READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2022-16--Amend Comprehensive Fee Schedule — reading text

Part 6 of 14. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-40798-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Development Agreement Amendment 2, 500.00 Res. 2016- 11 09/ 20/ 16 Planned Unit Development Application 1, 650.00 Res 2012- 15 06/ 26/ 12 Pre- Application Conference/ Pre- Construction 75. 00 Res. 2016- 11 09/ 20/ 16 Posted Property Notice, per sign 45. 00 Res 2012- 15 06/ 26/ 12 Mailed Notices 21. 50 Res 2012- 15 06/ 26/ 12 Development Orders( Sec. 13. 20& 13. 21) Application for Expedited Development Order 39. 00 Res 2012- 15 06/ 26/ 12 Application for Major Development Order 725. 00 Res 2012- 15 06/ 26/ 12 Minor Amendment to Development Order 75. 00 Res 2012- 15 06/ 26/ 12 Major Amendment to Development Order 450. 00 Res 2012- 15 06/ 26/ 12 Re-advertisement Fee Direct Cost of the Advertisement Res. 2016- 11 09/ 20/ 16 Site Plan Reviews- new construction commercial or 4 units or more multifamily residential Gross Building Floor Area or Improved Site Area whichever is greater cost per 100 sq ft Res 2012- 15 06/ 26/ 12 Up to 5, 000 sq feet 1. 50 1. 50 Res. 2010- 25 09/ 28/ 10 _ Site Plan Review fee 5, 001 to 10, 000 1. 35 1. 35 Res. 2010- 25 09/ 28/ 10 added to permit fee 10,001 to 25, 000 1. 15 1. 15 Res. 2010- 25 09/ 28/ 10 25, 001 to 50, 000 1. 00 1. 00 Res. 2010- 25 09/ 28/ 10 50, 001 to 100, 000 0.90 0. 90 Res. 2010- 25 09/ 28/ 10 over 100, 000 0. 85 0. 85 Res. 2010- 25 09/ 28/ 10 11 U:\ Finance\ Finance\ Fee Schedule\ 2022, September122. 9. 27 Comprehensive Fee Schedule FY 2022-23 Department and/ or Enacting Resolution./ Fee Description Current Rate Service Ordinance BUILDING PERMIT FEES( Sec. 3. 02. 05)* A surcharge will be collected in accordance with and for the purposes stated in F. S. 468.631 and F. S. 553. 721. Res. 2010- 25 09/ 28/ 10 General Fees Building permit processing fee 22. 50 Res. 2010- 25 09/ 28/ 10 25. 75 per submittal SFD 51. 50 Revisions to approved permit, per submittal per submittal MF 77. 25 per Res 2008- 15 04/ 08/ 08 submittal Corn Penalty for commencement prior to permitting 300% of permit fee or$ 250, whichever is greater Res 07- 15 09/ 05/ 07 Sec. 3. 01. 05) Change of contractor, transfer of permit Prorate balance of work Res 2003- 01 1/ 28/ 03 Sec. 3. 01. 12) Expired permit( Sec. 3. 01. 08) Re- issuance requires fee to be paid Res 07- 15 09/ 05/ 07 Conditional; no work has commenced and permit has Refund of permit fee( Sec. 3. 01. 10) Res 07- 15 09/ 05/ 07 not expired; requires written notice to the BO Construction Permit Fees No permit required for cosmetic work only, such as carpet, tile, painting, landscaping, etc. Exceptions Res 07- 15 09/ 05/ 07 500 or less include any structural change or any work that requires an inspection per the FBC. 39.00 for the first thousand, plus$ 6. 60 for each 501 to$ 50, 000 Res. 2010- 25 09/ 28/ 10 Permit based on value thousand or fraction thereof, to and including$ 50, 000 of work, includes labor, 360. 55 for first$ 50, 000 plus$ 5. 25 for each materials, site work, 50, 001 to 5100, 000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10 and design fees $ including$ 100, 000 623. 00 for the first$ 100, 000 plus$ 4. 00 for each 100, 001 to$ 500, 000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10 including$ 500,000 2, 219.00 for the first$ 500,000 plus$ 2. 75 for each 500, 001 and up Res. 2010- 25 09/ 28/ 10 additional thousand or fraction thereof Plan check fee 50% of building fee( Sec. 3. 02. 06) Res 2009- 35 09/ 09/ 09 Threshold building transmittal/ processing fee/ ICC 206. 00 Res 2008- 15 04/ 08/ 08 Moving Fee 113. 50 Res 2008- 15 04/ 08/ 08 Demolition Fee 59. 50 plus$ 9.45 per 2, 000 sq ft above 20, 000 sq ft Res. 2010- 25 09/ 28/ 10 or fraction thereof Additional Inspection Fee 38. 00 Res. 2010- 25 09/ 28/ 10 Additional Inspection Fee- after hours 50. 00 per hour( 2 hour minimum) Res 2014- 2 02/ 11/ 14 Re- Inspection Fee( the building inspector returns to First-$ 38. 00 the job site to review corrected work denied on the Second-$ 38. 00 Res. 2010- 25 09/ 28/ 10 previous inspection for the same violation) Third and more-$ 115. 50 Certificate of Occupancy 38. 00 Res. 2010- 25 09/ 28/ 10 Certificate of Completion 38.00 Res. 2010- 25 09/ 28/ 10 Temporary Certificate of Occupancy 270.50 Res. 2010- 25 09/ 28/ 10 Mechanical Permits and Inspection Permit Fee Base 39. 00 Res. 2010- 25 09/ 28/ 10 15. 00 for the first$ 1, 000 or fraction thereof of the Inspection of heating, ventilation, ductwork, air $ valuation of installation plus$ 2. 75 for each additional Res. 2010- 25 09/ 28/ 10 conditioning and refrigeration systems 1, 000 or fraction thereof Inspecting repairs, alterations, and additions on 5. 80 plus$ 3. 45 for each additional$ 1, 000 or Res. 2010- 25 09/ 28/ 10 existing systems fraction thereof 12 U:\ Finance\ Finance\ Fee Schedule12022, September122. 9.27 Comprehensive Fee Schedule FY 2022-23 Department and/ or Enacting Resolution 1 Fee Description

Download this text file with its original spacing ↓