READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 6, 2015 — Traffic — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Traffic — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
SERVICE AREA: TRANSPORTATION
DEPARTMENT/PROGRAM: TRAFFIC DIVISION
PROGRAM DESCRIPTION: The Traffic Engineering/Operations Division’s mission is to administer,
manage, maintain and operate the Advanced Traffic Control System (ATCS), this includes the safe and efficient
continuous operation of all signalized intersections. A Florida Department of Transportation (FDOT) joint
program assists with the expenses associated with the administration and operations of the ATCS. The Traffic
Divisions will work closely with the public, FDOT, local governments, contractors, and designers to help
manage and provide within our means the safest system and highest level of service for the traveling public.
REVENUE: Traffic Division is funded within the County Transportation Trust Fund. Supporting revenue of
the County Transportation Trust Fund is: fuel tax, intergovernmental revenue, charges for services,
miscellaneous revenues, and transfers. Additional funding for the Traffic division comes from an annual FDOT
joint program.
MAJOR ACCOMPLISHMENTS LAST YEAR:
Ø Managed traffic signal timing and vehicle detection operations for the following FDOT construction
projects: FDOT US 98 Cody Flyover, SR 123 North Flyover.
Ø Implemented a travel time data collection system to monitor traffic flow through the US 98 Cody flyover
construction project and to assist Hurlburt AFB with an origin destination survey between Navarra and
Eglin.
Ø Managed and coordinated repairs between FDOT and Information Systems for the main north south
backbone fiber trunk cut in the area of the SR 123 flyover construction project.
Ø Assisted FDOT in the design of traffic signals for the US 98 widening project in Destin, intersection
improvements for SR 189 (Beal) and SR 393 (Mary Esther)
Ø Ensure proper functionality of all components of signalized intersections; maintaining all communications
equipment in both the field and office; and overseeing all construction projects in the County related to any
resurfacing, signal, or utility work.
Ø Purchased and installed several uninterruptable power devices at major intersections which provide backup
power for signalized intersection during intermittent power outages.
PROGRAM GOAL:
Traffic Engineering Goals:
Long Range Goal: The engineering division will continue to manage the ATCS and signalized intersections in a
direction encouraging enhancement and upgrades of the existing systems.
Short Range Goals:
1. Seek new technologies used in Intelligent Transportation Systems.
2. Manage existing timings and adjust as necessary.
3. Implement these newer technologies in the ATCS.
4. Seek additional video and traffic monitoring capabilities.
5. Improve traffic flow along major arterials with emphasis on peak AM and PM traffic.
6. Plan and design for a traffic operations management center.
Traffic Operations Goals:
Long Range Goal: The operations division will continue providing a high standard of customer service, and
maintenance operations.
Short Range Goals:
1. Continue working closely with citizens to maintain efficient operations.
2. Continue working closely with contractors and designers.
3. Continue meeting industry standards to maintain a high quality product.
4. Continue upgrading and integrating newer technologies into the existing ATCS.
5. Improve operations and reduce maintenance costs at critical intersections – a critical intersection is defined
as one that requires law enforcement traffic control during power outages and/or equipment failures that
cause flashing operation.
6. Protect and locate all underground utilities associated with the system (both fiber and copper); ensure proper
functionality of all components of signalized intersections; maintain all communications equipment in both
the field and office; and oversee all construction projects in the County related to any resurfacing, signal, or
utility work.
KEY OBJECTIVES:
1. Ensure budgetary, personnel and purchasing functions comply with County policies and procedures.
2. Provide timely and courteous assistance to citizens.
3. Provide effective and thorough review of all signal design and timing activities.
4. Continue the addition of closed circuit cameras for monitoring only traffic conditions and operations.
5. Continue to evaluate more effective alternatives for traffic signal maintenance.
6. Provide timely response to Public works, County Administrator and County Commission and requests.
7. Monitor and assess future needs for Intelligent Transportation System through use of state of the art
technology.
8. Operate and maintain continuously 182 traffic control devices of which 127 are signals 43 school beacons
268 highway lights and safeguards over 100 miles of underground utilities.
