administrative
expertise required, identify individuals with
the expertise, describe items to be
inspected, list equipment required for inspection,
outline the frequency and timing of
inspection ( continuous or periodic), outline
inspection procedures, and record keeping requirements. The QAP shall be submitted
to NRCS for review and concurrence with the final draft
plans and specifications.
11. Provide inspection in accordance with the
QAP.
2
12. Provide copies of site maps to appropriate Federal and State agencies for environmental
review. Sponsor will notify NRCS of environmental clearance, modification of
construction plans, or any unresolved concerns as well as copies of all pernlits, licenses,
and other documents required by Federal, State, and local statutes and ordinances prior
to solicitation for installation of the works of improvement.
13. Ensure that any special requirements for compliance with environmental and/or cultural
resource laws are incorporated into the
proj ect.
14. Designate an individual to serve as liaison between the Sponsor and NRCS, listing his
or her duties, responsibilities, and authorities. Furnish this information in writing to
NRCS.
15. Ensure that all contracts for design and construction services will be procured in
accordance with procedures prescribed in the Code of Florida and Federal regulations
applicable to the Sponsor, including the provisions contained in Attachment B to this
agreement.
16. Arrange for and conduct final inspection of the works of improvement. A Professional
Engineer registered in the State of Florida furnished by the Sponsor shall certify that the
project was installed in accordance with contractual requirements.
17. For structural measures, prepare and submit for approval an Operation and Maintenance
Plan prior to completion of construction. Upon completion of the work from the
Sponsor, assume responsibility for operation and maintenance of the works of
improvement installed.
18. If needed, upon completion of emergency protection measures and the elimination of
the threat, take action to bring the measures up to reasonable standards by other means
and/or authority. Unless the measures are brought up to reasonable standards, the
sponsor will not be eligible for future funding under the Emergency Watershed
Protection program.
19. Provide final as- built drawings and quantities to NRCS. As- built drawings and
quantities shall be certified by the engineer furnished by the Sponsor. The engineer
furnished by the Sponsor shall certify final quantities.
20. Pay the contractor as provided in the contract( s).
Submit billings for reimbursement to
NRCS on Form SF- 270, Request for Advance or Reimbursement.
21. Administer their action under this agreement in accordance with 7 CFR 3015, 7 CFR
3016, OMB Circulars A- 102, A-87, A- 133, and other rules referenced in 7- CFR 3015.
22. Comply with the nondiscrimination provisions of the Equal Opportunity clause and the
Notice to Contracting Local Organizations of the Requirement for Certifications of
Nonsegregated Facilities clause, FOrnl SCS- AS- 83, attached hereto as Attachment B.
23. Hold and save NRCS free from any and all claims or causes of action whatsoever
resulting from the obligations undertaken by the Sponsor under this agreement or
resulting from the work provided for in this agreement. Retain all records dealing with
the award and administration of contract( s) for 3 years from the date of the
sponsor' s
submission of the FINAL Request for Reimbursement or until final audit findings have
been resolved, whichever is longer. If any litigation is started before the
expiration of
the 3- year period, the records are to be retained until the litigation is resolved or the end
3
of the 3- year period, whichever is longer. Make such records available to the
Comptroller General of the United States or his or her duly authorized representative
and accredited representatives of the U. S. Department of Agriculture or cognizant audit
agency for the purpose of making audit, examination, excerpts, and transcripts.
24. Provide 100 percent of the costs of works of
improvement not eligible for federal cost
share.
25. Complete all required work under this agreement,
including but not limited to
construction of works of improvement, fmal inspection, payment of all contractors,
submissions of as- builts and final quantities, etc.
C. NRCS WILL:
1. Provide 75 percent of the cost of constructing the emergency watershed
protection
measures described in Section A.
2. Provide the value of the Sponsor in-kind contribution not to exceed 25
percent of the
actual cost of constructing the emergency watershed described in
protection measures
Section A.
3. Assist Sponsor and Sponsor' s engineer establish design parameters and
approve same
as set forth in B. 8.
4. Not be substantially involved with the technical or contractual administration of this
agreement, but will provide advice and counsel as needed.
5. Make payment to the Sponsor covering NRCS' s share of the cost,
upon receipt and
approval of Form SF- 270, Request for Advance or Reimbursement, with supporting
documentation.
6. Upon notification of the completion of construction, NRCS shall promptly review the
performance of Sponsor to detennine if it has met the requirements of this agreement
and fund expenditures as agreed.
7. Designate an individual to serve as liaison between the NRCS and the Sponsor. The
major duties, responsibilities and authorities of the liaison will be to review and concur
with specifications and drawings for the DSR, assist in the fmal
inspection of the works
of improvement, certify along with the Sponsor' s Professional
Engineer when all work
has been completed according to the specifications and
drawings, and review the SF-
270 and supporting documents, approve, sign, and submit the SF- 270 and
supporting
documents to NRCS for reimbursement to the Sponsor.
8. Review and comment on draft plans, specifications, and
QAP as described in B. 9 and
B.10.
D. IT IS MUTUALLY AGREED.:
1. This agreement shall become null and void 90 calendar
days after the date NRCS has
executed this agreement if a solicitation for bids has not been
publicly advertised or a
contract has not been awarded.
4
2. This agreement shall be effective
upon signature by NRCS. All work required under
this agreement shall be in accordance with B .1.
completed
3. That each party shall review, comment, and
approve construction plans, specifications,
and quality assurance
plans as identified in Section B. 9, B. I0, and C. 8 of this
agreement.
4. Upon notification from the Sponsor of the completion of construction, NRCS shall
promptly review the performance of the Sponsor to determine if the requirements of
this agreement have been met.
5. The furnishing of financial and other assistance
by NRCS is contingent on the
availability of funds appropriated by Congress from which payment may be made and
shall not obligate NRCS
upon failure of the Congress to appropriate funds.
6. NRCS may terminate this agreement in whole or in
part when it is detennined by
NRCS that the Sponsors have failed to
comply with any of the conditions of this
agreement. NRCS shall promptly notify the Sponsor in writing of the determination
and reasons for the termination,
together with the effective date. Payments or
recoveries made by NRCS under this termination shall be in accordance with the
legal
rights and liabilities ofNRCS and the Sponsors.
7. This agreement may be
temporarily suspended by NRCS if it determines that
corrective action by the Sponsor is needed to meet the
provisions of this agreement.
Further, NRCS may suspend this
agreement when it is evident that a tennination is
pending.
8. Designated Liaisons may make adjustments to and between individual projects costs
without amendment so long as the total estimated amount described in
A of this
agreement is not exceeded.
9. This Agreement may be executed in
any number of counterparts and all of said
counterparts taken together shall be deemed to constitute one and the same instrument.
Receipt of a facsimile signature ( followed promptly by an original executed
counterpart) shall be deemed receipt of an original.
10.