MAJOR ACCOMPLISHMENTS LAST YEAR:
Received and reviewed development plans for 102 projects.
Attended 26 pre-application meetings with Developers and Engineers.
Reviewed and inspected 119 driveway permit applications.
Received and inspected 22 "below the crown" exemption requests.
Performed 188 periodic inspections for developments.
Performed 401 NPDES inspections.
Performed 35 bridge inspections/report filings.
Performed final plat review and approval for 4 plats.
Processed 12 FEMA-LOMR applications.
Conducted roadway material density tests for the Road Division as required for roadway and stormwater
construction projects.
PROGRAM GOAL: The Land Development Review and Permitting section’s mission is to ensure that
infrastructure proposed and constructed for citizen use is compliant with minimum technical standards and
promotes the health, safety and welfare of the general public.
KEY OBJECTIVES:
1. Verify that all submitted designs (both those intended for public dedication and private
ownership/maintenance) meet or exceed the minimum standards set forth in the Land Development Code to
protect the health, safety and welfare of the general public.
2. Coordinate public and private proposed improvements (across county and municipal jurisdictions) for
compatibility.
3. Inspect improvements to verify that they are constructed in accordance with the approved development
documents prior to making a recommendation to the Board of County Commissioners for acceptance of
maintenance responsibility.
4. Maintain open communication with project applicants from the pre-application meeting through
development approval.
5. Provide an efficient development review process.
6. Monitor stormwater and transportation concurrency in accordance with the Land Development Code and
Comprehensive Plan.
PERFORMANCE MEASURES:
Actual Estimated Adopted
Performance Measures
FY12/13 FY13/14 FY14/15
Number of full time employees 4 4 4
Input
Number of development plans received 67 102 75*
Number of final inspection requests received 39 39 40*
Number of plats approved 4 4 5*
Output
Number of formal inspections performed 39 39 40*
Number of plan reviews performed 67 102 75*
Efficiency
Average time for plan review (work days) 15 15 15
Average time between request and performance of an
2 2 2
inspection (work days)
Effectivenes
Percentage of plans reviewed within LDC requirements 100 100 100
Percentage of inspections performed within 72 hours of
100 100 90
request
*Actual amount is dependent upon the number of development applications made and the rate of construction
by the developer.