READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 19, 2014 — FAA Grant Application_Air Traffic Control Tower at DTS — reading text
Part 5 of 5. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 37-FAA Grant Application_Air Traffic Control Tower at DTS.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
PAVEMENT MARKING (YELLOW) 2,300 SFT 1.60] $ 3,680.00 0.83 1,909.00 | $ 6.95 15,985.00 3.98} $ 9,154.00
FDOT 700-4 _|PAINTED PAVEMENT MARKING (WHITE OR BLUE) 100 SFT 1.60] $ 160.00 4.00 400.00 161.02 16,102.00 3.98] $ 398.00
FOOT 700-5 |ROADWAY DELINEATOR 72 EACH 200.00 | $ 14,400.00 69.44 4,999.68 225.17 16,212.24 46.57 | S$ 3,353.04
FDOT 711-1 |12° SOLID WHITE THERMOPLASTIC 85 LFT 50.00 | $ 4,250.00 9.65 820.25 192.03 16,322.55 | $ 13.63 | $ 1,158.55,
FDOT 711-2 |24" SOLID WHITE THERMOPLASTIC 15 LFT 30.00 | $ 450.00 20.00 300.00 1,095.51 | $ 16,432.65 | $ 27.26| $ 408.90
F-162-5.1 '7-FOOT HIGH CHAIN LINK FENCE WITH BARBED WIRE 100 LFT 50.00 | $ 5,000.00 98.00 9,800.00 165.43 | $ 16,543.00 | $ 222.54] $ 22,254.00
F-162-5.2 REMOVE AND DISPOSE OF EXISTING FENCE 70 LFT 6.00} $ 420.00 4.93 345.10 237.90 | $ 16,653.00 | $ 11.36] $ 795.20
02512-1 16-INCH PVC WATER LINE 170 LEFT 20.00} $ 3,400.00 55.88 9,499.60] $ 98.61] $ 16,763.70 | $ 62.46 10,618.20
02512-2 16-INCH BACKFLOW PREVENTER 1 EACH 6,000.00 6,000.00 5,800.00 5,800.00 | $ 16,873.84 16,873.84 | $ 7,042.77 7,042.77
02512-3 I8-INCH PVC WATER LINE 425 LFT 23.00 9,775.00 33.65 14,301.25] $ 39.96 16,983.00 | $ 49.98 21,241.50
02512-4 10.4 HP PUMP, COMPLETE 1 EACH 2,000.00 2,000.00 4,500.00 4,500.00 | $ 17,094.41 17,094.41 | $ 8,493.76 8,493.76
02512-5 3-INCH C900 PVC WATER LINE 175 LET 10.00 1,750.00 32.00 5,600.00 | $ 98.31 17,204.25] $ 17.04 2,982.00
02512-6 3-INCH RPZ BACKFLOW PREVENTER 1 EACH $ 2,500.00 | $ 2,500.00 3,400.00 3,400.00 | S$ 17,314.98 | $ 17,314.98 | $ 3,975.76 3,975.76
02512-7 10-INCH DIRECTIONAL BORE 875 LET $ 70.00 | $ 61,250.00 67.77 59,298.75] S$ 19.91] $ 17,421.25 51.12 44,730.00
02512-8 4-INCH SANITARY SEWER LINE 25 LET $ 18.00} $ 450.00 | $ 17.20] $ 430.00 | $ 701.42 | $ 17,535.50 62.48 1,562.00
02512-9 FIRE HYDRANT, COMPLETE 1 EACH $ 1,500.00 | $ 1,500.00 | $ 3,900.00 | $ 3,900.00 17,645.84 | $ 17,645.84 4,827.70} $ 4,827.70
02540-1 ISEPTIC TANK AND FIELD, COMPLETE 1 Ls $ 20,000.00 20,000.00 | $ 22,000.00 22,000.00 17,756.13 17,756.13 28,398.25 | $ 28,398.25
L-105-7.1 REMOVE BEACON i us $ 25,000.00 25,000.00] $ 1,500.00 1,500.00 17,866.61 17,866.61 2,839.83 | $ 2,839.83
L-129-5.1 ELECTRICALLY OPERATED ACCESS GATE AND ACCESS CONTROL 1 ts $ 90,000.00 90,000.00 | $ 25,000.00 25,000.00 16,542.98 16,542.98 77,425.00 | $ 77,425.00
TOTAL SCHEDULE D - SITEWORK & UTILITIES 2,010,915.00 1,225,619.93 889,992.85 $ 1,318,927.61
SCHEDULE E - AIRFIELD LIGHTING & VAULT MODIFICATIONS
L-110-5.1 feu :;CTRICAL CONDUIT, 1-2" SCHEDULE 40 PVC 2,800 LET 6.00 | $ 16,800.00 4.04 11,312.00 0.05 | $ 140.00 | $ 12.76 35,728.00
