READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — May 17, 2013 — reading text

Part 39 of 65. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 01-Agenda Packet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Authority: 1 49 USC 5325 (a) 2 49 CFR 633.17 3 18 CFR 18.36 (i) FEDERAL CHANGES 49 CFR Part 18 Applicability to Contracts The Federal Changes requirement applies to all contracts. Flow Down The Federal Changes requirement flows down appropriately to each applicable changed requirement. Model Clause/Language No specific language is mandated. The following language has been developed by FTA. Federal Changes - Contractor shall at all times comply with all applicable FTA regulations, policies, procedures and directives, including without limitation those listed directly or by reference in the Master Agreement between Purchaser and FTA, as they may be amended or promulgated from time to time during the term of this contract. Contractor's failure to so comply shall constitute a material breach of this contract. BONDING REQUIREMENTS Applicability to Contracts For those construction or facility improvement contracts or subcontracts exceeding $100,000, FTA may accept the bonding policy and requirements of the recipient, provided that they meet the minimum requirements for construction contracts as follows: a. A bid guarantee from each bidder equivalent to five (5) percent of the bid price. The "bid guarantees" shall consist of a firm commitment such as a bid bond, certifies check, or other negotiable instrument accompanying a bid as assurance that the bidder will, upon acceptance of his bid, execute such contractual documents as may be required within the time specified. b. A performance bond on the part to the Contractor for 100 percent of the contract price. A "performance bond" is one executed in connection with a contract to secure fulfillment of all the contractor's obligations under such contract. c. A payment bond on the part of the contractor for 100 percent of the contract price. A "payment bond" is one executed in connection with a contract to assure payment, as required by law, of all persons supplying labor and 55 Packet Pg. 232 5.13.b FTA PROVISIONS, CERTIFICATIONS, REPORTS, FORMS AND OTHERS Attachment: Procurement Manual PROPOSED Transit Language 4-22-13 [Revision 1] (1655 : FTA Requirements Appendix added to Purchasing material in the execution of the work provided for in the contract. Payment bond amounts required from Contractors are as follows: (1) 50% of the contract price if the contract price is not more than $1 million; (2) 40% of the contract price if the contract price is more than $1 million but not more than $5 million; or (3) $2.5 million if the contract price is more than $5 million. d. A cash deposit, certified check or other negotiable instrument may be accepted by a grantee in lieu of performance and payment bonds, provided the grantee has established a procedure to assure that the interest of FTA is adequately protected. An irrevocable letter of credit would also satisfy the requirement for a bond. Flow Down Bonding requirements flow down to the first tier contractors. Model Clauses/Language FTA does not prescribe specific wording to be included in third party contracts. FTA has prepared sample clauses as follows: Bid Bond Requirements (Construction) (a) Bid Security A Bid Bond must be issued by a fully qualified surety company acceptable to (Recipient) and listed as a company currently authorized under 31 CFR, Part 223 as possessing a Certificate of Authority as described thereunder. (b) Rights Reserved In submitting this Bid, it is understood and agreed by bidder that the right is reserved by (Recipient) to reject any and all bids, or part of any bid, and it is agreed that the Bid may not be withdrawn for a period of [ninety (90)] days subsequent to the opening of bids, without the written consent of (Recipient). It is also understood and agreed that if the undersigned bidder should withdraw any part or all of his bid within [ninety (90)] days after the bid opening without the written consent of (Recipient), shall refuse or be unable to enter into this Contract, as provided above, or refuse or be unable to furnish adequate and acceptable Performance Bonds and Labor and Material Payments Bonds, as provided above, or refuse or be unable to furnish adequate and acceptable insurance, as provided above, he shall forfeit his bid security to the extent of (Recipient's) damages occasioned by such withdrawal, or refusal, or inability to enter into an agreement, or provide adequate security therefor. It is further understood and agreed that to the extent the defaulting bidder's Bid Bond, Certified Check, Cashier's Check, Treasurer's Check, and/or Official Bank Check (excluding any income generated thereby which has been retained by (Recipient) as provided in [Item x "Bid Security" of the Instructions to Bidders]) shall prove inadequate to fully recompense (Recipient) for the damages occasioned by default, then the undersigned bidder agrees to indemnify (Recipient) and pay over to (Recipient) the difference between the bid security and (Recipient's) total damages, so as to make (Recipient) whole. The undersigned understands that any material alteration of any of the above or any of the material contained on this form, other than that requested, will render the bid unresponsive. Performance and Payment Bonding Requirements (Construction) The Contractor shall be required to obtain performance and payment bonds as follows: (a) Performance bonds 56 Packet Pg. 233 5.13.b FTA PROVISIONS, CERTIFICATIONS, REPORTS, FORMS AND OTHERS Attachment: Procurement Manual PROPOSED Transit Language 4-22-13 [Revision 1] (1655 : FTA Requirements Appendix added to Purchasing 1. The penal amount of performance bonds shall be 100 percent of the original contract price, unless the (Recipient) determines that a lesser amount would be adequate for the protection of the (Recipient). 