READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — August 19, 2014 — FAA Grant Application_Air Traffic Control Tower at DTS — reading text

Part 4 of 5. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 37-FAA Grant Application_Air Traffic Control Tower at DTS.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Federal standards and requirements, so no deviation or modification to standards set forth in the advisory circulars, or State standard, is necessary other than those previously approved by the FAA. €) proprietary or written so as to restrict competition. At least o manufacturers can meet the specification. 3. The development includedCto be included) in the plans is depicted on the airport layout plan approved by the FAA. 4. Development that is ineligible for AIP funding has beer(will be) omitted from the plans and specifications. 2, b9 pop for the procurement of equipment are not «will not 5. The process control and acceptance tests required for the project.by standards contained in Advisory Circular 150/5370-10 a included in the project specifications. 6. Ifa value engineeri use is incorporated into the contract, concurrence waé (will be) obtained from the FAA. 7. The plans and specifications incorporate will incorporate applicable requirements and recommendations set forth in the Federally approved environmental finding. Page 1 of 2 Yes No N/A A ORRAR A [| OF fF oF oO O CO OoRoodda June 28, 2005 Yes No N/A 8. For construction activities within or near aircraft operational areas, the requirements,contained in Advisory Circular 150/5370-2 have been (will be)discussed with the FAA as well wow [| [ | as incorporated into the specifications, and a safety/phasing plan has FAA's concurrence, if required. 9. The project was((uil bs) physically completed without Federal participation in costs due to errors and omissions in the plans wa and specifications that were foreseeable at the time of project C LJ design. | certify, for the project identified herein, responses to the forgoing items are accurate as marked and have prepared documentation attached hereto for any item marked “no” that is correct and complete. OKALOOSA COUNTY , FLORIDA lame of Sponso, ee ee (gnated Official Representative) Sunil H9#man/ A ., IAP (Typed Name of Sponsor's Designated Official Representative) Airports Director (Typed Title of Sponsor's Designated Official Representative) July 31, 2014 (Date) Page 2 of 2 June 28, 2005 R SSH 10748 Deerwood Park Boulevard S O 904-256-2500 Jacksonville, Florida 32256 F 904-256-2501 rsandh.com July 31, 2014 Mr. Tracy Stage, A.A.E. Deputy Director Northwest Florida Regional Airport 1701 State Road. 85 N Eglin AFB, Florida 32542-1498 (850) 585-7086 RE: Okaloosa County Airport System Destin Airport Air Traffic Control Tower RS&H Project No. 201-0940-009 Bid Tabulation and Analysis Summary Dear Mr. Stage, On July 30, 2014 at 10:00 AM at Okaloosa County offices located at 302 N. Wilson Street, Crestview, Florida, bids were opened for the Destin Airport Air Traffic Control Tower project. A total