PERFORMANCE MEASURES:
Actual Estimated Adopted
Performance Measures
FY 14 FY 15 FY 16
Number of Employees 6 6 6
Input Operating Budget $170,594 $172,841 $215,084
Capital Outlay $32,200 $42,200 $79,050
Routine Intersection Inspections planned 1,718 862 1,770
Traffic Signal Timing Issue Citizen/Sheriff 102 69 0
Emergency Issue: flash or dark 102 50 0
Output
Utility Locate Tickets Issued: 4569 2744 5,000
Incident: Traffic Equip Damage 20 23 0
Total Work orders 550 282 0
Efficiency
Routine Intersection Inspections completed 1466 758 1,770
Utility Locate Tickets that Require Processing 1205 496 1,100
Effectivenes
Routine Inspections 85% 88% 100%
s Funding Ratio FDOT to County 1.56 : 1 1.79 : 1 3.07 : 1
HISTORICAL STAFFING SUMMARY:
Category FY13 FY14 FY15 FY16
Full-time Administrative & Support 4 4 4 4
Full-time Management & Professional 1 1 1 1
Total 5 5 5 5
EXPENDITURES:
Expenditures Budget
FY13 FY14 FY15 FY16 FY15/FY16 Increase/
Category Actual Actual Original Approved +/- Decrease
Personnel Services $308,436 $324,453 $341,637 $353,349 $8,733 3.4%
Operating Expenses $114,622 $142,683 $172,841 $215,084 $42,243 24.4%
Capital Outlay $23,326 $45,513 $43,014 $79,050 $36,036 83.8%
Debt Service $0 $0 $0 $0 $0 0%
Grants & Aids $0 $0 $0 $0 $0 0%
Other Uses $0 $0 $0 $73,512 $0 0%
Total $446,384 $512,649 $557,492 $720,995 $163,503 29.3%
ACCOUNTS:
FY14 FY15 FY16 FY15/FY16 Increase/
Code Category Approved Approved Approved +/- Decrease
10 SALARIES & WAGES $244,394 $253,918 $251,538 -$2,380 -0.9%
Adjustment Due To Retirements
20 BENEFITS $82,445 $87,719 $101,811 $14,092 16.1%
Adjustments In Stipends
34 CONTRACT SERVICES $21,000 $17,010 $17,010 $0 0%
40 TRAVEL & PER DIEM $2,950 $3,300 $3,300 $0 0%
41 COMMUNICATIONS SERVICES $2,500 $2,500 $2,500 $0 0%
42 FREIGHT & POSTAGE $1,000 $1,000 $1,000 $0 0%
43 UTILITY SERVICES $30,000 $30,000 $60,000 $30,000 100.0%
Increase In Lighting Maintained By Agreement With FDOT
44 RENTS & LEASES $20 $20 $20 $0 0%
45 RISK MANAGEMENT ALLOCATION $9,526 $10,557 $8,068 -$2,489 -23.6%
Provided By Risk Management
46 REPAIR & MAINTENANCE $71,719 $72,443 $93,295 $20,852 28.8%
47 PRINTING & BINDING $50 $50 $30 -$20 -40.0%
49 MISCELLANEOUS CHARGES $100 $5,500 $6,075 $575 10.5%
51 OFFICE SUPPLIES $300 $300 $300 $0 0%
52 OPERATING SUPPLIES $27,279 $26,011 $19,336 -$6,675 -25.7%
Largely Fuel Savings
54 BOOKS/PUBS/SUBS & MEMBERSHIPS $950 $950 $950 $0 0%
55 TRAINING & EDUCATION EXPENSES $3,200 $3,200 $3,200 $0 0%
60 CAPITAL OUTLAY $32,200 $43,014 $79,050 $36,036 83.8%
Vehicle And Replace Pole Trailer, Traffic Equipment
99 RESERVES $0 $0 $73,512 $73,512 0%
Cash available for maintenance and upgrades
TOTAL $529,633 $557,492 $720,995 $163,503 29.3%
