READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2013-27 - Adopt Budget FY 13-14 — reading text
Part 2 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-32202-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
0800 -521 -5233 Dec 2013
78865 07/ 30/ 13 Systems Specialists, Inc. City Hall A/ C repair 7, 555. 61 001 - 1230 -519 -4645 Oct 2013
78788 07/ 23/ 13 Altec Industries Aerial Bucket Truck 168, 000. 00 001 - 1230 -519 -6404 Mar 2014
79220 09/ 09/ 13 Roads Inc of NWF Wright Parkway Sidewalk Project 218, 996. 87 001 - 1585 -541 -6353 Dec 2013
125666* Hatch Mott MacDonald Survey & Plat for Hollywood Blvd Property 15, 750. 00 001 - 1500 -519 -3100 Oct 2013
76786 11/ 02/ 12 Kronos, Inc. Payroll Timekeeping - Analytics Configuration 27, 155. 00 001 - 5083 -513 -3100 Jan 2014
77144 05/ 14/ 13 DC Architects Inc. New Rec Center —complex plans 34,500. 00 001 - 5117 -572 -3100 Sep 2014
125666* Hatch Mott MacDonald
New Rec Center —Re- Platting 2, 500. 00 001 -5117 -572 -6214 Sep 2014
79073
08/ 26/ 13 Contractors Steel Supply New Rec Center— Barjoist, metal deck, steel materials 135, 445. 00 001 -5117 -572 -6257 Sep 2014
79236 09/ 11/ 13 Sequel Electrical Supply New Rec Center —lighting packages 439, 000. 00 001 -5117 -572 -6257 Sep 2014
79228
09/ 11/ 13 Sequel Electrical Supply New Rec Center —lighting packages 61, 500. 00 001 - 5117 -572 -6257 Sep 2014
79237
09/ 11/ 13 Fort Walton Concrete Company New Rec Center —CMU block fill 28, 200. 00 001 - 5117 -572 -6257 Sep 2014
79238 09/ 11/ 13 South AL Brick dba Keego Clay New Rec Center— Brick & related materials 40, 500. 00 001 - 5117 -572 -6257 Sep 2014
79239
09/ 11/ 13 Block USA —Gulf Coast Division New Rec Center —Concrete masonry units, glass block 148, 800. 00 001 -5117 -572 -6257 Sep 2014
125326*
Hussey Seating Company New Rec Center —bleachers 18, 087. 00 001 - 5117 -572 -6257 Sep 2014
79241 09/ 12/ 13 All Pro Sound New Rec Center —Audio -Visual equipment 34, 659. 97 001 - 5117 -572 -6257 Sep 2014
125407* County Materials Corporation New Rec Center —Concrete Pipe 150, 850. 88 001 -5117 -572 -6257 Sep 2014
125408* HD Supply Waterworks New Rec Center —Sanitary, storm, water, fire main 20,202. 75 001 -5117 -572 -6257 Sep 2014
79242 09/ 12/ 13 F &W Precast New Rec Center —Concrete Structures 50, 197. 68 001 -5117 -572 -6257 Sep 2014
79243 09/ 12/ 13 Fort Walton Concrete Company New Rec Center —Ready Mix Concrete 88, 000. 00 001 - 5117 -572 -6257 Sep 2014
General Fund 1, 708, 096. 11
69781 08/ 16/ 10 Lewis, Longman & Walker Legal Representation for Soundside 16, 654. 38 109 -2000 -552 -3101 TBD
78654 06/ 28/ 13 Mayer Electric Light fixtures for Brooks Street 3, 813. 19 109 -2000 -552 -4659 Oct 2013
76139 09/ 04/ 12 TBE Group, Inc. ( Cardno TBE) Phase B — Happy Food Stores 64, 373. 00 109 -5498 -552 -6159 Jun 2014
CRA Fund 84, 840. 57
69738 09/ 03/ 10 Goodwyn, Mills & Cawood Standard Document Development 8, 000. 00 401 - 1300 -536 -3100 ongoing
79040 08/ 23/ 13 Southeastern Sash & Door Replace Exterior Door 1, 856. 00 401 - 1300 -536 -4640 Sep 2013
75290 07/ 03/ 12 Goodwyn, Mills & Cawood
Water Tanks - Preliminary Survey 40.00 401 - 1310 -533 -4680 Sep 2013
75525 06/ 22/ 12 Layne- Central Co
Remove and inspect Well Pump at Well #09 5, 916. 50 401 - 1310 -533 -4680 Oct 2013
78054 04/ 16/ 13 Control Systems & Instrument Repair Well # 3 2, 000. 00 401 - 1310 -533 -4680 Dec 2013
78465 06/ 07/ 13 Tank pro, inc. elevated & 7, 200. 00