of three bids were received. Bids were read aloud at that time. Enclosed is the detailed bid tabulation for your review. RS&H has reviewed all bids submitted for conformity to contract requirements. All three bid forms contained mathematical (rounding) errors and all bidders completed the bid forms correctly. RS&H considers two of three bids responsive. Bid Submitted As-Read Total Bid Amount Responsive Bid Cathey Construction & Dev. LLC $5,855,136.00 Yes Lord and Son Construction, Inc. $4,837,400.00 No Speegle Construction, Inc. $4, 304,835.00 Yes Lord and Son Construction, Inc.'s bid form contained a substantial error. The total as-read bid schedule amount found on page P-21 of the bid form was $4,837,400.00. This value deviated substantially from unit price calculation of the total bid schedule of $3,666,899.11. The difference in cost is $1,170,500.89, which constitutes a major error and an unbalancing of several of the contract bid items, specifically items Schedule D and Schedule E. For that reason we consider the Lord and Sons bid as non-responsive. RS&H, Inc FL Cert. Nos. AACO01886+1B26000956-LCC000210 R SSH rsandh.com RS&H's analysis of Speegle Construction, Inc.'s bid indicates that their bid is responsive, complete and they are qualified to perform the proposed construction. RS&H recommends that the construction contract be awarded to Speegle Construction, Inc. in the amount of $4,304,835.00, subject to legal, DBE and financial review and approval by the Okaloosa County Board of County Commissioners. Should you have any questions, please call me at (904) 256-2192, Sincerely, Nut Bradley J. Wenfe, P.E. Project Manager Enclosure cc: RS&H — File, Randy Musser, Aaron Jackson FORM A515 - BID TABULATION SUMMARY AND ANALYSIS RS&H DESTIN AIRPORT - AIR TRAFFIC CONTROL TOWER Date Prepared: JULY 31, 2014 FAA AIP Project Number TBD Prepared by: ARJ DOT Project Number AQw81/42390629401 RS&H Project No: 201-0940-009 Bid Opening: JULY 30, 2014 @ 10:00 AM File Name: Destin ATCT_Bid Tabulation_7-30-14 Engineer's Estimate Speegle C in, Inc. Lord & Son Ci ction, Inc. Cathey C ion & Lc. TTEMNO, ZTTEM DESCRIPTION QUANTITY) UNIT [ESTIMATED ESTIMATED TOTAL] Unit price | ToTaLpRICe | uNITPAICE | TOTALPRICE | UNIT PRICE TOTAL PRICE UNIT PRICE PRICE [SCHEDULE A - AIR TRAFFIC CONTROL TOWER P-001-1 [AIR TRAFFIC CONTROL TOWER excluding work under Item No. P-001-2 1 ls [S$ 1,698,500.00[$ _1,698,500.00] $_1,994,000.00 $ 1,994,000.00] $_1,848,298.00| $ 1,848,298.00] $ 3,269,228.05 | $ 3,269,228.05 P-001-2 |WORK REQUIRED BY SPECIFICATION 02465 (ACIP) 2415 uF Ss 100.00 | $ 241,500.00] $ 55.86 | $ 134,901.90] $ 53.99 | $ 130,385.85] $ 80.97 $ 195,542.55 16168-1 EMERGENCY GENERATOR SYSTEM 1 us [$s 85,000.00] $ 85,000.00] $ 175,000.00 $ 175,000.00] $__ 271,324.00 | $ 271,324.00[ $ _ 179,484.49 | $ 179,484.49 [TOTAL SCHEDULE A - AIR TRAFFIC CONTROL TOWER $___ 2,025,000.00 $____2,303,901.90 $__2,250,007.85 $ 3,644,255.09 SCHEDULE B - FURNITURE, FIXTURES, & EQUIPMENT 01210-1 [FURNITURE ALLOWANCE 1 | ws fs 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 [TOTAL SCHEDULE B - FURNITURE, FIXTURES, & EQUIPMENT I [s 5,000.00 [s 5,000.00 [s 5,000.00 [s 5,000.00 SCHEDULE C - AIR TRAFFIC CONTROL TOWER EQUIPMENT 1700-1 JATC EQUIPMENT PACKAGE 1 [| ts [s 300,000.00] $ 300,000.00[ $ 298,000.00 | $ 298,000.00[$ 261,900.00 $ 261,900.00] $ 322,297.21] $ 322,297.21 TOTAL SCHEDULE C - AIR TRAFFIC CONTROL TOWER EQUIPMENT l [s 300,000.00 Is 298,000.00 [s 261,900.00 [s 322,297.21 SCHEDULE D - SITEWORK & UTILITIES P-100.3-1 [MOBILIZATION AND GENERAL CONDITIONS 1 us |s__300,000.00[$ 300,000.00] $ 79,500.00] $ 79,500.00] $ 37,684.90 $ 37,684.90[$ 67,019.88 $ 67,019.88 P-102-10.1_|SAFETY AND SECURITY 1 us| s 100,000.00[ $ 100,000.00] $ 7,000.00 | $ 7,000.00]$ 14,116.67] $ 14,116.67|$ 22,718.60 $ 22,718.60, P-103-4.1__ [ENGINEER'S FIELD OFFICE 1 us__ [$s _ 80,000.00| $ 80,000.00] 36,400.00] $ 36,400.00] $ 76,333.70 | $ 76,333.70 | $ 8,519.48 | $ 8,519.48 P-104-5.1 PROJECT SURVEY AND STAKEOQUT 1 us $ 75,000.00 | $ 75,000.00 | $ 56,000.00 | $ 56,000.00 | $ 12,241.80] $ 12,241.80 | $ 11,359.30 | $ 11,359.30 FDOT 102-1_ [MAINTENANCE OF TRAFFIC. 1 us__[s__50,000.00['s 50,000.00 | $ 5,800.00 | $ 5,800.00] $ 12,352.09 $ 12,352.09|[$ 76,675.29 $ 76,675.29 P-105-5.1__ | TEMPORARY CONSTRUCTION ITEMS 1 us [$100,000.00] $ 100,000.00 | $ 4,200.00 | $ 4200.00[$ 12,462.38 | $ 12,462.38 | $ 2,839.83 | $ 2,839.83 P-151-4.1__ [UPLAND AND WETLAND CLEARING AND GRUBBING 15 Ac |s 8,000.00 | $ 12,000.00] $ 21,593.33 | $ 32,300.00] $ 8,381.77 | § 12,572.66 | $ 6,247.62 |§ 9,371.43 P-151-4.2 IWETLAND TREE CLEARING 4.0 AC $ 10,000.00 | $ 40,000.00 | $ 14,050.00 | $ 56,200.00 | $ 3,170.74 | $ 12,682.96 | $ 6,247.62 | $ 24,990.48 P-152-4.1__ [UNCLASSIFIED EXCAVATION 4,700 cyo |[s 10.00] $ 47,000.00 | $ 4.53 | $ 21,291.00] $ 2.72|$ 12,784.00 | $ 6.59 | $ 30,973.00 P-152-4.2 _ [MUCK EXCAVATION 3,700 cyo_|s 15.00 | $ 55,500.00 | $ 17.19 $ 63,603.00 | $ __3.49[$ 12,913.00 | $ 15.34 | $ 56,758.00 P-152-4.3 [BORROW EXCAVATION (FROM OFF-SITE SOURCE) 1,500 cyo_[s 20.00] $ 30,000.00 | $ 26.60|$ 39,900.00] $ 8.68|$ 13,020.00 | $ 22.15|$§ 33,225.00 02240-1__ [DEWATERING 1 us [$s 87,500.00] $ 87,500.00] $ _28,300.00| $ 28,300.00]$ 13,124.09] $ 13,124.09 | $ 6,815.58 | § 6,815.58 P-156-5.1__ [EROSION AND SEDIMENTATION CONTROL 1 us [s 3,000.00 | $ 3,000.00] $ 6,500.00 | $ 6,500.00]$ 13,234.38 | $ 13,234.38|$ 22,718.60 $ 22,718.60 P-156-5.2 [SILT FENCE 10,700 ut |[s 2.00| $ 21,400.00 | $ 4.79[$ 51,253.00] $ 1.25/$ 13,375.00 | $ 2.56|$ 27,392.00 P-156-5.3 _ |INLET / OUTLET PROTECTION 1 EACH |[$ 500.00 | $ 500.00] $ 700.00 | $ 700.00[$ 13,454.95] $ 13,454.95 | $ 567.97| $ 567.97 P-156-5.4__ [SYNTHETIC BALE BARRIER 170 LAT [Ss 50.00] $ 8,500.00] $ 21.18 $ 3,600.60 | $ 79.80 | $ 13,566.00 | $ 10.22|$ 1,737.40 P-156-5.5 _ | RUBBLE DITCH LINING RIP RAP WITH FOOT TYPE D-2 FILTER FABRIC 40 syo_ |[s 75.00 | $ 3,000.00] $ 127.50] $ 5,100.00] $ 341.89 | $ 13,675.60 | $ 79.52|$ 3,180.80 FOOT 160-1_[12-INCH STABILIZED SUBGRADE (LBR 40) 10,300 syo_ [s 5.00] $ 51,500.00 | $ 479|$ 49,337.00] $ 1.34] $ 13,802.00] $ 11.59/$ 