to keep the rope
elevation and length uniform. The rope shall be stapled or nailed to inhibit tampering or
disconnection. Where the sand fence terminates at an existing pathway or beach
access, the Contractor shall install a post and rope system from the seaward toe of the
dune to the landward toe of the dune. The Contractor shall install the posts and rope in
accordance with the Drawings. The posts for the post and rope pathways shall be
minimum 3-inch diameter wood posts, no less than 7 feet in length, comprised of
treated southern yellow pine, spruce or other wood of equal life and strength as may be
approved by the Engineer. The Contractor shall maintain a minimum access width of 6
feet at all major pathways unless otherwise shown in the Drawings or directed by the
Engineer. The Engineer reserves the right to modify or field-determine the number and
location of beach accesses over the dune. The Engineer will attempt to address the
preferences of property owners with respect to access location and size through field
adjustments.
Last Revised – 01/09/2013 Page 65
4.3 WARRANTY
A. The Contractor shall warrant the installed sand fence, posts and rope against
deterioration and decay for twelve months following final acceptance. The Contractor
will not be responsible for warranting materials damaged during extreme storm events.
PART 5 - SIGNAGE
5.1 SIGNAGE
A. Materials
The signage shall be constructed of 80-gage aluminum or better, shall have minimum
dimensions of 12 inches x 12 inches, and shall have white reflective coating and black
lettering capable of withstanding the harsh beach environment. The signs shall read
“Please Keep Off – Dune Restoration in Progress” and “Dune Vegetation Protected –
Florida Statute Ch. 161” in accordance with the Drawings. The Contractor may propose
alternative signage materials for approval by the Engineer. The Contractor must submit
proper documentation for proposed materials and outline the advantages of such
materials. Signage posts shall be minimum 3-inch diameter wood posts, no less than 8
feet in length, comprised of treated southern yellow pine, spruce, or other wood of
equal life and strength as may be approved by the Engineer. The Contractor’s Work
Plan shall include the proposed sign and post details (material type, size, text, etc.).
B. Installation
The Contractor shall install signage designating the newly vegetated dune areas in
accordance with the Drawings. The Contractor shall install signage posts with a
minimum 3-foot embedment into the existing grade. Embedment shall not exceed four
feet and shall be uniform across the project area. Signage shall be installed at the
seaward dune toe immediately landward of the sand fencing and atop the dune crest
immediately adjacent to existing dune walkovers and foot pathways as depicted in the
Drawings. Signage installed near the seaward dune toe shall be attached to the
seaward face of the timber post and face the offshore direction (south) to be viewed
from the beach looking landward. Signage installed near the dune crest adjacent to
walkways and foot paths shall be place on both the seaward and landward side of the
timber post and face both the offshore (south) and landward (north) directions. Signage
shall be attached to the timber posts with stainless steel bolts and nuts or tamper-proof
stainless steel screws and plastic washers. The signs shall be placed at the general
spacing depicted in the Drawings and in close proximity to and in full view of the
footpaths and dune walkovers.
C. Warranty
The Contractor shall warrant the installed signage against deterioration and decay for
twelve months following final acceptance. The Contractor will not be responsible for
warranting materials damaged during extreme storm events.
Last Revised – 01/09/2013 Page 66
PART 6 - REPORTING
The Contractor shall prepare a daily progress report for submittal by fax or electronic
mail to the Owner and Engineer. At least five (5) days prior to commencement of the
work, the Contractor shall submit a sample progress report to the Engineer for review
and approval. The daily progress report shall include, at a minimum:
1. Project name
2. Contractor’s name and contact information
3. Date of report
4. Weather conditions
5. Work performed (alongshore limits of work referencing baseline stationing)
6. Quantity of materials installed, staged, etc.
7. Problems/delays/issues
8. Instructions given/received
9. Deviations from the Drawings and/or Specifications
10. Certification statement by the Contractor with the Contractor’s signature
verifying the reported information
PART 7 - ENVIRONMENTAL PROTECTION
7.1 GENERAL
The Contractor shall conduct all work related activities in a manner so as to minimize or
avoid disturbance to the existing beach and dune environment. The Contractor shall
comply with all Federal, State, and local environmental and endangered species
protection requirements and regulations related to the protection of nesting marine
turtles, beach mice, and shorebirds. The Contractor and subcontractors are responsible
for becoming intimately familiar with applicable requirements and regulations and their
potential impact on the proposed work. Federal, State, and local environmental and
endangered species protection requirements and regulations are considered a part of
the contract and shall be complied with by the Contractor and subcontractors. The
Contractor is responsible for informing its personnel and all subcontractor(s) of all
applicable requirements and the measures needed to maintain compliance with these
requirements.
