sizes of required taps, locations
and sizes of required meters, and
types of required backflow preventers. The locations and
Developer shall be responsible for
installing any required backflow preventers and all onsite
way line. The City shall be responsible for piping past the right-of-
performing any water main taps, installing
any service lines up to the right-of-
way line, and installing any water meters.
2.
According to office drawings, there is an existing 12" terra cotta
gravity main available that lies within a 10- foot sanitary sewer
utility easement along the northern
property line. The plans do not clearly show the
connections to the existing easement or any
existing sewer main. The plans shall identify
main( s) with diameters and existing sewer
lengths and shall also identify any existing manholes.
The plans shall also
identify the size, length, slope, and invert elevations of
proposed water main( s) and the location of
any connections to existing sewers or
manholes. The Developer shall be
responsible for all onsite sewer installation and
any connections to existing sewer mains or
manholes.
3. The proposed
Utility Plan does not specify the sizes or locations of
the existing water or sewer connections to
system. Any connections to the
specified on the plans. Backflow preventers are existing system shall be
and shall be installed on required on all water service lines
private property. Water meters shall be installed in a
of-way easement. The right-
City shall be responsible for making any
service taps on the required water
existing 8" main and installing service lines and water meters
within the right-of-
way. the Developer shall be
backflow preventers, the onsite water responsible for installing the
service mains,
existing sewer system, and all onsite sewer systems.making any connections to the
4. Water meters are to be
accessible to the water meter readers
not susceptible to
and located in an area
heavy traffic, preferably a grassed area, not in a
parking space. driveway or
254
Regular Council 6/ 27/ 06
SITE PLAN APPROVAL- FAIRWAY INN ( CONT)
5. It is the responsibility of the
Developer' s Engineer to determine if FDEP and/ or FDOT
permitting is required for the water or sewer services.
6. Water and sewer impact fees shall
apply to the new development. The Developer
has completed an ERC Determination Form
based on the table provided in the
impact fee ordinance or estimated water and wastewater flows. The number of ,...,,'"
ERCs for this development is 4. 66 for both water
and wastewater.
7. Water and sewer
impact fees shall apply to all units. Water is $ 700 per ERC and
sewer is $807 per ERC. Water
Impact Fees = $ 700/ ERC x 4. 66 ERCs= 3, 262; Sewer
Impact Fees = $ 807/ ERC x 4.66 ERCs = 3, 760. 62
8. Water and sewer connection fees shall be
determined when the final utility plan has
been submitted and approved.
9. The development must meet FDEP
environmental regulations and FDOT standards
for sediment and soil erosion control. The
proposed sediment and erosion control
measures shall be installed
prior to commencement of any demolition of existing
structures or construction of the
proposed development.
10. An attached list of standard
plans has been added to the final plans. The plans shall
not be approved until required standards notes
are included on the
11. The materials a nd sizes for t he
plans.
proposed water and sewer service mains and
appurtenances shall be identified on the plans. The onsite water and sewer
shall be deemed private systems
systems. The City' s maintenance responsibilities will end at
the right-of-way easement line.
12. Inflow protectors shall be
required in all new sanitary sewer manholes for this
development.
BuildinQ InsDection Comments:
1. Title page of plans need to reflect current codes
2. Building height actually should be three stories
3. What is the third story used for?
4. " Dining" room- does it have cooking facilities?
5. Need product approvals
6. Means of egress-over 2, 000 square feet requires two
7. Show fire separation between commercial and
residential
8. Show handicapped parking
9. Show electrical and equipment room
10. Show any penetration details
11. Indicate flood zone
12. As built survey required after slab
inspection
13. Show how a/ c units will be
physically attached
14. Show insulation
15. Water heater lines also shall have
insulation within 8 feet of unit
16. Show attic access
17. Show stair construction
18. Indicate termite treatment
19. Show emergency and exit
lights
20. Provide energy forms
21. Occupant load is required to be
posted first floor-note plans
22. Roof covering, if metal, shall be done on a
separate permit
23. Presuming that the backflow
already exists on this property
Buildino/Zonino Comments:
1. Please revise the standard notes as
provided by CDS Staff.
255
Regular Council
6/ 27/ 06
SITE PLAN APPROVAL-
FAIRWAY INN ( CONT)
2. Because the entire parcel is a
condominium, all site data must include
parcel, not just the area noted as " the entire
Condominium Unit 1." This includes
footage calculations for the entire site, square
stormwater management calculations,
impervious surface area calculations,
building area, parking based on all the
buildings ( including the restaurant), etc.
3. Site Plan Issues:
4. a) Please submit revised
plans that are to scale. The plans submitted
scale, so staff cannot check are not to
dimensions; therefore, there be
that need to be addressed ( may issues of concern
such as aisle width for the
northeast corner of the parking spaces on the
property).
b) The dumpster located in
the Cedar Avenue
the private right-of-way must be moved to within
property and the concrete pad demolished and new
c) The
impervious surface ratio is 83% for the site, which curbing installed.
ISR by 8%. It is unclear exceeds the required 75%
by reviewing the site plan whether the
area of 77, 787 includes
the area of " optional future
impervious surface
reduced area of pavement realized parking" or if this is just the
the impervious area issue,
by removing the existing building. Because of
the " optional"
required, and possibly as more parking and landscaped area will be
landscaped area than parking if no additional
spaces are required for the condominium. parking
This way, the additional 8% of
pervious surface needed can be worked into
plans, as well as some other minor the
reconstruction as described in d) and e)
d) The site plan indicates below.
two parking
a row. Please