2. The (Recipient) may require additional performance bond protection when a contract price is increased. The increase in protection shall generally equal 100 percent of the increase in contract price. The (Recipient) may secure additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond. (b) Payment bonds 1. The penal amount of the payment bonds shall equal: (i) Fifty percent of the contract price if the contract price is not more than $1 million. (ii) Forty percent of the contract price if the contract price is more than $1 million but not more than $5 million; or (iii) Two and one half million if the contract price is more than $5 million. 2. If the original contract price is $5 million or less, the (Recipient) may require additional protection as required by subparagraph 1 if the contract price is increased. Performance and Payment Bonding Requirements (Non-Construction) The Contractor may be required to obtain performance and payment bonds when necessary to protect the (Recipient's) interest. (a) The following situations may warrant a performance bond: 1. (Recipient) property or funds are to be provided to the contractor for use in performing the contract or as partial compensation (as in retention of salvaged material). 2. A contractor sells assets to or merges with another concern, and the (Recipient), after recognizing the latter concern as the successor in interest, desires assurance that it is financially capable. 3. Substantial progress payments are made before delivery of end items starts. 4. Contracts are for dismantling, demolition, or removal of improvements. (b) When it is determined that a performance bond is required, the Contractor shall be required to obtain performance bonds as follows: 1. The penal amount of performance bonds shall be 100 percent of the original contract price, unless the (Recipient) determines that a lesser amount would be adequate for the protection of the (Recipient). 2. The (Recipient) may require additional performance bond protection when a contract price is increased. The increase in protection shall generally equal 100 percent of the increase in contract price. The (Recipient) may secure additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond. (c) A payment bond is required only when a performance bond is required, and if the use of payment bond is in the (Recipient's) interest. 57 Packet Pg. 234 5.13.b FTA PROVISIONS, CERTIFICATIONS, REPORTS, FORMS AND OTHERS Attachment: Procurement Manual PROPOSED Transit Language 4-22-13 [Revision 1] (1655 : FTA Requirements Appendix added to Purchasing (d) When it is determined that a payment bond is required, the Contractor shall be required to obtain payment bonds as follows: 1. The penal amount of payment bonds shall equal: (i) Fifty percent of the contract price if the contract price is not more than $1 million; (ii) Forty percent of the contract price if the contract price is more than $1 million but not more than $5 million; or (iii) Two and one half million if the contract price is increased. Advance Payment Bonding Requirements The Contractor may be required to obtain an advance payment bond if the contract contains an advance payment provision and a performance bond is not furnished. The (recipient) shall determine the amount of the advance payment bond necessary to protect the (Recipient). Patent Infringement Bonding Requirements (Patent Indemnity) The Contractor may be required to obtain a patent indemnity bond if a performance bond is not furnished and the financial responsibility of the Contractor is unknown or doubtful. The (recipient) shall determine the amount of the patent indemnity to protect the (Recipient). Warranty of the Work and Maintenance Bonds 1. The Contractor warrants to (Recipient), the Architect and/or Engineer that all materials and equipment furnished under this Contract will be of highest quality and new unless otherwise specified by (Recipient), free from faults and defects and in conformance with the Contract Documents. All work not so conforming to these standards shall be considered defective. If required by the [Project Manager], the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. 2. The Work furnished must be of first quality and the workmanship must be the best obtainable in the various trades. The Work must be of safe, substantial and durable construction in all respects. The Contractor hereby

Download this text file with its original spacing ↓