Okaloosa County BOCC — April 27, 2013 — Action Item Printout — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 184-Action Item Printout.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: March 19, 2013 TO: Honorable Chairman and Members of the Board FROM: John Hofstad SUBJECT: Marler Park Boat Parking Expansion & Convention Center Exhibit Pad DEPARTMENT: Public Works BCC DISTRICT: Two STATEMENT OF ISSUE: As part of the design review process, the Army Corps of Engineers (ACOE) has determined that wetland impacts from the proposed project will require mitigation. The design, permitting, construction inspection and long term monitoring activities that are required as part of the ACOE permit are beyond the scope of the existing task order to Atkins. The scope and fee to perform the necessary services is provided for acceptance by the Board of County Commissioners. BACKGROUND: Originally approved on November 15, 2011, Atkins is working on the design plans for the expansion of the boat parking area at Marler Park along with a new exhibit pad for the Convention Center. Proposed improvements will have an impact on small wetland areas on site and the ACOE is requiring mitigation for the environmental impacts. In order to satisfy the application and permit requirements, Atkins has provided a scope and fee to perform the necessary work (attached for reference). Included with the proposed scope is the permit design, permit acquisition, construction oversight and long term monitoring/reporting. All of these elements are required as part of the ACOE wetland permit. Without these elements being approved the permit will not be issued. The original task order to Atkins was approved by the Board of County Commissioners for a total fee of $64,615.00. Amendments 1 through 3 have increased the task total to the current approved value of $83,815.00. Proposed Amendment 4 requires approval by the Board of County Commissioners because the value of the proposed amendment is greater than 10% of the initial contract (per Purchasing Policy). The proposed amendment is for a not to exceed amount of $14,078.00. If approved, the resulting task order total would be $97,893.00. Costs associated with the design of this project are being split equally between the Tourist Development and Public Works Departments. OPTIONS: Approve/Disapprove amendment number 4 in the amount of $14,078.00 for task order number 3 to Atkins for the Marler Park Boat Parking Expansion and Convention Center Exhibit Pad design project. RECOMMENDATIONS: Approve amendment number 4 in the amount of $14,078.00 for task order number 3 to Atkins for the Marler Park Boat Parking Expansion and Convention Center Exhibit Pad design project. RECOMMENDED BY: APPROVED BY: James D. Curry, County Administrator

Download this text file with its original spacing ↓