READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2009-20-Wastewater Interlocal Agreement — reading text
Part 2 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-17094-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
1. 00) per year for each year
of this Agreement including any extensions thereto. Prior to the approval and
execution of this Agreement, the County has been allowed to inspect the Tertiary
System of the City, and agrees to accept the system under the lease " as is" at
the time of the execution of this Agreement. However, the County does not
assume any liability or responsibility under the lease for any environmental
contamination which may be present on the site of the Tertiary System.
B) This lease contains a provision for the conveyance of the Tertiary
System to the County under the following circumstances. Following the execution
of this lease, in the event that the City desires to convey the Tertiary System to
the County, the City shall provide written notice to the County of its intent to
begin the conveyance process.
1) The City shall then cause to be performed, by an independent
consultant, a Phase I and Phase II Environmental Assessment on the site of the
Tertiary System. The cost of the Phase I and Phase II Environmental
Assessment shall be the sole responsibility of the City. The City shall provide a
copy of the Environmental Assessment to the County for its review. The County
shall have sixty ( 60) days to review the Environmental Assessment.
a) In the event that the results of the Environmental
Assessment demonstrate that there is no contamination of the property upon
which the Tertiary System is located, which exceeds acceptable levels meeting
all local, state and federal guidelines, or it reflects contamination that exceeded
acceptable levels meeting all local, state and federal guidelines, but the City has
fully remediated such contamination, then the City shall convey to the County
and the County shall accept ownership of the Tertiary System. Such conveyance
shall be by warranty deed in a form acceptable to the County. The County shall
pay the sum of ten dollars ($ 10. 00) for the conveyance of the Tertiary System.
b) In the event that the Environmental Assessment determines
the presence of contaminants on the Tertiary System, or the property upon which
it is located, which exceeds acceptable levels meeting all local, state and federal
guidelines and the City is unwilling to remediate such contamination, then the
obligation of the County to acquire this property shall be null and void and this
Agreement shall continue as a lease and governed by those terms relating to the
lease.
2) Additionally, upon receiving written notice of the City' s intent to
begin the conveyance process, the County may seek, at its expense, an
examination of the evidence of merchantable title of the City in the Tertiary
System, performed by a qualified title insurance company authorized to do
business in the State of Florida. Within ten ( 10) business days of receipt of the
results of the examination, the County shall provide written notice to the City of
any defects in or objections to the title along with a copy of the examination
results. Within ten ( 10) days of receiving the County' s notice of defects in or
objections to title, the City, at it's option, may either correct those defects or
objections in title or withdraw its notice to convey the Tertiary System to the
County.
C) In addition the lease of the Tertiary System and the property upon
which it is located, or its conveyance under Section 5 ( B), the City shall either
assign to the County, or convey under the provisions of Section 5 ( B), all
easements, licenses or rights of access held by it for the lines and facilities of the
Tertiary System or provide an alternative, acceptable to the County, to enable it
to obtain ingress and egress to the lines and other facilities for the provision of
maintenance and improvements to the Tertiary System.
1) In the event that an easement, license or right of access assigned
to the County by the City, or conveyed under Section 5 ( B), for the lines and
facilities of the Tertiary System, is subsequently released, revoked, expires or
otherwise becomes without force and effect, then the County shall be responsible
for obtaining acceptable access to provide maintenance to such lines and
facilities. The lines which shall be the responsibility of the County to maintain
access shall consist of the transmission lines from APWRF to the sand filter at
the Tertiary System and reject lines from the Tertiary System back to the
APWRF.
2) The City shall not conveyor assign to the County any easement,
license or right of access of the City' s Reclaimed Distribution System and in the
event that such easement, license or right of access is subsequently released,
revoked, expires or otherwise becomes without force and effect, then it shall be
the exclusive responsibility of the. City to obtain acceptable access to provide
maintenance to such lines and facilities. The lines which shall continue to be the
responsibility of the City shall consist of the reclaim water mains from the Tertiary
System to the City' s Ground Storage Tank at the City' s Golf Course.
D) As of the effective date of this Agreement, the County shall be,
responsible for the permitting, operation, repair and maintenance of the Tertiary
System. In the event that a capacity expansion of the Tertiary System is required,
the cost of such improvements shall be the responsibility of the City in proportion
to the extent that the expansion is necessary to provide service to the City
Service Area.
E) The City shall retain the responsibility for the operation,
maintenance, and repair of the City' s Wastewater Collection System and the
City' s Reclaimed Distribution System, including any future reclaimed water
distribution, transmission, and storage systems downstream of the Tertiary
System as contained on Appendix B to this Agreement.