ground storage tank cleaning 401 - 1310 -533 -4680 Dec 2013
79158 09/ 04/ 13 Allied Services Hazardous Waste Removal 2, 000. 00 401 - 1340 -533 -4400 Sep 2013
75639 07/ 05/ 12 Goodwyn, Mills & Cawood Lift Station # 3 Wet Well 18, 500. 00 401 - 1350 -535 -3100 Dec 2013
73610 01/ 18/ 12 Data Flow Systems Narrowband Adjustment 1, 890. 00 401 - 1350 -535 -4680 Nov 2013
78718 07/ 12/ 13 Control Systems & Instrument Install power Conditioning Line reactors at GC 4, 645. 00 401 - 1350 -535 -4680 Dec 2013
78832 07/ 26/ 13 Data Flow Systems Telemetry System Up -Grade 88, 517. 00 401- 1350 -535 -6402 Dec 2013
79007 08/ 21/ 13 Rexel Southern Electric Electrical Up -grade ( Telemetry) 346. 48 401 - 1350 -535 -6402 Dec 2013
78680 07/ 03/ 13 Davidson Ford Ford F -650 Flat Bed 66, 791. 38 401 - 1350 -535 -6404 Dec 2013
69655 08/ 27/ 10 Hatch, Mott MacDonald Pump Station # 1 - Project 272075 2, 570. 00 401 -5031 - 535 -3100 Dec 2013
74015 12/ 29/ 11 Hatch, Mott MacDonald PS # 1 & Force Main Eval & Eng Report - Project 8, 036. 01 401 - 5031 -535 -6361 Dec 2013
76649 01/ 03/ 13 American Cast Iron Pipe PS # 1 & Force Main 80, 851. 47 401- 5031 -535 -6361 Dec 2013
76909 04/ 04/ 13 Ferguson Waterworks Force Main Valves & Appurtenances 9, 881. 06 401 - 5031 -535 -6361 Dec 2013
76910 03/ 12/ 13 Fortiline, Inc Force Main Valves & Appurtenances 1, 596. 04 401 -5031 -535 -6361 Dec 2013
76989 11/ 28/ 12 Consolidated Pipe PS #1 Force Main 34, 399. 00 401 - 5031 -535 -6361 Dec 2013
76990 03/ 12/ 13 American Cast Iron Pipe PS #1 & Force Main 25, 628. 25 401 - 5031 -535 -6361 Dec 2013
77018 02/ 05/ 13 Gilbert Pump & Mechanical Materials for PS # 1 & Storage Tank 654, 233. 20 401 - 5031 -535 -6361 Dec 2013
77019 12/ 03/ 12 Hatch Mott MacDonald Construction Services for PS # 1 387, 447. 70 401 - 5031 -535 -6361 Dec 2013
77028 06/ 28/ 13 HD Supply Waterworks PS # 1 & Force Main 4, 252. 82 401 -5031 - 535 -6361 Dec 2013
77242 08/ 15/ 13 Andress Engineering Electric Chain Hoist 6, 893. 36 401 -5031 -535 -6361 Dec 2013
77243 03/ 19/ 13 Thompson Fabricating Misc Metals for PS # 1 15, 262. 00 401 - 5031 -535 -6361 Dec 2013
77244 01/ 04/ 13 Eco -Tech PS #1 & Storage Tank 2, 400. 00 401 -5031 -535 -6361 Dec 2013
77327 07/ 17/ 13 Florida Detroit Diesel - Allison Emergency Generator 30, 737. 30 401 - 5031 -535 -6361 Dec 2013
77439 05/ 30/ 13 Ready Mix USA Concrete 7, 461. 00 401 -5031 -535 -6361 Dec 2013
77440 04/ 23/ 13 Graybar Electric Co Square D Electrical Gear Package 29, 381. 00 401 - 5031 -535 -6361 Dec 2013
U: \ Finance \Budget \Budget 13 - 14 \Comprehensive \35 Carryovers FY13 to FY14 9/ 18/ 2013 12: 44 PM
77443 01/ 29/ 13 American Cast Iron Pipe PS # 1 & Storage Tank 46, 149. 48 401 -5031- 535 -6361 Dec 2013
77474 02/ 01/ 13 Skyline Steel Rock Anchors for PS #1 & Storage Tank 49, 737. 20 401 -5031 -535 -6361 Dec 2013
77712 08/ 15/ 13 C. W. Roberts Contracting Limerock, Pavement Patching 244, 850. 00 401 -5031 -535 -6361 Dec 2013
77786 03/ 12/ 13 Red Valve Co Cone Sleeve & Upgrade 1, 620. 00 401 -5031 -535 -6361 Dec 2013
77808 07/ 22/ 13 Fort Walton Concrete Floor and Grout Mix 22, 106. 50 401 - 5031 -535 -6361 Dec 2013
77860 03/ 22/ 13 Southwestern Suppliers Rebar & Plastic Bolster for PS # 1 & Storage Tank 18, 913. 63 401 - 5031 -535 -6361 Dec 2013
124265* Concrete Modular Systems Electrical Building 63, 099. 12 401 - 5031 -535 -6361 Dec 2013
73289 10/ 13/ 11 Fabre Engineering Hurlburt Reuse Construction Drawings
