READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — July 1, 2014 — Agenda — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 103-Agenda 2.5.2013 Slides.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Water and Wastewater System
Utility Privatization Proposal
Eglin Air Force Base
Florida
Eglin AFB Utility Privatization
Project Overview
• Solicitation for Proposals from Utilities and
Private Companies
• Water and Wastewater Systems Privatization
• 50 year Contract Term and Bill of Sale
• Defense Logistics Agency (DLA) is Managing
the Procurement of Services
• Utility Privatization Project DOES NOT include
the Wastewater Treatment Facilities.
• Wastewater Treatment is Separate Contract
Eglin AFB Locations
• Eglin AFB UP includes the following locations:
• Main Base • Santa Rosa Island
• Duke Field • Mid-Bay Shores
• Camp Rudder Maxwell/Gunter
• 7th Special Forces Group Recreation Area (White
Point
• Navy EOD
• Numerous Test Sites
• Cape Sand Blas and Ranges
• Poquito Bay Housing • Camp Pinchot
Area
Eglin AFB Reservation Map
Water System Overview
Water assets include water distribution, storage,
water supply, and treatment:
• 652,305 Lineal feet
of various size/type
of pipe
• 747 Fire hydrants
• 1249 Valves, various
size/types
• 82 Water wells,
pumps, etc.
Water System Overview
Water assets include water distribution, storage,
water supply, and treatment:
• 992 Backflow
preventers, various
size/types
• 17 Elevated Tanks
and other ground
storage tanks
• Associated chemical
systems and other
ancillary equipment
Wastewater System Overview
Wastewater assets include gravity collection
system, force mains, and pump stations :
• 398,358 Lineal feet
of various size/type
of gravity collection
piping
• 1058 manholes,
various sizes/types
• 83 Wastewater
pumping stations
Wastewater System Overview
Wastewater assets include gravity collection
system, force mains, and pump stations :
• 62,222 Lineal feet of
various size/type of
force main piping
• Associated buildings,
systems, and other
ancillary equipment
Utility Privatization Procurement
1. Submit Proposals
1. Water
2. Wastewater
3. Combined
2. Proposals Due February 19
3. DLA Proposal Review
(6-12 mos)
4. If Selected, Negotiations & DLA
Audit of County and Subs
5. Transition Period (6-9 mos)
6. Final Negotiation and 50-yr
Contract Execution
7. Bill of Sale-Transfer of Ownership
Water and Wastewater System
Utility Privatization Proposal
Eglin Air Force Base
Florida
