approved by the DEPARTMENT: Phase lA - FPID: 421997-3-38-01 - Design & Permitting - From SR 85N to Key Lime Place • Design Final Construction Plans to widen P.J. Adams Parkway from SR 85N to Key Lime Place from a two-lane to a four-lane roadway. The work shall include construction of tum lanes, traffic separators, sidewalks, bike lanes, storm water facilities, curb and gutter, and roadway signing and striping. • Construct westbound left tum lane on P .J. Adams Parkway at Key Lime Place. • Construct eastbound left tum lane on P.J. Adams Parkway at Villacrest Drive. • Construct new signalized intersection at P.J. Adams Parkway and Key Lime Place. • Obtain required permits from all environmental and regulatory agencies. Phase lB-FPID: 421997-3-48-01-Right-of-Way- From SR 85N to Key Lime Place • Obtain right-of-way from SR 85N to Key Lime Place via warranty deed(s) based on proposed right-of-way identified in final design plans. • Obtain temporary construction easements (TCE's), ifrequired. Updated 2/24/2014 Phase 2A- FPID: 421997-4-38-01 - Design & Permitting- From Key Lime Place to Ashley Dr. • Design Final Construction Plans to widen P.J. Adams Parkway from Key Lime Place to Ashley Drive from a two-lane to a four-lane roadway. The work shall include construction of tum lanes, traffic separators, sidewalks, bike lanes, storm water facilities, curb and gutter, and roadway signing and striping. • Construct westbound left tum lane on P.J. Adams Parkway at Ashley Drive. • Construct eastbound left tum lane on P.J. Adams Parkway at Villacrest Drive. • Obtain required permits from all environmental and regulatory agencies. Phase 2B- FPID: 421997-4-48-01- Right-of-Way-From Key Lime Place to Ashley Drive • Obtain right-of-way from Key Lime Place to Ashley Drive via warranty deed(s) based on proposed right-of-way identified in final design plans. • Obtain temporary construction easements (TCE's), ifrequired. Phase 3A- FPID: 421997-5-38-01 - Design & Permitting- From Ashley Drive to Wildhorse Dr. • Design Final Construction Plans to widen P.J. Adams Parkway from Ashley Drive to Wildhorse Drive from a two-lane to a four-lane roadway. The work shall include construction of tum lanes, traffic separators, sidewalks, bike lanes, storm water facilities, curb and gutter, and roadway signing and striping. • Construct westbound left tum lane on P .J. Adams Parkway at Wildhorse Drive. • Construct westbound right tum lane on P.J. Adams Parkway at Northview Drive. • Construct eastbound left tum lane on P.J. Adams Parkway at Northview Drive. • Construct eastbound right tum lane on P.J. Adams Parkway at Wildhorse Drive. • Upgrade existing signalized intersection at P.J. Adams Parkway and Wildhorse Dr. • Obtain required permits from all environmental and regulatory agencies. Updated 2/24/2014 Phase 4A- FPID: 421997-6-38-01 - Design & Permitting- From Wildhorse Dr. to SR 8 (1-10) • Design Final Construction Plans to widen P.J. Adams Parkway from Wildhorse Drive to SR 8 (1-10) from a two-lane to a four-lane roadway. The work shall include construction of tum lanes, traffic separators, sidewalks, bike lanes, storm water facilities, curb and gutter, and roadway signing and striping. • Construct westbound left tum lane on P.J. Adams Parkway at Cadle Drive. • Construct westbound left tum lane on P .J. Adams Parkway at Antioch Road. • Construct westbound left tum lane on P .J. Adams Parkway at Garrett Pit Road. • Construct eastbound left tum lane on P .J. Adams Parkway at Addison Place Apartments. • Obtain required permits from all environmental and regulatory agencies. The County shall issue through its procurement process a Request for Proposal (RFP) to solicit proposals from various firms to design, permit and acquire right-of-way for Phases 1-4 of the P.J. Adams Parkway/Western Bypass Widening Project in Okaloosa County, as outlined above. The contract award will be based on the highest ranking from the Board of County Commissioner's approved Selection Committee. An electronic copy of