119,377.00 FOOT 285-1_|OPTIONAL BASE COURSE, GROUP 4 300 syo_|s 35.00 | $ 10,500.00] $ 15.67|[$ 4,701.00 $ 46.32 $ 13,896.00 | $ 13.18 | $ 3,954.00 FDOT 285-2_|OPTIONAL BASE COURSE, GROUP 6 10,000 syo_[s 35.00[$ 350,000.00 | $ 15.80 $ 158,000.00] $ 1.40 [$ 14,000.00 | $ 16.70] $ 167,000.00 FDOT 334-1_|2-INCH ASPHALTIC CONCRETE, 19.0 MM SUPERPAVE 1,150 TON [S$ 100.00 | $ 115,000.00 93.91 | $ 107,996.50] $ 12.28[$ 14,122.00 | $ 107.91 |$ 124,096.50 FDOT 334-2_[1 1/2-INCH ASPHALTIC CONCRETE, 12.5 MM SUPERPAVE 850 TON |$ 90.00] $ 76,500.00 101.18] $ 86,003.00] $ 16.74] $ 14,229.00 | $ 111.32] $ 94,622.00 FDOT 350-1_[8-INCH CEMENT CONCRETE PAVEMENT 300 syo_|[s 55.00| $ 16,500.00 80.00] $ 24,000.00] $ 47.79 [$ 14,337.00 | $ 85.19 $ 25,557.00 P-610-5.1__|SIDEWALK 130 syo_|s 5.00| $ 650.00 56.92| § 7,399.60 | $ 4.67 |$ 5,807.10 | $ 63.61 | $ 8,269.30 P-610-5.2 _|CONCRETE ISLAND 5 syo_|[s 100.00 $ 500.00 360.00 | $ 1,800.00] $ 59.55[$ 297.75 | $ 238.55 [$ 1,192.75 P-610-5.3 [CONCRETE WHEEL STOP 2 EA_|[s 400.00] $ 800.00] $ 80.00| § 160.00] $ 38.60] $ 77.20|$ 56.80] $ 113.60 FDOT 430-1_[12-INCH CLASS III RCP 275 ut [s 80.00] $ 22,000.00 | $ 33.82|$ 9,300.50] $ 53.74/$ 14,778.50 | $ 42.03 $ 11,558.25 FDOT 430-2 _[6-INCH C900 PVC PIPE 30 LFTs 20.00] $ 600.00] $ 31.67[$ 950.10] $ 496.29 | $ 14,888.70 | $ 32.94] $ 988.20 FDOT 430-3_ [FDOT INLET TYPE C 2 EA |s 2,000.00 | $ 4,000.00 | $ 350.00 | $ 1,700.00] $ 7,499.48 | $ 14,998.96 | $ 1,931.08 | $ 3,862.16 FDOT 430-4 [TRIPLE 12-INCH MITERED END SECTION 2 EA |s _4,000.00/$ 8,000.00 $ 3,050.00 | $ 6,100.00] $ 7,554.63 | $ 15,109.26 | $ 738.35 | $ 1,476.70 LS-100-1_ [LANDSCAPING 1.0 us [s 4,000.00 | $ 4,000.00 $ 7,500.00 | $ 7,500.00]$ 15,219.54] $ 15.219.54[$ 58,667.39 $ 58,667.39 RSSH FORM A515 - BID TABULATION SUMMARY AND ANALYSIS DESTIN AIRPORT - AIR TRAFFIC CONTROL TOWER FAA AIP Project Number TBD DOT Project Number AQw81/42390629401 Bid Opening: JULY 30, 2014 @ 10:00 AM RS&H Date Prepared: JULY 31, 2014 Prepared by: ARI RS&H Project No: 201-0940-009 File Name: Destin ATCT_Bid Tabulation_7-30-14 Engineer's Estimate Speegle Ce Tne. Lord & Son Ci inc. Cathey Construction & Tic. ITEM INO: ITEM DESCRIPTION QUANTI SUNT CO TGe (MATEO TOTAL! unit pRIcE | TOTALPRICE | UNITPRICE | TOTALPRICE UNIT PRICE TOTAL PRICE T-901-5.1 SEEDING 2.0 ACRE |$ = 1,400.00 2,800.00 | $ 8,350.00 | $ 16,700.00 7,664.91 15,329.82 4,430.13] $ 8,860.26 T-904-5.1 |SODDING 15,700 syD 3.50 54,950.00 3.21] $ 50,397.00 0.98 15,386.00 0.40/$ 6,280.00 T-905-5.1 |TOPSOILING, OBTAINED ON SITE OR REMOVED FROM STOCKPILE 1,400 CcYD 18.00 25,200.00 12.21|$ 17,094.00 14.11 15,554.00 11.36 | $ 15,904.00 T-908-5.1 MULCHING 2.0 ACRE 800.00 1,600.00 2,300.00 | $ 4,600.00 7,830.34 15,660.68 3,975.76 | $ 7,951.52 FDOT 700-1 _|STOP SIGN, R1-1, 36-INCH BY 36-INCH 1 EACH 180.00 | $ 180.00 250.00 | $ 250.00 15,770.97 15,770.97 306.70} $ 306.70 FDOT 700-2 _|HANDICAP PARKING SIGN 1 EACH 250.00 | $ 250.00 180.00 180.00] $ 15,881.26 15,881.26 369.18 | $ 369.18 FDOT 700-3 |PAINTED

Download this text file with its original spacing ↓