READ ALONGSIDE THE SOURCE

Fort Walton Beach Council minutes — 06-27-06 regular minutes — reading text

Part 3 of 6. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-10696-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

no proponents or opponents who spoke at the June 1 LPA public hearing, and that Staff recommended approval of the request. COMMENTS FROM PROPONENTS/ OPPONENTS The Mayor asked for comments from proponents/ opponents. As there was none, the hearing was closed. public AMENDMENT 06- 21- CP06- 1. AMEND FLUM TO PL FOR 122 HOLLYWOOD BLVD. The seventh and final amendment to be discussed was 06- 21- CP06- 1 , a request from the designation on the FLUM series from GC, General Commercial City amend future land use to Public Lands, for parcels of to PL, approximately 0. 63 acres located at 122 Hollywood Boulevard SE Hollywood Church of God in Christ). Mr. Mitchell advised that there were no proponents or opponents who spoke at the June 1 LPA public hearing, and that Staff recommended approval of the request. COMMENTS FROM PROPONENTS/ OPPONENTS The Mayor asked for comments from proponents/ opponents. As there was none, the hearing was closed. public As there were no objections, the Staff Report was entered and accepted into the record. Dr. Pullen moved to adopt Ord. 1705 on first reading, as recommended by the Planning Board and Staff. Mr. Tucker seconded motion and it Municipal carried unanimously with Holmes, Patterson, Campbell, Tucker, Pullen, and Minich in favor (Hartwell absent). 252 Regular Council 6/ 27/ 06 SITE PLAN APPROVAL FAIRWAY INN CHECK- IN BUILDING. 203 MIRACLE STRIP The City Attorney announced a PARKWAY quasi-judical proceeding and swore in tt10se who planned to on this item. testify Consideration of a request by owner Ken Patel for site plan approval of the Building located at 203 Miracle Strip Parkway, SW. The project consists ofFairway Inn, Check In the demolition of the """" existing building and swimming pool and the construction of a 5, 117 SF check- in facilities, breakfast area, exercise building that includes hotel room and laundry/ maintenance area. The existing swimming pool will be relocated on the site. Peggy Fowler, Planner, presented an overview of the project. The applicant agreed with Staff's recommendation, and the Staff Report was entered into record. the Mr.Campbell moved to approve the site plan for the located at 203 Miracle Fairway Inn check- in building, to be Strip Parkway, with the following conditions: Note: This recommendation is based upon the application and site plan developed by Sun Engineering project # 18- 2006) and the architectural drawings and elevations Lambert Architectural, Inc. ( developed by Stokes- project 04028, dated 4/ 18/ 05). 1. Prior to application for building permit: a) The landscape plan shall be negotiated between City Staff and the owner on the required landscape plan. All perimeter landscape areas shall meet the requirements of Section 12. 714.10. b) A landscape plan prepared by a professional landscape architect or must be submitted and nurseryman approved by CDS staff. The plan must with all applicable comply regulations in Chapter 12. 71 of the LDC, including well. design for an irrigation system with a c) The plans must address all applicable items submitted by CDS, Fire, Public Works, Utilities and Building Inspections staff in memorandums distributed at the DRC meeting as follows: May 12, 2006 Fire Inscection Comments: 1. Install key box 2. Address numerals shall be a minimum of six inches on the 3. Building shall have a building. sprinkler system and fire alarm. 4. The fire alarm shall be monitored. 5. The present building contains the fire alarm panel and sprinkler valve, what are the plans for these items when the building is demolished and new construction starts? The sprinkler valve shall be separated from the area where the chemicals for the swimming pool are mixed, this is a highly corrosive area Public Works/ Enaineerina Comments: causing the valve to rust. 1. The official address for the development is 203 Miracle Strip Parkway SW 2. Since the parking area is being modified, please provide a dumpster site within the development. The existing site is in the City right-of-way and truck to access it while in the street. requires the sanitation 3. There is a 10- foot easement along the north line of the property for sanitary sewer, for a distance of 100 feet from Cedar Avenue ( O. R. Book 350, show this easement on all site sheets. Page 769). Please 4. All walkway installations must meet the ADA requirements of the latest Florida Accessibility Code. 253 Regular Council 6/ 27/ 06 SITE PLAN APPROVAL- FAIRWAY INN ( CONn Utilities/ Environmental Comments: 1. After careful review of the plans submitted by Sun that detailed calculations Engineering, it is recommended supporting an impervious surface reduction be provided signed and sealed) by a registered Professional 2. The top elevations, Engineer for the State of Florida. inverts, and sizes of each of the three catch basins on the southern side of the properties needs to be identified, and submitted pipe sizes, inverts, and slopes of the two along with the pipes connected to the stormwater inlet boxes on Miracle Strip Parkway SW. Pictures ofthe insides ofthe three catch basins in the parking lot are also necessary. 3. Depending on the existing stormwater system/ calculations, the Beach may suggest the installation of City of Fort Walton two Stormwater Pollutant separators will be installed in- line with the Separators. These boxes on Miracle Strip existing pipes connected to the inlet Parkway, and the catch basins in the parking lot of 203 Miracle Strip Parkway SW. 4. The redevelopment must meet FDEP environmental for sediment and soil erosion regulations and FDOT standards control. The proposed sediment and measures shall be installed erosion control prior to commencement of any demolition of structures or construction of the existing proposed development. 5. Sediment and erosion control devices need to be shown on the plan sheets submitted for building permits. Utilities Comments: 1. There is an 8" water main available on the north side of Miracle required water service connections. A sidewalk cut Strip Parkway for any may be required to make any required taps. The plans shall identify any existing water main( s) with their sizes, meters, backflow preventers, and fire hydrants. The plans shall also identify the

Download this text file with its original spacing ↓