Fort Walton Beach Council agenda — 01-11-05 - regular — reading text
Part 8 of 15. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-9973-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
remains along some of these
drainages and must be removed.
Discussion:
Shortly after the hurricane, the City received information from the Natural Resources Conservation
Service (NRCS), a division of the Unites States
Department of Agriculture, regarding grant funding
opportunities for local government
agencies for emergency watershed protection measures. These
measures consist of storm debris related
cleanup such as removal and disposal of trees, logs, stumps,
brush, blockages, and rubbish from
waterways and drainages. Mr. Darryl Williams of the local
NRCS office in Crestview met with
City personnel to explain the program and tour the heaviest
damaged drainages within our City. After touring the damaged areas, Mr. Williams agreed that the
areas
surveyed would qualify for Federal funding and arranged for a return visit with an engineer
from theil:District office to
quantify the costs for remediation.
The NRCS provided the
City with cost estimates for debris removal from three area drainages: the
Ferry Road Park area, theSleepy Oaks Road drainage, and the Coral Ditch system. The attached
Project Agreement from the NRCS details these areas and the associated work requited to restore
the areas to their pre- storm condition. As indicated in the
agreement, the total estimated cost for
restoration work is $ 81, 300.
Emergency Watershed Protection Program grants through the NRCS are based on a 75/ 25 funding
formula. Upon execution of the agreement, the NRCS will agree to fund 750/ of the total cost
0
81, 300), while the
City will be responsible for the remaining 250/ for an aggregate total not to
0
exceed $ 108,400. The City' s
required match of $27, 100 willlikely be offset by in-kind contributions
such as
designing the project, developing specifications, administering the contracts, providing
limited labor, and providing
inspection services. In the event that a. cash contribution is required to
make up the City' s 250/ match, Staff will fund this contribution
0
through the City' s disaster reserve
fund.
Prior staffmg this issue for Council action, Staff forwarded all documentation to the City
to
Attorney, Ms. Toni Craig, for legal review and comment. The NRCS Project Agreement requires
documentation from the City' s legal counsel as to land
rights/ ownership for the areas identified in
the agreement. Ms. Craig reviewed the
appropriate documentation with Engineering Division
personnel and provided the assurance certification as
required. A copy of this documentation is
attached with this report.
Recommendation:
Staff requests City Council authorization for the City Manager to accept the Proj ect Agreement
with the Natural Resources Conservation Service (NRCS) for storm debris related within
cleanup
City drainages, enter into the necessary agreement( s) with the NRCS, and implement the work
program as outlined in the proposal.
6- 0~
Date
I/~ / os-
irector Date
Reviewed and Concur:
Joyce Shanahan, City Manager Date
Attachments:
1. United States Department of
Agriculture NRCS Project Agreement
2. City Attorney - Letter of Opinion
2
STATE: Florida
PROJECT: 5043
AGREENIENT NO.: 69- 4209- 5- 1670
UNITED STATES DEPARTMENT OF AGRICULTURE
NATURAL RESOURCES CONSERVATION SERVICE
PROJECT AGREEMENT
LOCALLY LED CONTRACTING
THIS AGREEMENT is hereby entered into by and between the City ofFt.Walton Beach
hereinafter called the Sponsor; and the Natural Resources Conservation Service, United States
Department of Agriculture, hereinafter called NRCS.
WITNESSETH THAT:
WHEREAS, under the provisions of Section 216 of Public Law 81- 516, Emergency
Watershed Protection Program, and Title IV of the Agricultural Credit Act of 1978, Public Law
95- 334, NRCS is authorized to assist the Sponsor in relieving hazards created by natural
disasters that cause a sudden impairment of a watershed, and .
WHEREAS, NRCS and the Sponsor agree to install emergency watershed protection
damages created by Hurricane Ivan. .
measures to relieve hazards and
NOW, THEREFORE, in consideration of the premises and of the several promises to be
faithfully performed by the parties hereto as set forth, the Sponsor and NRCS do hereby agree as
follows:
A. It is agreed that the following- described work is to be constructed at an estimated cost not
to exceed $ 81, 300.
Location Description DSR No.
Ferry Road Park Debris removal to prevent flooding OK- OOII
Sleepy. Oaks Road Debris removal to prevent flooding OK- 0041
Coral Ditch Debris removal to prevent flooding OK-0071
B. THE SPONSOR WILL:
1. Provide for accomplishment of the works of improvement described in Section A and
provide for their completion within 180' days from the time that this agreement is
executed and a notice to proceed is received. The Sponsor will provide NRCS a copy
of any solicitation (Invitation for Bids, Request for Quotations, etc.), bid abstract, and
awarded contract, or other basis of cost and accomplishment.
2. 0 of the actual cost of
Provide cash contribution for any portion of the required 250/
constructing the emergency watershed protection measures described in Section A not
provided by in-kind contribution described in B. 3.
1
3. Provide in-kind contribution ( design the project,
develop specifications and drawings,
let and administer contracts, provide construction materials, labor,
equipment, and
inspect work performed). The Sponsor shall obtain concurrence from NRCS for all in-
kind construction services performed for the works of
improvement. The maximum
value of in-kind contribution will not exceed 25
percent of the actual cost of
constructing the emergency watershed protection measures described in Section A.
Actual cost of construction will consist of contracts awarded to contractors
plus eligible
Sponsor in-kind contributions of labor, materials and equipment. The Sponsor will
provide records to support costs incurred by the Sponsor equal to the amount of the in-
kind contribution reimbursed.
4. Accept all [ mancial and other responsibility for excess costs resulting from their failure
to obtain or their delay in
obtaining adequate land and water rights, permits, and
licenses needed for the work described in Section A.
5. Provide certification ( signed NRCS- ADS- 78) that real
property rights have been
obtained for works of improvement described in Section A
supported by an attorney' s
opinion attached thereto. Certification shall be provided to NRCS prior to solicitation
for installation of the works of
improvement.
6. Take reasonable and necessary actions,
including legal action, if required, to dispose of
any and all contractual and administrative issues arising out of the contract( s) awarded
under this agreement to include but not be limited to,
disputes, claims, protests of
award, source evaluation, and
litigation that may result from the project, and bringing
suit to collect from the contractor any
moneys due in connection with the contract. Any
monies collected will be distributed to the
parties in the same ratio as contributions are
made.
7. Comply with the requirements of the provisions included in Attachment A to this
agreement. If applicable, complete the attached " Clean Air and Water Certification"
included in Attachment A.
8. Hold a pre- design conference with the
Sponsor, Sponsor' s design engineer, and NRCS.
The design conference shall set forth
design parameters concurred by both the Sponsor
and NRCS.
9. Prepare a design, construction specifications, and drawings in accordance with standard
engineering principles, design parameters set forth in the pre- design conference, and
consideration ofNRCS review comments. One set of the final plans,
specifications and
Quality Assurance Plan shall be submitted to NRCS for review and concurrence prior to
commence of work. The final construction
plans and specifications plan shall be signed
and sealed approved by a Professional
Engineer registered in the State of Florida prior
to submittal to NRCS.
10. Prior to commencement of work,
prepare a Quality Assurance Plan ( QAP). The QAP
shall outline technical and