READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 04-10-2007 regular agenda — reading text
Part 11 of 12. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13432-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Board just change or delete a particular section.
The City Attorney stated that in relationship to this project and Development Order, Staff has
proposed a Development Order and the applicant has agreed to it except for the words in
Paragraph 2 which state ' to construct the boardwalk along the entire She advised
waterfront.'
the Board could change language of the Development Order; however, there is a motion on the
floor to limit discussion to what has been newly presented since the issue went to Council last
month, and that this Development Order is the same as approved by the Board the first time.
Mr. Seip held up the document entitled " Presidio Condominiums. . . A Strategic Location for an
Enhanced Lifestyle" and questioned whether the document was in previous packets. The City
Attorney announced the name of the document, for the record, and that it included documents
presented by Mr. McMichael dated January 12, 2007, that walk through the application. The
CDS Director confirmed that is what the document was and that it was included in the March 7
CRA Meeting agenda, the March 27 Council meeting agenda, as well as the agenda for the
CRA meeting today.
DRAFT
CRA 04- 04- 07
Also discussed was a letter dated March 28, 2007 to Ms. McKim from Todd
Wilkinson, Vice
President of Environmental Services, which was not included in
previous packages but was
included in the package for today' s
meeting.
Mr. Seip cited Sec. 12.459. 5, Site Development Standards, of the Code which states: ' A
public
boardwalk shall be permitted within the 500~foot rear-
yard setback area, located immediately
landward of the mean high water line; the public boardwalk is from the 25
exempt percent
limitation on impervious coverage within the 50- foot rear
yard setback.' Mr. Seip stated that
according to City codes, the boardwalk belongs landward to the mean high water line. He
stated the letter from Mr. Wilkinson to Ms. McKim is
contradictory in that it states the boardwalk
will extend waterward of the existing seawall.
Mr. Seip questioned whether Council approval was
given to change the ordinance. He cited the
opinion that if Council approval was not given, the letter is not valid. He also stated that
consideration should be taken in that the applicant has asked not to have to build the entire
boardwalk, and that this part of the order should be
changed.
The City Attorney interrupted, and stated the
question should be directed to the author of the
letter in question.
Todd Wilkinson, Vice President of Environmental Services, Inc. of Destin, the environmental
consultant firm working on the Presidio, is working with the
developers to modify the existing
land lease and dock permits, which includes a
walkway along the shoreline, extending
waterward of the existing seawall. Mr. Wilkinson stated this
process is permissible and has
been done in the past.
The City Attorney asked Mr. Wilkinson asked if there is a conflict in the two terms of waterward
and landward. Mr. Wilkinson responded not necessarily, and the City Attorney stated she felt
the issue has been cleared up.
Mr. Rettie continued his questioning, asking for an
explanation why landward and waterward are
not in conflict.
Mr. Wilkinson clarified the seawall does not have to be at the mean
high water line, it can be
landward of the mean high water line and in this case it is; it is toward the water side of the
seawall vs. the landward side.
Mr. Rettie accepted this explanation.
There was no other public input.
Mr. Reed moved to forward a recommendation to Council for the
proposed development
order, to include Condition 6, for the amended site
plan for Presidio Condominiums with
the following conditions:
1. The approval is based on the application and site
plan developed by BVM Architect,
project # 03002, originally dated 8/ 13/ 03 ( not all plans are numbered or dated), the plans
and elevations dated October 14, 2003, and the
survey received October 14, 2003 by BVM
Architect as amended by the following three plans: CRA Resubmittal- Site Plan Ground
level Parking C- 1. 1. undated, South Elevation A-2. 2 dated 12/ 20/ 04, Third level Plan-
Monumental stairs at pool deck/Second level plan at pool deck A-03. dated 12/ 20/ 04, and
the as- built foundation survey, dated 12 December 06.
2. The applicant shall construct the boardwalk
along the entire waterfront, protecting the
trees that are in close
proximity to the water. The design of the boardwalk shall be
approved by the CRA Board of Commissioners prior to issuance of the building permit. ~ ~ '\
CRA 04- 04- 07
The boardwalk shall be constructed prior to a Certificate of Occupancy for the building.
