READ ALONGSIDE THE SOURCE
Fort Walton Beach Council minutes — 06-27-06 regular minutes — reading text
Part 3 of 6. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-10696-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
no proponents or
opponents who spoke at the June 1 LPA
public hearing, and that Staff recommended
approval of the request.
COMMENTS FROM PROPONENTS/ OPPONENTS
The Mayor asked for comments from
proponents/ opponents. As there was none, the
hearing was closed. public
AMENDMENT 06- 21- CP06- 1. AMEND FLUM TO PL
FOR 122 HOLLYWOOD BLVD.
The seventh and final amendment to
be discussed was 06- 21- CP06- 1 , a
request from the
designation on the FLUM series from GC, General Commercial City
amend future land use to
Public Lands, for parcels of to PL,
approximately 0. 63 acres located at 122 Hollywood Boulevard SE
Hollywood Church of God in Christ).
Mr. Mitchell advised that there were
no proponents or
opponents who spoke at the June 1 LPA
public hearing, and that Staff recommended
approval of the request.
COMMENTS FROM PROPONENTS/
OPPONENTS
The Mayor asked for comments from
proponents/ opponents. As there was none, the
hearing was closed. public
As there were no
objections, the Staff Report was entered and
accepted into the record.
Dr. Pullen moved to
adopt Ord. 1705 on first
reading, as
recommended by the
Planning Board and Staff. Mr. Tucker seconded motion and it Municipal
carried unanimously with
Holmes, Patterson, Campbell, Tucker,
Pullen, and Minich in favor (Hartwell
absent).
252
Regular Council
6/ 27/ 06
SITE PLAN APPROVAL FAIRWAY INN
CHECK- IN BUILDING. 203 MIRACLE STRIP
The City Attorney announced a PARKWAY
quasi-judical proceeding and swore in tt10se who planned to
on this item. testify
Consideration of a request by owner Ken Patel for site
plan approval of the
Building located at 203 Miracle Strip Parkway, SW. The project consists ofFairway
Inn, Check In
the demolition of the """"
existing building and swimming pool and the construction of a 5, 117 SF
check- in facilities, breakfast area, exercise building that includes hotel
room and
laundry/ maintenance area. The existing
swimming pool will be relocated on the site.
Peggy Fowler, Planner, presented an overview of the project.
The applicant agreed with Staff's
recommendation, and the Staff Report was entered into
record. the
Mr.Campbell moved to approve the site plan for the
located at 203 Miracle
Fairway Inn check- in building, to be
Strip Parkway, with the following conditions: Note: This
recommendation is based upon the application and site
plan developed by Sun Engineering
project # 18- 2006) and the architectural drawings and elevations
Lambert Architectural, Inc. ( developed by Stokes-
project 04028, dated 4/ 18/ 05).
1. Prior to application for
building permit:
a) The
landscape plan shall be negotiated between City Staff and the owner on the
required landscape plan. All perimeter landscape areas shall meet
the requirements of
Section 12. 714.10.
b) A landscape plan
prepared by a professional landscape architect or
must be submitted and nurseryman
approved by CDS staff. The plan must with all applicable
comply
regulations in Chapter 12. 71 of the LDC, including
well.
design for an irrigation system with a
c) The plans must address all
applicable items submitted by CDS, Fire, Public Works,
Utilities and Building Inspections staff in
memorandums distributed at the
DRC meeting as follows: May 12, 2006
Fire Inscection Comments:
1. Install key box
2. Address numerals shall be a
minimum of six inches on the
3. Building shall have a building.
sprinkler system and fire alarm.
4. The fire alarm shall be monitored.
5. The present
building contains the fire alarm panel and sprinkler valve, what are the
plans for these items when the building is demolished and new
construction starts?
The sprinkler valve shall be
separated from the area where the chemicals for the
swimming pool are mixed, this is a highly corrosive area
Public Works/ Enaineerina Comments: causing the valve to rust.
1. The official address for the
development is 203 Miracle Strip Parkway SW
2. Since the parking area is
being modified, please provide a dumpster site within the
development. The existing site is in the City right-of-way and
truck to access it while in the street. requires the sanitation
3. There is a 10- foot easement
along the north line of the property for sanitary sewer,
for a distance of 100 feet from Cedar
Avenue ( O. R. Book 350,
show this easement on all site sheets. Page 769). Please
4. All walkway installations
must meet the ADA
requirements of the latest Florida
Accessibility Code.
253
Regular Council
6/ 27/ 06
SITE PLAN APPROVAL- FAIRWAY
INN ( CONn
Utilities/ Environmental Comments:
1. After careful review of the
plans submitted by Sun
that detailed calculations Engineering, it is recommended
supporting an impervious surface reduction be provided
signed and sealed) by a registered Professional
2. The top elevations, Engineer for the State of Florida.
inverts, and sizes of each of the
three catch basins on the
southern side of the properties needs
to be identified, and submitted
pipe sizes, inverts, and slopes of the two along with the
pipes connected to the stormwater inlet
boxes on Miracle Strip
Parkway SW. Pictures ofthe insides ofthe three catch basins
in the parking lot are also
necessary.
3. Depending on the
existing stormwater system/ calculations, the
Beach may suggest the installation of City of Fort Walton
two Stormwater Pollutant
separators will be installed in- line with the Separators. These
boxes on Miracle Strip existing pipes connected to the inlet
Parkway, and the catch basins in the parking lot of 203
Miracle Strip Parkway SW.
4. The
redevelopment must meet FDEP environmental
for sediment and soil erosion regulations and FDOT standards
control. The proposed sediment and
measures shall be installed
erosion control
prior to commencement of any demolition of
structures or construction of the existing
proposed development.
5. Sediment and erosion
control devices need to be shown
on the plan sheets
submitted for building permits.
Utilities Comments:
1. There is an 8" water main available on
the north side of Miracle
required water service connections. A sidewalk cut Strip Parkway for any
may be required to make any
required taps. The plans shall identify
any existing water main( s) with their sizes,
meters, backflow preventers, and fire
hydrants. The plans shall also identify the