READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2023-01 Amending Comprehensive Fee Schedule for FY 2022-23 — reading text

Part 7 of 15. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-41892-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

I MW Department andlor r- BUILDING PERMIT FEES Sec. 3. 02. 05)* A surcharge will be collected in accordance with and for the purposes stated in F. S. 468. 631 and F. S. 553. 721. Res. 2010- 25 09/28/ 10 General Fees Building permit processing fee $ 22. 50 Res. 2010-25 09/28/ 10 25. 75 per submittal SFD $ 51. 50 Revisions to approved permit, per submittal per submittal MF $ 77.25 per Res 2008- 15 04/ 08/ 08 submittal Com Penalty for commencement prior to permitting 300% of permit fee or $250, whichever is greater Res 07- 15 09/ 05/ 07 Sec. 3. 01. 05) Change of contractor, transfer of permit Prorate balance of work Res 2003- 01 1/ 28/ 03 Sec. 3. 01. 12) Notice of Commencement ( NOC) ( Sec. 713. 135) 5. 00 Expired perniit ( Sec. 3. 01. 08) Re- issuance requires fee to be paid Res 07- 15 09/ 05/ 07 Conditional: no work has commenced and permit has Refund of permit fee ( Sec. 3. 01. 10) Res 07- 15 09/ 05/ 07 not expired; requires written notice to the BO Construction Permit Fees No permit required for cosmetic work only, such as carpet, tile, painting, landscaping, etc. Exceptions Res 07- 15 09/ 05/ 07 500 or less include any structural change or any work that requires an inspection per the FBC. 39. 00 for the first thousand, plus $ 6. 60 for each 501 to $50, 000 Res. 2010- 25 09/28/ 10 Permit based on value thousand or fraction thereof, to and including $50, 000 of work, includes 360. 55 for first $ 50,000 plus $ 5. 25 for each labor, materials, site 50, 001 to $ 100, 000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10 work, and design fees including $ 100, 000 623. 00 for the first $100, 000 plus $ 4.00 for each 100, 001 to $500,000 additional thousand or fraction thereof to and Res. 2010- 25 09/28/ 10 including $500, 000 2,219.00 for the first $500, 000 plus $2. 75 for each 500, 001 and up Res. 2010- 25 09/28/ 10 additional thousand or fraction thereof Plan check fee 50% of building fee ( Sec. 3. 02. 06) Res 2009- 35 09/ 09/ 09 Threshold building transmittal/processing fee/ ICC I$ 206. 00 Res 2008- 15 04/ 08/ 08 Moving Fee 113. 50 Res 2008- 15 04/ 08/ 08 59. 50 plus $ 9. 45 per 2, 000 sq ft above 20, 000 sq ft Res. 2010- 25 09/28/ 10 Demolition Fee or fraction thereof Additional Inspection Fee 38. 00 Res. 2010- 25 09/28/ 10 Additional Inspection Fee - after hours 50. 00 per hour (2 hour minimum) Res 2014- 2 02/ 11/ 14 Re- Inspection Fee ( the building inspector returns First - $38. 00 to the job site to review corrected work denied on Second - $ 38. 00 Res. 2010- 25 09/ 28/ 10 the previous inspection for the same violation) Third and more - $ 115. 50 38. 00 Res. 2010-25 09/28110 Certificate of Occupancy Certificate of Completion 38. 00 Res. 2010-25 09/28/ 10 Temporary Certificate of Occupancy 270. 50 Res. 2010-25 09/28/ 10 Mechanical Permits and Inspection Permit Fee Base 39. 00 Res. 2010- 25 09/ 28/ 10 15. 00 for the first $ 1, 000 or fraction thereof of the Inspection of heating, ventilation, ductwork, air valuation of installation plus $ 2.75 for each Res. 2010- 25 09/ 28/ 10 conditioning and refrigeration systems additional $ 1, 000 or fraction thereof Inspecting repairs, alterations, and additions on 5. 80 plus $3. 45 for each additional $ 1, 000 or Res. 2010-25 09/ 28/ 10 existing systems I fraction thereof nas01. fwb. local\ Users\ Finance\ Finance\ Fee Schedule\ 2023, April\ 23. 04. 01 Comprehensive Fee Schedule FY 2022- 23 r Ordimmee Inspecting Boilers Boiler Inspections 40. 00 Res. 2010- 25 09/ 28/ 10 Reinspection of a heating, ventilation, air First - $38. 00 Second - $ 38. 00 Res. 2010- 25 09/ 28/ 10 conditioning or refrigeration system, or boiler inspection ( reinspection same as above) Third and more - $ 115. 50 Inspection for permitting temporary operation of First - $38. 00 Second - $ 38. 00 Res. 2010- 25 09/ 28/ 10 heating, ventilating, refrigeration, or air condition system ( reinspection same as above) Third and more - $ 115. 50 Reduced by 50% housing, unless permit is for Rehabilitation of substandard minimum of $5. 00. Repairs, alterations and additions Res 2003- 01 1/ 28/ 03 to an existing system under $500. 00 Plumbing and Gas Permits Base Permit Fee 39. 00 Res. 2010- 25 09/ 28/ 10 Plus, per plumbing fixture, floor drain or trap, 3. 45 Res. 2010- 25 09/ 28/ 10 including water and drainage pipe Plus, per sewer connection 12. 00 Res. 2010- 25 09/ 28/ 10 Plus, per water heater and/ or vent 3. 15 Res. 2010- 25 09/ 28/ 10 For installation, alteration or repair of water piping

Download this text file with its original spacing ↓