PUBLIC SAFETY & CONFLICTS
9.1 PUBLIC SAFETY
A. Public Safety – The contractor shall at all times protect the safety of the
general public utilizing the beach and access areas, as well as recreating
along the shoreline, within the adjacent to the proposed installation areas.
The contractor shall notify the Owner and Engineer immediately of any
concerns or issues relating to potential conflicts between work activities
and residents or the general public.
9.2 CONFLICTS
A. Conflicts – The contractor is advised that construction work by other
contractors may be occurring at the same time as plant installation. The
contractor shall direct all concerns or issues relating to potential work
conflicts to the Owner and Engineer.
Last Revised – 01/09/2013 Page 54
ATTACHMENT “B”
OKALOOSA ISLAND DUNE FLORA RESTORATION
& BEACH ACCESS MANAGEMENT PROJECT
CONSTRUCTION DRAWINGS AND SPECIFICATIONS
TECHNICAL SPECIFICATIONS FOR THE
OKALOOSA ISLAND DUNE FLORA RESTORATION
AND BEACH ACCESS ENHANCEMENT PROJECT
PART 1 - GENERAL
1.1 SUMMARY
A. These specifications include requirements for the furnishing of labor, materials,
equipment and performing all operations in connection with dune vegetation, sand
fencing, signage, and post and rope installation as indicated on the Construction
Drawings (Drawings) and specified herein.
B. The Contractor is informed that Okaloosa County has made a request to the Florida
Department of Environmental Protection (FDEP) for a Coastal Construction Control Line
(CCCL) Permit exemption as the project does not cause an adverse impact to the
coastal system. The Contractor shall be aware that the FDEP may require additional
permitting requirements beyond those stated in these specifications. The Contractor
shall familiarize themselves with FDEP permitting requirements for dune restoration and
beach access management projects as they relate to the proposed work.
1.2 DEFINITIONS
A. Nomenclature: The scientific and common names of plants herein specified conform to
the approved names given in Hortus Third (1976) by Liberty Hyde Bailey Hortorium.
B. Planting Unit: For the purposes of this project, the term “planting unit” refers to
vegetative material of an individual, viable, nursery-grown plant installed within a single
hole created on the beach or dune system. Planting unit species and size vary in
accordance with these Specifications and Contract Documents.
C. Engineer: The Owner’s representative responsible for construction observation and
project certification.
1.3 SUBMITTALS
The following shall be submitted for Owner and Engineer approval:
A. Work Plan: As part of the bid package, the Contractor shall submit to the Engineer a
detailed work plan for the dune vegetation, sand fence, signage, and post and rope
installation. The plan shall include the construction schedule (including plant
propagation through installation), propagation method, types of hydrating gel and
Last Revised – 01/09/2013 Page 55
fertilizer to be used (including the required manufacturers information), proposed
materials, staging areas and access requirements, work force and equipment, and the
qualifications of supervisor(s). The Contractor shall provide with the work plan
documentation as to the source of the planting units to be installed, including collection
permits and any other required permits or documentation.
B. Watering Plan: As part of the bid package, the Contractor shall furnish to the Engineer a
plan for watering the plants and an itemized list of equipment that will be used during
watering operations. The watering plan shall detail the proposed number of irrigation
events, irrigation methodology, equipment, water source, labor, required time,
notifications, and the physical condition(s) of the planting units that signal the need for
maintenance irrigation. The plan shall also include details regarding the hydrating gel
requirements and any additional soil amendments (fertilizer) that may be included
during the irrigation.
C. Certificates of Compliance: Before delivery of planting materials, the Contractor shall
submit to the Engineer certificates of compliance and/or documentation certifying that
the planting materials meet all of the requirements (plant source, plant size, plant age,
plant grade, etc.) for this specification.
D. Notice of Commencement: The Contractor shall notify the Engineer at least 3 days
before initiating the work, including mobilization, staging, and/or field work.
E. Notice for Inspection: The Contractor shall notify the Engineer at least 10 days before
the scheduled 180-day inspection that the vegetation is ready for inspection. The
Contractor shall meet and accompany the Engineer onsite during the inspection.
F. Soil Amendments: The Contractor shall submit the required manufacturer’s information
certifying that soil amendments meet the specifications.
