Okaloosa County BOCC — July 19, 2016 — Engineers Cost Estimate
Engineers Cost Estimate in the July 19, 2016 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-generated OCR reading text.
Preserved among the July 19, 2016 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1342). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used June 20, 2016; the meeting date was corrected using the agenda/minutes heading and matching source filename.
Original publication
Engineers Cost Estimate
Date
July 19, 2016
Publisher
Okaloosa County Board of County Commissioners
Where to find it
1
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)
Source identity and meeting date checked. OCR text has not received independent human proofreading; consult the scan for names, numbers and uncertain characters.
HOW FAR THIS HAS BEEN CHECKED
File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Machine OCR from page images of the unchanged preserved PDF with source page boundaries retained. Not independently human proofread; consult the original scan for uncertain characters.
Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.
Engineers Cost Estimate — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Engineer's Estimated Value of Constructed Improvements for College Blvd Turn Lane
DESCRIPTION
1.0" Layer of Asphalt Pavement
1" Asphalt-Milling of Existing Pavement
2.0" Layer of Asphalt Pavement
6" Graded Aggregate Base
12" Compacted Subbase
12" Flat Curb
Signage & Striping
5' Wide Concrete Sidewalk
4' Wide Concrete Separator
Type "C" Storm Inlet
15" RCP Storm Piping
ROW Stabilization (Sod)
Prepared: 04/06/2016
CEFCO College Blvd
Based on Plans Dated: 10/08/2015
UNIT
SY
sy
SY
SY
SY
LF
EA
SF
SF
EA
LF
SY
ESTIMATED COST TO COMPLETE TOTAL =
20% ESTIMATED COST TO COMPLETE TOTAL =
Page 1 of 1
QTY REMAINING UNIT PRICE AMOUNT
2,535 $10.00 $25,350.00
2,535 $10.00 $25,350.00
830 $15.00 $12,450.00
830 $22.00 $18,260.00
830 $4.00 $3,320.00
173 $11.00 $1,903.00
2 $1,000.00 $2,000.00
2,050 $4.50 $9,225.00
505 $5.50 $2,777.50
2 $1,750.00 $3,500.00
86 $30.00 $2,580.00
900 $2.50 $2,250.00
$108,965.50
$21,793.10
Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — July 19, 2016 — Engineers Cost Estimate.” July 19, 2016. Engineers Cost Estimate. Crypt of Echoes evidence ID LED-2026-9bc03c1517db4fd29a738df530dcd251. http://127.0.0.1:58097/evidence/LED-2026-9bc03c1517db4fd29a738df530dcd251. Accessed [date].
Catalogue citation: Okaloosa County Board of County Commissioners, Engineers Cost Estimate, meeting materials for July 19, 2016. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=11687&MeetingID=1342
Preserved county public-record source. Third-party attachments may retain their original rights.