the project area, a bulletin board will be
placed and maintained in the construction area with the location map of the construction
site showing the bird nesting areas and a warning, clearly visible, stating that “BIRD
NESTING AREAS ARE PROTECTED BY THE FLORIDA THREATENED AND
ENDANGERED SPECIES ACT AND THE STATE AND FEDERAL MIGRATORY
BIRD ACTS”.
29. Beach Contours. All tilling and scarp removal should be done outside the shorebird
nesting season. It is the responsibility of the contractors to avoid tilling or scarp removal
in areas where nesting birds are present.
a. A relatively even surface, with no deep ruts or furrows, shall be created during
tilling. To do this, chain-linked fencing or other material shall be dragged over
those areas as necessary after tilling.
b. The slope between the mean high water line and the mean low water line must be
maintained in such a manner as to approximate natural slopes.
MONITORING REQUIRED:
30. Water Quality - Turbidity shall be monitored as follows:
Units: Nephelometric Turbidity Units (NTUs).
Dredging areas
Frequency: For hopper dredge: During each hopper dredge cycle that occurs during
day-light hours, after the plume reaches the monitoring sites, at least 5
discrete sampling events.
Joint Coastal Permit
Western Destin Beach Restoration
Permit No. 0286575-001-JC
Page 20 of 26
Location: If in or immediately up-current of OFW:
Background: Five samples measured at least 5 meters apart (pooled to
determine the mean background level for the sampling event), at mid-
depth, at least 150 meters up-current from the point of excavation, clearly
outside of any turbidity plume.
Compliance Monitoring Sites: At the point where the densest portion of
the turbidity plume intersects the periphery of the mixing zone (1,500
meters down-current from the dredge), at mid-depth.
Intermediate Monitoring Sites: Additional samples will be collected
within the mixing zone, in the densest portion of the turbidity plume, at
distances of 150 meters, 500 meters and 1,000 meters from the dredge, at
mid-depth. These measurements will be used to calibrate the size of the
mixing zone for future events.
If NOT in OFW:
Background: Five samples measured at least 5 meters apart (pooled to
determine the mean background level for the sampling event), at mid-
depth, at least 150 meters up-current from the point of excavation, clearly
outside of any turbidity plume.
Compliance Monitoring Sites: At the point where the densest portion of
the turbidity plume intersects the periphery of the mixing zone, 150 meters
down-current from the dredge, at mid-depth.
Disposal areas
Frequency: During daylight hours, at least once during each hopper discharge cycle,
when the maximum plume reaches the monitoring sites.
Location: Background: Approximately 500 meters upcurrent of the point where
the return water from the dredged discharge reenters the Gulf of Mexico
and the same distance offshore as the associated compliance sample.
Compliance Monitoring Sites: Samples shall be collected where the
densest portion of the turbidity plume crosses the edge of the mixing zone,
which measures 150 meters from the point where the return water from the
dredged discharge reenters the Gulf of Mexico.
Joint Coastal Permit
Western Destin Beach Restoration
Permit No. 0286575-001-JC
Page 21 of 26
Turbidity Standards:
Within the Gulf Islands National Seashore, which is designated as Outstanding
Florida Waters (OFW), the turbidity level at the compliance site shall not exceed
0 NTUs above the background turbidity level for that sampling event.
The turbidity level at compliance sites located outside of the OFW shall not
exceed 29 NTUs above the background turbidity level for that sampling event.
Any project-associated discharge other than dredging, disposing, or nourishing the beach
(e.g., scow leakage or runoff from temporary containment area) should be monitored as
close to the source as possible every hour until background turbidity levels return or until
otherwise directed by the Department. The Permittee shall notify the Department by
separate email or telephone to the Permit Processor, or the JCP Compliance Officer, of
such an event within 24 hours of the time the Permittee first becomes aware of the
discharge.
31. The compliance locations given above shall be considered the limits of the temporary
mixing zone for turbidity allowed during construction. If monitoring reveals turbidity
levels at the compliance sites that are greater than 0 NTUs within Outstanding Florida
Waters, or 29 NTUs outside of Outstanding Florida Waters, above the corresponding
background turbidity levels, or any other project-associated discharge results in a
turbidity violation, construction activities shall cease immediately and not resume until
corrective measures have been taken and turbidity has returned to acceptable levels. Any
such occurrence shall also be immediately reported to the Department’s Bureau of
Beaches and Coastal Systems (BBCS) in Tallahassee at (850) 414-7716 (attn: JCP
Compliance Officer) and the Department’s Northwest District office in Pensacola.