the draft RFP prepared by the County shall be submitted to the District Three Planning Office for review and approval prior to advertisement and release of the RFP. With respect to the evaluation of each technical proposal submitted, the Selection Committee members will independently evaluate and score the Proposals. The County shall then announce the scores and ranking for each proposal. Updated 2/24/2014 Exhibit B SCHEDULE OF SERVICES P.J. Adams Parkway/Western Bypass Widening Project, Okaloosa County (Design: FPID's 421997-3-38-01, 421997-4-38-01, 421997-5-38-01, 421997-6-38-01) (Right-of-Way: FPID's: 421997-3-48-01, 421997-4-48-01) Estimated Project Production Schedule April 2014 Advertise Request for Proposals (RFP) May 2014 Pre-proposal Meeting July 2014 Board of County Commissioner A ward I Issue Notice to Proceed January 2015 Begin Partial R/W Acquisition (Phase 1 and 2) June 2015 Complete Design and Permitting (Phase 1 through 4) January 2016 End R/W Acquisition I Project Closeout Updated 2/24/2014 Exhibit C SCHEDULE OF FUNDING P.J. Adams Parkway/Western Bypass Widening Project, Okaloosa County (Design: FPID's 421997-3-38-01, 421997-4-38-01, 421997-5-38-01, 421997-6-38-01) (Right-of-Way: FPID's: 421997-3-48-01, 421997-4-48-01) Estimated total cost as set forth in the DEPARTMENT'S adopted work program for this PROJECT is $4,400,000. The estimated COUNTY share of the PROJECT is $2,200,000. The County portion is to be supplied by donation of right of way. The estimated DEPARTMENT share of the PROJECT is $2,200,000. Northwest Florida Regional Transportation Planning Organization Regional Network w+• ~ Legend· ' Escambia, Santa Rosa, Okaloosa and - Strategic lntermodal System (SIS) • Strategic lntermodal System (SIS) Hub Walton Counties, Florida and Baldwin County, Alabama I I Strategic lntermodal System (SIS) - lntracoastal VVaterway/Channel - Regional Transportation Net\Wrk I I Regional Transportation Net'IM>rk - Conceptual I I Regional Transportation Net'M'.>rk - Channel • Regional Transportation Net'M>rk Hub e Regional Transit Hub \(ii e Regional Transit Hub - Conceptual rta_net04/rtanet_12_18_07.mxd December 18, 2007 FY 2011-2015 NORTHWEST FLORIDA REGIONAL TRANSPORTATION PLANNING ORGANIZATION REGIONAL NETWORK PRIORITIES TABLE 1 COMMITTED PROJECTS NOT SUBJECT TO PRIORITY RANKING Construction SIS Facility From To Improvement County Schedule YIN 1-1 IO y Airport Boulevard Interchange Escambia Underway y South end Choctawhatchee IJnderway US331 US98 Four-lane Walton Bay Bridge SR20 N White Point Road Mid-Bay Bridge Connector Four-Lane Okaloosa Underway Mid-Bay Bridge N Mid-Bay Bridge RangeRoad Four-lane Okaloosa Underway Connector North of CSX IJnderway SR 281 (Avalon Blvd.) N South of Commerce Road Four-Lane Santa Rosa Railroad SR281 (Avalon South of Commerce N US90 Four-lane Santa Rosa FY20IO Boulevard) Road y General Bond Okaloosa Regional Airport Interchange Okaloosa Underway SR123/SR85 South Boulevard SR281 (Avalon South of Moors FY2011 N North of CSX Railroad Four-Lane Santa Rosa Boulevard) Lodge FY 2011-2015 NORTHWEST FLORIDA REGIONAL TRANSPORTATION PLANNING ORGANIZATION REGIONAL NETWORK PRIORITIES TABLE 2 NON-STRATEGIC INTERMODAL SYSTEMS (NON-SIS) PROJECT PRIORITIES RTPO Priority Facility From To Improvement County SR281 (Avalon Boulevard) I-10 South of Moors Lodge Fmrr-lane Santa Rosa I US90A (Nine Mile Road) SR297 (Pine Forest Road) US29 Four-lane Escambia 2 US98 Escambia County Line Okaloosa County Line Other Capacity Improvements Santa Rosa 3 US90 Escambia County Line Okaloosa County Line Other Capacity Improvements Santa Rosa 4 SR295 (Navy Blvd/New SR292 (GulfBeach New Warrington Road-Leg C Other Capacity Improvements Escambia 5 Warrington Road) Highway) US90A (Nine Mile Road) I-IO SR297 (Pine Forest Road) Other Capacity Improvements Escambia 6 SR727 (Fairtield Drive) SR298 (Lillian Highway) US90 (Mobile Highway) Other Capacity Improvements Escambia 7 SR292 (Gulf Beach SR I73 (Blue Angel

Download this text file with its original spacing ↓