PART 2 - EXECUTION
2.1 GENERAL
A. Schedule
The Contractor shall complete all construction activity (plant, sand fence, signage, and
post and rope installation) and remove all equipment from the beach and work areas
prior to marine turtle nesting season (May 1 – October 31). The Contractor shall not
commence work until receiving a written Notice to Proceed from the Owner or
Engineer. Work is permitted seven (7) days a week during daylight hours only (sunrise to
1 hour after sunset).
B. Notification
The Contractor shall notify the Engineer at least 3 days prior to project mobilization,
commencement of installation, project completion, inspections, and demobilization.
The Contractor shall notify the Engineer at least 10 days before the scheduled 180-day
vegetation inspection. The Contractor shall notify the Engineer at least 48 hours prior to
the suspension of work. The Contractor shall notify the Engineer immediately for any
Last Revised – 01/09/2013 Page 56
work stoppages resulting from environmental impacts (turtle nest impacts, fuel spills,
etc.), permit violations, property owner disputes, safety violations, etc.
C. Work
The Contractor shall install the dune vegetation, sand fencing, signage, and post and
rope in accordance with the Drawings. The Contractor shall field-verify the specific
locations of the work and obtain Engineer approval prior to installation of any work
components. The Owner and Engineer reserve the right to suspend the work at any time
when the location, layout, or limits established by the Contractor are not sufficient to
define the work. The Contractor shall utilize the construction baseline and stationing
shown in the Drawings to define features of the work and document completed work
areas.
D. Planting Layout
The Contractor shall lay out the locations of the proposed vegetation areas, for
approval by the Engineer, prior to planting. At a minimum, the layout shall include
markers (e.g., flagging or stakes) at the seaward and landward limits of the planting
area, accesses (paths and dune walkovers), and endpoints of the work. The markers
shall be placed at 100-foot centers maximum and at reduced distances in non-uniform
areas to clearly define the planting area. The Contractor will be responsible for tracking
and removing all stakes and markers from the beach project area. The work shall be
performed in a continuous manner from start to finish without interruption or variation.
2.2 WORK AREAS AND ACCESS
A. Planting Areas
The plant units shall be installed on the existing dune within the planting areas shown in
the Drawings. The Zone I planting area primarily represents the seaward dune face and
dune crest. The Zone II planting area primarily represents the landward dune face.
B. Staging Areas
The Contractor shall utilize the staging areas shown in the Drawings. The Contractor shall
maintain the staging areas in a neat and orderly fashion and minimize the area utilized
for staging and/or equipment storage. The Contractor will be responsible for cleaning
and restoring the staging areas to pre-construction conditions to the satisfaction of the
Owner and Engineer prior to demobilization. The Contractor shall be responsible for any
damage to the existing dunes, dune vegetation, private and public property, and
staging, work, and access areas. The Contractor shall repair any damage resulting from
the Contractor’s operations at no cost to the Owner or Engineer. The Contractor will not
be permitted to stockpile equipment or materials on the beach except those required
for immediate (same day) planting or installation. The Contractor is responsible for the
collection and removal of any debris and litter associated with the work. The Work Plan
submitted by the Contractor shall describe the proposed use (including
equipment/materials to be stored, schedule, etc.) of the staging areas.
Last Revised – 01/09/2013 Page 57
C. Beach Access
The Contractor shall utilize only the beach access corridors shown in the Drawings unless
otherwise approved by the Owner and Engineer. The Contractor shall maintain all
beach accesses in working order and shall not inhibit the general public from accessing
the beach. The Contractor shall not enter or place planting units, sand fence,
equipment or materials on private properties outside of the project area defined in the
Drawings. The Contractor shall minimize access and travel along the beach to avoid
disturbance or impacts to the existing beach and dune system. Driving vehicles along
any part of the dune or upland of the dune is prohibited. The Contractor shall repair any
damage resulting from the Contractor’s operations at no cost to the Owner or Engineer.
D. Work Area
The Contractor’s active work area shall not exceed 500 linear feet in a shore-parallel
direction.
PART 3 - PRODUCTS
3.1 PLANTING MATERIALS
A. Plant Source
The source of all planting units delivered under this bid item will be limited to seeds and
propagated plants collected from the South Alabama and Florida Panhandle coasts.
Source material collected