifteen percent (15%) of the original grant amount or by an amount not to exceed twenty-five percent (25%) of the total increase in allowable project costs attributable to the acquisition of land or interests in land, whichever is greater, based on current credible appraisals or a court award in a condemnation proceeding for non-primary airports. FAA will advise the Sponsor by letter of the increase. Planning projects will not be increased above the planning portion of the maximum obligation of the United States shown in this grant agreement. Upon issuance of either of the aforementioned letters, the maximum obligation of the United States is adjusted to the amount specified. In addition, the Sponsor's Officially designated representative, is authorized to request FAA concurrence in revising the project description and grant amount within statutory limitations. A letter from the FAA concurring in the said requested revision to the project work description and grant amount shall constitute an amendment to this Grant Agreement. If requested by the Sponsor and authorized by the FAA, the letter of credit method of payment may be used. It is understood and agreed that the Sponsor agrees to request cash withdrawals on the letter of credit only when actually needed for its disbursements and to timely reporting of such disbursements as required. It is understood that failure to adhere to this provision may cause the letter of credit to be revoked. . Unless otherwise approved by the FAA, it will not acquire or permit any contractor or subcontractor to acquire any steel or manufactured products produced outside the United States to be used for any project for airport development or noise compatibility for which funds are provided under this grant. The Sponsor will include in every contract a provision implementing this condition. If this grant agreement includes pavement work that equals or exceeds $250,000, the Sponsor will perform the following: 1. Furnish a construction management program to FAA prior to the start of construction which shall detail the measures and procedures to be used to comply with the quality control provisions of the construction contract, including, but not limited to, all quality control provisions and tests required by the Federal specifications. The program shall include as a minimum: a. The name of the person representing the Sponsor who has overall responsibility for contract administration for the project and the authority to take necessary actions to comply with the contract. b. Names of testing laboratories and consulting engineer firms with quality control responsibilities on the project, together with a description of the services to be provided. c. Procedures for determining that testing laboratories meet the requirements of the American Society of Testing Materials standards on laboratory evaluation, referenced in the contract specifications (D3666, C1077). d. Qualifications of engineering supervision and construction inspection personnel. e. A listing of all tests required by the contract specifications, including the type and frequency of tests to be taken, the method of sampling, the applicable test standard, and the acceptance criteria or tolerances permitted for each type of test. f. Procedures for ensuring that the tests are taken in accordance with the program, that they are documented daily, that the proper corrective actions, where necessary, are undertaken 2. Submit at completion of the project, a final test and quality control report documenting the results of all tests performed, highlighting those tests that failed or did not meet the applicable test standard. The report shall include the pay reductions applied and reasons for accepting any out-of-tolerance material. An interim test and quality control report shall be submitted, if requested by the FAA. 3. Failure to provide a complete report as described in paragraph 2, or failure to perform such tests, shall, absent any compelling justification, result in a reduction in Federal participation for costs incurred in connection with construction of the applicable pavement. Such reduction shall be at the 5 of 16 discretion of the FAA and will be based on the type or types of required tests not performed or not documented and will be commensurate with the proportion of applicable pavement with respect to the total pavement constructed under this grant agreement. 4. The FAA, at its discretion, reserves the right to conduct independent tests and to reduce grant payments accordingly if such independent tests determine that Sponsor tests results are inaccurate. O. For a project to replace or reconstruct pavement at the airport, the Sponsor shall implement an effective airport_pavement_maintenance_ management program as is required by Airport Sponsor Assurance Number 11. The Sponsor shall use such program for the useful life of any pavement constructed reconstructed, or repaired with Federal financial assistance at the airport. As a minimum, the program must conform with the following provisions: Pavement Maintenance Management Program An effective pavement maintenance management program is one that details the procedures to be followed to assure that proper pavement maintenance, both preventive and repair, is performed. An airport sponsor may use any form of inspection program it deems appropriate. The program must, as a minimum, include the following: 1. Pavement Inventory. The following must be depicted in an appropriate form and level of detail a. Location of all runways, taxiways, and aprons; b. Dimensions; c. Type of pavement, and; d. Year of construction or most recent major rehabilitation. For compliance with the Airport Improvement Program (AIP) assurances, pavements that have been constructed, reconstructed, or repaired with federal financial assistance shall be so depicted. 