L-110-5.2 ELECTRICAL CONDUIT, 2-2" SCHEDULE 40 PVC 7,000 LET 10.00} $ 70,000.00 6.46 45,220.00 0.02 | $ 140.00 9.06 63,420.00
L-110-5.3 ELECTRICAL CONDUIT, 3-2" SCHEDULE 40 PVC 530 LFT 14.00 7,420.00 9.62 5,098.60 0.26 | $ 137.80 31.82 16,864.60
L-110-5.4 IDIRECTIONAL BORE, 2-2* HDPE 220 LFT 50.00 11,000.00 45.91 10,100.20 0.63] $ 138.60 34.82 7,660.40
L-110-5.5 DIRECTIONAL BORE, 3-2" HOPE 780 LFT $ 65.00 50,700.00 43.21 33,703.80 0.18 140.40 39.46 30,778.80
L-115-5.1 ICOMMUNICATIONS/ELECTRICAL HANDHOLE 26 EACH $ 1,350.00 35,100.00 919.23 23,899.98 5.52 143.52 1,432.81 37,253.06
L-115-5.2 ELECTRICAL HANDHOLE - VEHICLE RATED 2 EACH 3,000.00 000.00 5,450.00 10,900.00 73.07 146.14 12,970.95 25,941.90
L-127-5.1 AIRFIELD LIGHTING CONTROL AND MONITORING SYSTEM 1 ls 100,000.00 100,000.00 54,000.00 54,000.00 148.75 148.75 67,878.41 67,878.41
L-128-5.1 12 STRAND MULTIMODE FIBER OPTIC CABLE 5,000 LFT 6.00 30,000.00 1.80 9,000.00 0.03 150.00 2.04 10,200.00
L-128-5.2 6 STRAND MULTIMODE FIBER OPTIC CABLE 2,800 LFT 5.00 14,000.00 2.57 7,196.00 0.05 140.00 2.85 7,980.00
L-128-5.3 12 STRAND SINGLE MODE FIBER OPTIC CABLE 3,000 LET 5.00 15,000.00 0.93 2,790.00 0.05 150.00 | $ 1.12 3,360.00
L-128-5.4 3 1-1/4-INCH INNERDUCT 440 LFT 0.80} $ 352.00 9.55 4,202.00 7.78 3,423.20 | $ 6.51 2,864.40
TOTAL SCHEDULE E - AIRFIELD LIGHTING & VAULT MODIFICATIONS $ 356,372.00 217,422.58 4,998.41 309,929.57
RSSH
-FORM AS15 - BID TABULATION SUMMARY AND ANALYSIS
DESTIN AIRPORT - AIR TRAFFIC CONTROL TOWER
FAA AIP Project Number TBD
DOT Project Number AQw81/42390629401
Bid Opening: JULY 30, 2014 @ 10:00 AM
RS&H
Date Prepared: JULY 31, 2014
Prepared by: ARI
RS&H Project No: 201-0940-009
File Name: Destin ATCT_Bid Tabulation_7-30-14
Engineer's Estimate Speegle C Inc. Lord & Son Construction, Inc. Cathey Ce & uc,
: M
MTEM NO. TEM DESCHIETION QUANTITY] UNIT [ESTIMATED ESTIMATED TOTAL iit price | totacprice | uNirprIcE | ToTALPRICE | UNITPRICE TOTAL PRICE
UNIT PRICE PRICE
SCHEDULE F - ALLOWANCE FOR FORCE ACCOUNT WORK
01210-2 PERIMETER FENCE SIGNAGE ALLOWANCE 1 ALLOW | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00
01210-3 UTILITY ALLOWANCE 1 ALLOW [| $ 150,000.00 | $ 150,000.00} $ _ 150,000.00 | $ 150,000.00} $ _ 150,000.00 | $ 150,000.00 | $ 150,000.00 | $ 150,000.00
01210-4 TREE MITIGATION 1 ALLOW [S$ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | S$ 50,000.00
TOTAL SCHEDULE F - ALLOWANCE FOR FORCE ACCOUNT WORK $ 205,000.00 $ 205,000.00 $ 205,000.00 $ 205,000.00
SCHEDULE G - ALLOWANCE FOR COMMUNICATION AND TECHNOLOGY PACKAGE
01210-5 [COMMUNICATION AND TECHNOLOGY PACKAGE 1 I ALLOW |S 50,000.00 I $ 50,000.00 | $ 50,000.00 I $ 50,000.00 | $ 50,000.00 I $ 50,000.00 | $ 50,000.00 I $ 50,000.00
TOTAL SCHEDULE G - ALLOWANCE FOR COMMUNICATION AND TECHNOLOGY PACKAGE I $ 50,000.00 I $ 50,000.00 [ $ 50,000.00 I $ 50,000.00