32. Turbidity monitoring reports shall be submitted to the Department (JCP Compliance
Officer) on a weekly basis within seven (7) days of collection. Reports shall be
submitted under a cover letter containing the following statement: "This information is
provided in partial fulfillment of the monitoring requirements in Permit No.
0286575-001-JC Western Destin Beach Restoration." The cover letter shall
summarize any significant compliance issues, summarize any corrective measures taken
as result of a turbidity violation and provide the dates or monitoring period of the reports.
Also, please clearly reference the permit number and project name on each page of the
reports. In addition to analytical results for samples and quality control, each report
should also include:
a. Specific monitoring requirements for the sampling location;
b. Time and date samples were taken;
c. Sampling results, the net difference between compliance and background results,
and whether the turbidity level is in compliance (any violations of the turbidity
Joint Coastal Permit
Western Destin Beach Restoration
Permit No. 0286575-001-JC
Page 22 of 26
standard shall be highlighted).
d. Depth of water body and depth of samples;
e. Water temperature;
f. Antecedent weather conditions, including wind direction and velocity;
g. Tidal stage and direction of flow;
h. A statement describing the methods used in collection, handling and analysis of
the samples;
i. Turbidity meter calibration/verification documentation;
j. A map indicating the location of the current construction activity, the sampling
locations (background and compliance), the visible plume pattern of the
applicable mixing zone, and location of nearby Outstanding Florida Waters, if
applicable; and
k. A statement by the individual responsible for implementation of the sampling
program concerning the authenticity, precision, limits of detection and accuracy
of the data.
PHYSICAL MONITORING REQUIRED:
33. Pursuant to Rule 62B-41.005(16), F.A.C., physical monitoring of the project is required
through acquisition of project-specific data to include, at a minimum, topographic and
bathymetric surveys of the beach, offshore, and borrow site areas, and engineering
analysis. The monitoring data are necessary in order for both the project sponsor and the
Department to regularly observe and assess, with quantitative measurements, the
performance of the project, any adverse effects which have occurred, and the need for
any adjustments, modifications, or mitigative response to the project. The scientific
monitoring process also provides the project sponsor and the Department information
necessary to plan, design, and optimize subsequent follow-up projects, potentially
reducing the need for and costs of unnecessary work, as well as potentially reducing any
environmental impacts that may have occurred or be expected.
The attached Physical Monitoring Plan, received by the Department on October 6, 2009,
is hereby approved and incorporated by reference as a specific condition of this permit.
The Plan can be revised at any later time by written request of the Permittee and with the
written approval of the Department. If subsequent to approval of the Monitoring Plan
Joint Coastal Permit
Western Destin Beach Restoration
Permit No. 0286575-001-JC
Page 23 of 26
there is a request for modification of the permit, the Department may require revised or
additional monitoring requirements as a condition of approval of the permit modification.
As guidance for obtaining Department approval of any changes to the physical
monitoring plan, the revised plan shall generally contain the following items:
a. Topographic and bathymetric profile surveys of the beach and offshore shall be
conducted within 90 days prior to commencement of construction, and within 60
days following completion of construction of the project. Thereafter, monitoring
surveys shall be conducted annually for a period of three (3) years, then biennially
until the next beach nourishment event or the expiration of the project design life,
whichever occurs first. The monitoring surveys shall be conducted during a
spring or summer month and repeated as close as practicable during that same
month of the year. If the time period between the immediate post-construction
survey and the first annual monitoring survey is less than six months, then the
Permittee may request a postponement of the first monitoring survey until the
following spring/summer. A prior design survey of the beach and offshore may
be submitted for the pre-construction survey if consistent with the other
requirements of this condition.
The monitoring area shall include profile surveys at each of the Department of
Environmental Protection’s DNR reference monuments within the bounds of the
beach fill area and along at least 5,000 feet of the adjacent shoreline on both sides
of the beach fill area. For those project areas that contain erosion control
structures, such as groins or breakwaters, additional profile lines shall be surveyed
at a sufficient number of intermediate locations to accurately identify patterns of
erosion and accretion within this subarea. All work activities and deliverables
shall be conducted in