F) During the term of this Agreement and for any extensions, the
County shallexclusively provide for the treatment and disposal of all of the
wastewater generated from within the City' s Service Area, including any future
annexations. Other service areas, acquired by the City after the effective date of
this Agreement, may be included under the terms of this Agreement if consented
to by the County. Such exclusivity shall not prevent the City from the use of
reclaimed water acquired from the County under the terms of this Agreement.
SECTION 6. RECLAIMED WATER SERVICE.
A) During the term of this Agreement, including any extension thereto,
the County shall deliver up to the maximum permitted capacity of the Tertiary
System, obtained from the City under either the lease or conveyance as set forth
in this Agreement, or 1. 55 million gallons per day ( annual average daily flow),
whichever is greater, of reclaimed water to the City, without charge, for its use or
resale within the City Service Area (" Guaranteed Reclaimed Amount"). It is
agreed by the parties that the current maximum permitted capacity of the Tertiary
System is 1. 55 million gallons per day ( annual average daily flow).
B) The County acknowledges the City' s reliance on a reliable and
continuous supply of reclaimed water necessary for the irrigation of the City
Service Area. As such, the County agrees to limit service interruptions to only
those necessary for the maintenance and upkeep of the Tertiary System
components and shall be no longer in duration than four ( 4) days, except
where the service interruption can not be remedied within that time period as
the cause of such interruption is located in areas where either easements,
licenses orrights of access held by the City have either expired or are
otherwise no longer valid. During this four ( 4) day period, the County shall
have no obligation to provide either an alternative water source or reimburse
the City for the cost of any water used for irrigation purposes at the City' s Golf
Club. In the event that a service interruption exceeds four ( 4) days, the
County agrees to provide water from alternative sources for the irrigation
needs of the City' s Golf Club. The City shall pay to the County for this
alternative water source at the then existing Inter- Utility Emergency Water
Rate as currently contained in Appendix H, or as that rate may be
subsequently amended.
C) During the term of this Agreement, the County shall be
responsible for all permitting requirements pursuant to Florida law and
regulations for the reclaimed water system within the City Service Area
including but not limited to the quality of the water coming from the effluent
filtration system.
D) During the term of this Agreement, the City shall be responsible
for all ground water monitoring pursuant to Florida law and regulations for the
reclaimed water system within the City Service Area. In the event that there is
a violation of the terms and provisions of the County' s permits as a result of
the failure to comply with any provision of Florida law or regulations in relation
to the ground water monitoring within the City' s Service Area, and such
violation is not the result of violations of Florida law and regulations relating to
the quality of water discharged from the effluent filtration system, then the
City shall hold the County harmless from any cost relating to that failure to
comply.
SECTION 7. COLLECTION SYSTEM FACILITIES.
The City, at its own expense shall design, permit, construct and operate
the City' s Collection System, including any required pumping stations, force
mains, and appurtenant facilities up to the Point of Connections to the County' s
wastewater facilities. All facilities shall be designed, permitted, and constructed in
conformance with all applicable local, state, and federal laws permits, rules, and
regulations.
SECTION 8. POINT OF CONNECTION.
The point or points of connection to the County' s raw wastewater influent
mains and reclaimed water mains shall be determined and approved by the
County after consultation with the City (" Points of Connection"). The Points of
Connection shall be determined as the actual physical location of the connection
to the County' s existing main( s). The actual tap connection to the County' s raw
wastewater influent mains and the reclaimed water mains will be constructed by
the County. All costs related to providing the interconnection from the City' s
existing wastewater mains to the County' s raw wastewater influent mains shall
be paid by the County. All of the costs of the Point of Connection between the
County' s reclaimed water mains and the City' s Reclaimed Distribution System,
excluding the cost of labor provided by County employees, shall be the
responsibility of the City. The County shall invoice the City for the costs of the
Points of Connection between the County' s reclaimed water mains and the City' s
Reclaimed Distribution System and will make documentation available to the City
for its review demonstrating the cost incurred. The County shall own the Points of
Connection and be responsible for any maintenance thereof
SECTION 9. METER INSTALLATION AND TESTING.
A) The County shall construct, install, maintain, and have calibrated, at
least annually, a master magnetic flow meter at each Point of Connection to
automatically measure and record the total flow conveyed from or to the City, as
described elsewhere in this Agreement.
B) The County shall pay the cost of the installation of a magnetic flow
meter on the force n:tain connection between the City' s system and the County' s
influent main to measure and record the total flow discharged from the City
Service Area into the APWRF. The County shall pay for cost of this annual
certification