7.2 FUELING OPERATIONS
The Contractor will not be permitted to dispense fuel on the dune or sandy beach
areas. The Contractor shall take all responsible precautions to prevent fuel spills or
contamination of the ground with fuel. Should any fuel spills occur, the Contractor shall
immediately notify the Owner, Engineer, and any other required parties and
Last Revised – 01/09/2013 Page 67
immediately recover the contaminated ground and dispose of it offsite at an approved
facility.
7.3 DAILY TURTLE NEST SURVEYS
Beginning May 1, Okaloosa County shall conduct daily marine turtle nest surveys of the
beach within the work area prior to 9:00 am (local time). The Contractor will be required
to coordinate with the designated turtle monitoring personnel prior to commencing any
vehicular activity on the beach to determine the location of any nests detected. The
turtle monitor shall clearly mark, with stakes and flagging indicating a 3-foot (minimum)
buffer radius, any nest discovered. The Contractor shall document and verify all daily
communication with the turtle monitor in the daily report. If the Contractor finds an
unmarked nest, the Contractor shall prohibit any work within 10 feet of the nest and
notify the Owner, Engineer, and turtle monitor immediately. Nests that interfere with the
Contractor’s uncompleted work shall be left in place and the Contractor shall be
relieved of installing any materials within 10 feet of the nest site.
7.4 IRRIGATION / FERTILIZER
The Contractor is not permitted to irrigate or fertilize within 10 feet or upslope of any
marked nest.
7.5 LIGHTING
Lighting of the beach and/or work area is prohibited.
7.6 BEACH DRIVING
The Contractor is specifically advised that vehicle driving or parking on the beach is
prohibited, excepting lightweight all-terrain vehicles with ground pressure of 10 psi or
less. The Contractor shall obtain beach driving permits from the Owner for each vehicle
used on the beach. Permits shall remain with each vehicle and be displayed in the
driver’s side windshield. Vehicle access shall only be through access points designated
on the Drawings. The Contractor is advised the proposed work area is soft sand, and
only appropriate vehicles shall be utilized in support of the work.
The Contractor will be responsible for filling or leveling any alteration of the beach
topography (e.g., tire ruts, vehicle tracks, etc.) resulting from vehicular activity. The
Contractor will not be permitted to store any equipment or materials on the beach. The
Contractor shall store all equipment and materials not installed/used during the
workday in the staging areas shown on the Drawings.
Last Revised – 01/09/2013 Page 68
PART 8 - MEASUREMENT AND PAYMENT
8.1 PAYMENT
Payment shall be in accordance with the unit prices specified for the work and shall be
based on the total number of installed and accepted units as described below and
within these Specifications and the Contract Documents. The Contractor may submit
partial payment requests upon completing the approximate 1,500 to 2,000-feet
acceptance sections shown in the Drawings.
1. Dune Vegetation: Payment for the number of planting units installed and
accepted.
2. Sand Fencing: Payment for the lineal feet of sand fencing installed and
accepted. Sand fencing units will also include the rope placed along the
seaward boundary of the fence.
3. Signage: Payment for the number of signs and sign post installed and
accepted.
4. Post and Rope Access Enhancements: Payment for the lineal feet of post
and rope installed and accepted.
5. Additional payment for items in excess of that indicated on the Drawings
and requested by the Owner will be calculated at unit prices stated in the
Contract.
6. Unit prices are to include labor, materials, tools, equipment, and incidentals
for the installation of all work components as listed herein and on the
Drawings.
7. No payment will be made for rejected items, items that do not comply with
applicable sections of these Specifications, and those items that are
defective or damaged during handling or placement.
8. No payment will be made for re-planting or other activities required to
conform to the warranty and success criteria provisions stipulated within
these Specifications.
PART 9 - PUBLIC SAFETY AND CONFLICTS
9.1 PUBLIC SAFETY
The