3. Prior to issuance of a Certificate of Occupancy, the City Attorney and Public Works
Director shall review and approve the easement documentation for the City' s boardwalk
along Santa Rosa Sound to assure the easement is properly assigned and described.
Said documentation shall include the City' s right to maintain said boardwalk.
4. Prior to issuance of a Certificate of Occupancy a fire department key box must be
installed.
5. Prior to issuance of a Certificate of Occupancy, the applicant shall submit the
condominium documents to the City Attorney for her review and approval.
6. All site plans shall be properly signed, dated, and stamped.
Mr. Kennedy seconded motion.
Mr. Covey noted his objection to the condition that the applicant be required to construct the
boardwalk along the entire waterfront.
Mr. Rettie noted his written comments and stated his questions # 3 and # 4 should be considered
before voting on this issue. The City Attorney advised the issues need to be discussed for the
record, and Mr. Rettie could read them directly or address them in a shorter form
Mr. Rettie addressed Question 3 as follows: ' Our Code in Chapter 12. 34 states, " The ORC
shall. . .review and make recommends to the Board of the CRA regarding code compliance for
applications for site plan approval.' Also, ' A copy of the written rendition of the determination of
the ORC shall be mailed. . .' The second paragraph in Ms. McKim' s 28 March 07 memo to the
Board states the staff recommendation has not changed; this support data package does not
seem to contain this required written rendition by the ORC to explain why the staff
recommendation has not changed in light of new information brought to light at the 27 March 07
Council meeting. Can this Board legally deliberate when the staff provided support data does
not contain this required support data?
The Chairman advised she does not believe these comments relate to the motion that is on the
floor, and that the previous motion was to limit discussion to any changes that have been
received since the last time the Board discussed the project, and that the only thing that has
changed is that a drawing was provided that was not included in the information included in the
agenda package of last month.
The City Attorney confirmed the Board is only dealing with newly admissible evidence that has
been raised since this has been seen before.
Mr. Rettie addressed his Question 4 as follows: " Code Sec. 12. 34. 04 states, ' Members of the
ORC. . . shall consist of. . . public works chief engineering technician" A drawing in our data
package delivered to me on 29 March 07 states the retaining wall is exempt from setbacks.
Can this Board legally make a decision without the required rendition from the chief engineering
technician to explain how this structure may be exempt from the 1 a- feet setback requirement of
Sec. 12.459. 5( 4) d?
The Chairman inquired if Mr. Rettie' s comments were dealt with last month, since she was
absent from that meeting she cannot be sure. The City Attorney advised she did not recall a
discussion regarding a ORC review.
Mr. Rettie stated there should be a new ORC based on the new drawings with comments from
the Public Works Chief Engineering Technician as stated in the Code.
1
p... ~
o~
CRA 04- 04- 07
The City Attorney advised that would be taken as discussion for Mr. Rettie' s comments on his
questions 4, and reminded there is a motion on the floor.
The Chairman called for the vote on the motion and it carried by a vote of 5 to 2 with
Bobo, Gossom, Kennedy, Pagliari, and Reed in favor and Covey and Rettie opposed.
The meeting continued.
ADJOURNMENT
As there was no further business, the meeting adjourned at 7: 30 p. m.
Ive
Page 7 of 7
r\
DR~
4 Apr07 Motion by Bob Rettie for Presidio regarding inadequate CRA Support Data package dated 28 Mar 07
I am in favor of moving the Presidio project forward however, I move to table deliberations on this project until
the Board members receive a support data package that contains adequate documentation for the CRA Board to be
1e to make an informed decision. Reasons are as follows:
1. Our code states, " Sec. 12.33. 02 Fees. Land use and zoning application requests shall be accompanied by
such fees and changes as may be established the City Council by resolution for proper filing."
I find no documentation to show the required fee accompanied the application.
At the 27Mar07 Council meeting, I believe the City Attorney said the fees should have been paid for these changes.
I also believe at that Council meeting, there was testimony that no fee had been paid for this change.
Our code states, " Sec. 12.45. 05. Review Considerations... the agency shall in what respects
consider...
the plan is in conformity with all applicable regulations." Can this board legally recommend approval
of