2 Inspection Schedule. a. Detailed Inspection. A detailed inspection must be performed at least once a year. If a history of recorded pavement deterioration is available; ie., Pavement Condition Index (PCI) survey as set forth in Advisory Circular 150/5380-6, “Guidelines and Procedures for Maintenance of Airport Pavements," the frequency of inspections may be extended to three years. b. Drive-By Inspection. A drive-by inspection must be performed a minimum of once per month to detect unexpected changes in the pavement condition. 3. Record| Keeping. Complete information on the findings of all detailed inspections and on the maintenance performed must be recorded and kept on file for a minimum of five years. The types of distress, their locations, and remedial action, scheduled or performed, must be documented. The minimum information to be recorded is listed below: a. Inspection date; b. Location; c. Distress types; and d. Maintenance scheduled or performed. For drive-by inspections, the date of inspection and any maintenance performed must be recorded. 4. Information Retrieval. An airport Sponsor may use any form of record keeping it deems appropriate; so long as the information and records produced by the pavement survey can be retrieved to provide a report to the FAA as may be required. 5. Reference. Refer to Advisory Circular 150/5380-6, “Guidelines and Procedures for Maintenance of Airport Pavements,” for specific guidelines and procedures for maintaining airport pavements and establishing an effective maintenance program. Specific types of distress, their probable causes, inspection guidelines, and recommended methods of repair are presented. P. Takeover of Instrument Landing System and Associated Equipment in Project. If this grant includes an instrument landing system and associated equipment and the FAA has agreed to takeover the system and equipment, the Sponsor must check the facility prior to its commissioning to assure it meets the operational standards. The Sponsor must also remove, relocate, or lower each obstruction on the approach, or provide for the adequate lighting or marking of the obstruction if any aeronautical study conducted under FAR part 77 determines that to be acceptable, and mark and light the runway, as appropriate. Q. Airport-Owned Visual or Electronic NAVAIDS In Project. If this grant includes a visual or electronic navigational aid, the Sponsor must provide for the continuous operation and maintenance of any navigational aid funded under the AIP during the useful life of the equipment and check the facility prior to its commissioning to assure it meets the operational standards. The Sponsor must also remove, relocate, or lower each obstruction on the approach or provide for the adequate lighting or marking of the obstruction if any aeronautical study conducted under FAR Part 77 determines that to be acceptable, and mark and light the runway, as appropriate. The FAA will not take over the ownership, operation, or maintenance of any sponsor-acquired equipment other than an AlP-funded instrument landing system and associated equipment where FAA agrees to take over the system and equipment. R. Non-AIP Work in Application. It is understood and agreed by and between the parties hereto that notwithstanding the fact that a Project Application may include therein the construction of work not included in this grant agreement project description, said work shall not be a part of this project and, if or to the extent accomplished by the Sponsor, such accomplishment shall be without any participation in the costs thereof by the United States under this project. It is further understood and agreed that, in the event the work which is excluded from the project is accomplished by the Sponsor, the Sponsor shall maintain as a portion of the cost records covering this project, separable cost records pertaining to the above- identified work excluded from Federal participation under this project, which records shall be made available for inspection and audit by the FAA to the end that the cost of the excluded work may be definitely determined. 6 of 16 It is further understood and agreed that the Sponsor will submit a Program Statement/cost estimate depicting the excluded costs or a cost estimate depicting only those costs eligible for Federal participation in this project. Utility Relocation in Project. It is understood and agreed by and between the parties hereto that the United States shall not participate in the cost of any utility relocation unless and until the Sponsor has submitted evidence satisfactory to the FAA that the Sponsor is legally responsible for payment of such costs. FAA participation will be limited to those utilities located on private right-of-way or utilities that exclusively serve the Airport. Revenue from Real Property — Land in Project. The Sponsor agrees that all net revenues produced from real property purchased in part with Federal funds in this grant shall be used on the airport for airport planning, development or operating expenses, except that all income from real property purchased for noise compatibility purposes or for future aeronautical use be used only to fund projects which would be eligible for grants under the Act. Income from noise or future use property may not be used for the Sponsor's matching share of any airport grant. Airport fiscal and accounting records shall clearly identify actual sources and uses of these funds. Future Development Land. If this grant includes acquisition of land for future

Download this text file with its original spacing ↓