TOTAL SCHEDULE A+B+C+D+E+F+G - UNIT PRICE CALCULATION $ 4,952,287.00 $ 4,304,944.41 $ 3,666,899.11 $ 5,855,409.48
TOTAL SCHEDULE A+B+C+D+E+F+G - AS-READ FROM BID FORM N/A $ 4,304,835.00 $ 4,837,400.00 $ 5,885,136.10
RS&H
RS@H, INC
Date Prepared: July 31,2014
Prepared By: A. Jacksonv /B. Wente
RS&H Project No. 201-0940-009
IDESTIN AIRPORT - AIR TRAFFIC CONTROL TOWER
FAA AIP Project TBD
IDOT Project Number AQW81/42390629401
IBid Opening: July 30, 2012 @ 10:00 AM CDT
Bid Tabulation Summary
AS READ BID SCHEDULE AS-READ ALOUD
BIDDER A+B+C+D+E+F+G GRAND TOTAL
Engineer's Estimate $4,952,287.00 N/A
Cathey Construction & D LLC $5,855,136.10 $5,855,136.10
Lord and Son, Inc. $4,837,400.00 $4,837,400.00
S) le Construction, Inc. $4,304,835.00 $4,304,835.00
Bid Tabulation Errors
BIDDER TABULATION ERRORS NET EFFECT ON GRAND TOTALS
The total contract price calculated by the sum of all pay items which is (unit price x estimated
Cathey Construction & Development LLC Minor rounding errors on various unit prices. quantity) is $5,855,409.48.
The total contract price calculated by the sum of all pay items which is (unit price x estimated
The sum of all bid schedules does not match the total (as-read) amount. Unit prices quantity) is $3,666,899.11. The amount deviates substantially from the as-read amount of
Lord and Son, Inc. contained in the bid vs reatly from industry norms. $4,837,400.00. The difference is $1,170,500.89.
The total contract price calculated by the sum of all pay items which is (unit price x estimated
Ss) le Construction, Inc. Rounding errors on various unit prices. quantity) is $4,304,944.41-
Bid Requirement Checklist
BIDDER
Cathey Construction &
Development LLC Lord and Son, Inc. Speegle Construction, Inc.
Bid Requirement
Bid Form
Bid Schedule
Bid Bond
Bidder's Qualification Questionnaire
Certificate as to Corporate Principal
Certified Copy of Resolution of Board of Directors
Proposal Fi ’: Noncollusion Affidavit
Proposal Fi ; No Contact Clause
Proposal Indemnification and Hold Harmless
Proposal : Conflict of Interest Disclosure Form
Proposal Fi : Drug-Free Workplace Certification
Proposal : Certification of Contractor Regarding Trench Safety
Proposal : Insurance Compliance
Proposal : Affidavit — Worker's Compensation
Proposal : Equal Employment Opportunity Report Statement
Proposal 17: Certification of Nonsegregated Facilities
Proposal Form 18: Buy American Certification
Proposal Form 19: Disadvantaged Business Enterprise Program
Proposal Form 20: Disadvantaged Business Enterprise Letter of Intent
Proposal Form 21: Performance of Work by Subcontractors
Proposal Form 22: E-Verify Compliance Certification x xX
Responsive Bid? Yes No Yes
N
1,000
0 250 500
ee Feet N
Pog Alternative #1
N
tH
&
=
©
£
2
<
g
= e iS
= 3 6 Ss
73) 2, a i]
ow 25 =
a ao 6 °
se ge uilE
oO oO £
= 2 8 Sr
fray = @®D i.
3 a Oa ae
© ‘Eg
Oo
=)
i
[e}
<2) |