I MW
Department andlor
r-
BUILDING PERMIT FEES Sec. 3. 02. 05)*
A surcharge will be collected in accordance with and for the purposes stated in F. S. 468. 631 and F. S. 553. 721. Res. 2010- 25 09/28/ 10
General Fees
Building permit processing fee $ 22. 50 Res. 2010-25 09/28/ 10
25. 75 per submittal SFD $ 51. 50
Revisions to approved permit, per submittal per submittal MF $ 77.25 per Res 2008- 15 04/ 08/ 08
submittal Com
Penalty for commencement prior to permitting 300% of permit fee or $250, whichever is greater Res 07- 15 09/ 05/ 07
Sec. 3. 01. 05)
Change of contractor, transfer of permit
Prorate balance of work Res 2003- 01 1/ 28/ 03
Sec. 3. 01. 12)
Notice of Commencement ( NOC) ( Sec. 713. 135) 5. 00
Expired perniit ( Sec. 3. 01. 08) Re- issuance requires fee to be paid Res 07- 15 09/ 05/ 07
Conditional: no work has commenced and permit has
Refund of permit fee ( Sec. 3. 01. 10) Res 07- 15 09/ 05/ 07
not expired; requires written notice to the BO
Construction Permit Fees
No permit required for cosmetic work only, such as
carpet, tile, painting, landscaping, etc. Exceptions Res 07- 15 09/ 05/ 07
500 or less
include any structural change or any work that
requires an inspection per the FBC.
39. 00 for the first thousand, plus $ 6. 60 for each
501 to $50, 000 Res. 2010- 25 09/28/ 10
Permit based on value thousand or fraction thereof, to and including $50, 000
of work, includes
360. 55 for first $ 50,000 plus $ 5. 25 for each
labor, materials, site
50, 001 to $ 100, 000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10
work, and design fees
including $ 100, 000
623. 00 for the first $100, 000 plus $ 4.00 for each
100, 001 to $500,000 additional thousand or fraction thereof to and Res. 2010- 25 09/28/ 10
including $500, 000
2,219.00 for the first $500, 000 plus $2. 75 for each
500, 001 and up Res. 2010- 25 09/28/ 10
additional thousand or fraction thereof
Plan check fee 50% of building fee ( Sec. 3. 02. 06) Res 2009- 35 09/ 09/ 09
Threshold building transmittal/processing fee/ ICC
I$ 206. 00 Res 2008- 15 04/ 08/ 08
Moving Fee 113. 50 Res 2008- 15 04/ 08/ 08
59. 50 plus $ 9. 45 per 2, 000 sq ft above 20, 000 sq ft Res. 2010- 25 09/28/ 10
Demolition Fee
or fraction thereof
Additional Inspection Fee 38. 00 Res. 2010- 25 09/28/ 10
Additional Inspection Fee - after hours 50. 00 per hour (2 hour minimum) Res 2014- 2 02/ 11/ 14
Re- Inspection Fee ( the building inspector returns First - $38. 00
to the job site to review corrected work denied on Second - $ 38. 00 Res. 2010- 25 09/ 28/ 10
the previous inspection for the same violation) Third and more - $ 115. 50
38. 00 Res. 2010-25 09/28110
Certificate of Occupancy
Certificate of Completion 38. 00 Res. 2010-25 09/28/ 10
Temporary Certificate of Occupancy 270. 50 Res. 2010-25 09/28/ 10
Mechanical Permits and Inspection
Permit Fee Base 39. 00 Res. 2010- 25 09/ 28/ 10
15. 00 for the first $ 1, 000 or fraction thereof of the
Inspection of heating, ventilation, ductwork, air valuation of installation plus $ 2.75 for each Res. 2010- 25 09/ 28/ 10
conditioning and refrigeration systems
additional $ 1, 000 or fraction thereof
Inspecting repairs, alterations, and additions on 5. 80 plus $3. 45 for each additional $ 1, 000 or
Res. 2010-25 09/ 28/ 10
existing systems I
fraction thereof
nas01. fwb. local\ Users\ Finance\ Finance\ Fee Schedule\ 2023, April\ 23. 04. 01 Comprehensive Fee Schedule FY 2022- 23
r
Ordimmee
Inspecting Boilers
Boiler Inspections 40. 00 Res. 2010- 25 09/ 28/ 10
Reinspection of a heating, ventilation, air First - $38. 00
Second - $ 38. 00 Res. 2010- 25 09/ 28/ 10
conditioning or refrigeration system, or boiler
inspection ( reinspection same as above) Third and more - $ 115. 50
Inspection for permitting temporary operation of First - $38. 00
Second - $ 38. 00 Res. 2010- 25 09/ 28/ 10
heating, ventilating, refrigeration, or air condition
system ( reinspection same as above) Third and more - $ 115. 50
Reduced by 50% housing, unless permit is for
Rehabilitation of substandard minimum of $5. 00. Repairs, alterations and additions Res 2003- 01 1/ 28/ 03
to an existing system under $500. 00
Plumbing and Gas Permits
Base Permit Fee 39. 00 Res. 2010- 25 09/ 28/ 10
Plus, per plumbing fixture, floor drain or trap, 3. 45 Res. 2010- 25 09/ 28/ 10
including water and drainage pipe
Plus, per sewer connection 12. 00 Res. 2010- 25 09/ 28/ 10
Plus, per water heater and/ or vent 3. 15 Res. 2010- 25 09/ 28/ 10
For installation, alteration or repair of water piping