Okaloosa County BOCC — December 18, 2012 — Request for Bids — reading text
Part 12 of 154. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 101-Request for Bids.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Restoration in Progress” and “Dune Vegetation Protected
– Florida Statue Ch. 161” in accordance with the drawings. The
contractor may propose alternative signage materials for approval by the
Engineer. The contractor must submit proper documentation for
proposed materials and outline the advantages of such materials.
Signage posts shall be minimum 3-inch diameter wood posts, no less than
8 feet in length, comprised of treated southern yellow pine, spruce, or
other wood of equal life and strength as may be approved by the
Engineer. The Contractor’s Work Plan shall include the proposed sign and
post details (material type, size, text, etc.).
B. Installation – The contractor shall install signage designating the newly
vegetated dune areas in accordance with the construction drawings.
The contractor shall install signage posts with a minimum 3-foot
embedment into the existing grade. Embedment shall not exceed 4-feet
and shall be uniform across the project area. Signage shall be installed at
the seaward dune toe immediately landward of the sand fencing and
atop the dune crest immediately adjacent to existing dune walkovers and
Last Revised – 01/09/2013 Page 50
foot pathways as depicted in the drawings. Signage installed near the
seaward dune toe shall be attached to the seaward face of the timber
post and face the offshore direction (south) to be viewed from the beach
looking landward. Signage installed near the dune crest adjacent to
walkways and foot paths shall be placed on both the seaward and
landward side of the timber post and face both the offshore (south) and
landward (north) directions. Signage shall be attached to the timber
posts with stainless steel bolts and nuts or tamper-proof steel screws and
plastic washers. The signs shall be placed at the general spacing
depicted in the drawings and in close proximity to and in full view of the
footpaths and dune walkovers.
C. Warranty – The contractor shall warrant the installed signage against
deterioration and decay for twelve months following final acceptance.
The contractor will not be responsible for warranting materials damaged
during extreme storm events.
PART 6 – REPORTING
6.1 REPORTING
A. The contractor shall prepare a daily progress report for submittal by fax or
electronic mail to the Owner & Engineer. At least five (5) days prior to
commencement of the work, the contractor shall submit a sample
progress report to the Engineer for review and approval. The daily
progress shall include, at a minimum:
1. Project Name
2. Contractor’s name & contact information
3. Date of report
4. Weather conditions
5. Work performed (alongshore limits of work referencing baseline
stationing
6. Quantity of materials installed, staged, etc.
7. Problems/delays/issues
8. Instructions given/received
9. Deviations from the drawings and/or specifications
10. Certification statement by the contractor with the contractor’s
signature verifying the reported information.
PART 7 – ENVIRONMENTAL PROTECTION
7.1 GENERAL
Last Revised – 01/09/2013 Page 51
A. The contractor shall conduct all work related activities in a manner so as
to minimize or avoid disturbance to the existing beach and dune
environment. The contractor shall comply with all marine nesting turtle,
beach mice, and shorebird protection requirements as specified in the
Florida Department of Environmental Protection Permit #0286575-001-JC,
U. S. Army Corps of Engineers Permit #SAJ-2008-00895, and referenced
documents. The contractor and subcontractors are responsible for
becoming intimately familiar with the permitting requirements and
referenced documents and their potential impact on the proposed work.
The regulations, requirements, conditions of these regulatory
authorizations are considered a part of the contract and shall be
complied with by the contractor and subcontractors. The contractor is
responsible for informing its personnel and all subcontractor(s) of the
permit requirements and the measures needed to maintain compliance
with these requirements.
7.2 FUELDING OPEATIONS
A. The contractor will not be permitted to dispense fuel on the dune of sandy
beach areas. The contractor shall take all responsibility precautions to
prevent fuel spills or contamination of the ground with fuel. Should any
fuel spills occur, the contractor shall immediately notify the Owner,
Engineer, and any other required parties and immediately recover the
contaminated ground and dispose of it offsite at an approved facility.
7.3 DAILY TURTLE NEST SURVEYS
A. Beginning May 1, Okaloosa County shall conduct daily marine turtle nest
surveys of the beach within work area prior to 9:00 a.m. (local time). The
contractor will be required to coordinate with the designated turtle
monitoring personnel prior to commencing any vehicular activity on the
beach to determine the location of any tests detected. The turtle monitor
shall clearly mark, with stakes and flagging indicating a 3-foot (minimum)
buffer radius, any nest discovered. The contractor shall document and
verify all daily communication with the turtle monitor in the daily report. If
the contractor finds an unmarked nest, the contractor shall prohibit any
work within 10 feet of the nest and notify the Owner, Engineer, and turtle
monitor immediately. Nests that interfere with the contractor’s
uncompleted work, shall be left in place and the contractor shall be
relieved of installation any materials within 10 feet of the nest site.
7.4 IRRIGATION/FERTILIZER
A. The contractor is not permitted to irrigate or fertilize within 10 feet or
upslope of any marked nest.
7.5 LIGHTING
A. Lighting of the beach and/or work area is prohibited.
7.6 BEACH DRIVING
A. The contractor is specifically advised that vehicle driving or parking on the
beach is prohibited, expecting lightweight all-terrain vehicles with ground
Last Revised – 01/09/2013 Page 52
pressure of 10 psi or less. The contractor shall obtain beach driving permits
from the Owner for each vehicle used on the beach. Permits shall remain
with each vehicle and be displayed in the driver’s side windshield.
Vehicle access shall only be through access points designated on the
Construction Drawings. The Contractor is advised the proposed work
area is soft sand, and only appropriate vehicles shall be utilized in support
of the work.
The contractor will be responsible for filling or leveling any alteration of the
beach topography (e.g., tire ruts, vehicle tracks, etc.) resulting from
vehicular activity. The contractor will not be permitted to store any
equipment or materials on the beach. The contractor shall store all
equipment and materials not installed/used during the workday in the
staging areas show on the drawings.
PART 8 – MEASUREMENT & PAYMENT
8.1
A. PAYMENT – Payment shall be in accordance with the unit prices specified
for the work and shall be based on the total number of installed and
accepted units as described below and within these specifications and
the contract documents. The contractor may submit partial payment
requests upon completing the approximate 1,500 to 2,000-feet
acceptance sections shown in the Construction Drawings.
1. Dune Vegetation – Payment for the number of planting units
installed and accepted.
2. Sand Fencing – Payment for the lineal feet of sand fencing
installed and accepted. Sand fencing units will also include the
rope placed along the seaward boundary of the fence.
3. Signage – Payment for the number of signs and sign post installed
and accepted.
4. Post & Rope Access Enhancements – Payment for the lineal feet of
post and rope installed and accepted.
5. Additional payment for items in excess of that indicated on the
Drawings and requested by the Owner will be calculated at unit
prices stated in the contract.
6. Unit prices are to include labor, materials, tools, equipment, and
incidentals for the installation of all work components as listed
herein and on the Drawings.
7. No payment will be made for rejected items, items that do not
comply with applicable sections of these specifications, and those
items that are defective or damaged during handling or
placement.
8. No payment will be made for re-planting or other activities to
conform to the warranty and success criteria provisions stipulated
within these specifications.
Last Revised – 01/09/2013 Page 53
PART 9 –