16 inches in height, as measured from top of the root ball to the apical
meristem, and have a minimum of three healthy stems. 2-inch units shall
have a root ball volume of at least 5 cubic inches. For 4-inch planting
units, Sea Oats and Panic Grasses shall be 12 – 24 inches in height, as
measured from the top of the root ball to the apical meristem, and have
a minimum of four health stems. All diversity species shall be 4-inch
planting units. 4-inch planting units shall have a root ball volume of at
least 26 cubic inches. For the purposes of this specification, the plant
material in a single liner represents one planting unit, regardless of the soil
volume or number of viable stems. The Engineer will reject any plants no
meeting these size constraints.
B. Plant Age – Planting units shall be 60 – to 90-days old for 2-inch planting
units and 90 – to 120-days old for 4-inch planting units, as measured from
the approximate time of germination. The Engineer may reject planting
units younger or older than these specifications. The contractor shall
coordinate delivery to ensure planting units are installed within five (5)
days of the plant being “pulled” at the nursery.
C. Plant Condition – All planting units provided by the contractor shall be of
the highest quality and shall have moist, vigorous root systems free of rot,
disease, or discoloration at the time of delivery and installation. The
Engineer will reject planting units not meeting these specifications. The
Engineer will not consider rejected planting units as delivered to the site
and will not be eligible for payment for production, delivery, or other
costs. The contractor will be responsible for property disposing of rejected
planting units. The contractor shall maintain the high-quality condition of
the plants from the time the plants are “pulled” at the nursery through
planting and continuing throughout the 180-day warranty period (Section
3.6).
The root ball shall be property moistened to prevent desiccation. Prior to
shipping, roots should fill the entire volume of the container, but should not
be root bound. When pulled from the liner/tray, the roots shall support the
soil volume of the container with minimum soil loss. All planting units shall
be handled, packed, transported, and stored at the installation site in
such a manner as to ensure protection against desiccation, thermal stress,
disease, or physical damage. The contractor shall make the planting units
available at all times for inspection by the Engineer. The Engineer will
reject planting units improperly handled, packed, transported, or stored.
D. Number of Planting Units Delivered – The drawings specify the estimated
number of planting units required for the work. Varying site conditions
may require adjustments beyond or below the estimated quantities. The
contractor is required to provide sufficient plant quantities in order to
perform the work in accordance with the contract documents. The
Engineer will determine the final number of planting units eligible for
payment.
Planting units delivered to the work site shall be contained in consistent,
accessible, and uniform packing materials such as waxed boxes. Each
Last Revised – 01/09/2013 Page 45
box delivered to a work site will be subject to planting unit inspection and
counting. The contractor will specify a standard number of within-
specification planting units for the packaging (e.g., 500 per box) before
the Engineer will accept the delivery of planting units to the work site. The
Engineer will reject boxes of planting units that contain fewer than the
established standard number of within-specification planting units. If more
than one box per delivery is found to contain fewer than the established
standard planting unit count, the Engineer will reject all boxes of plants
within that delivery. Boxes of planting units found to contain more than
the standard number of planting units will be considered to contain only
the standard number of planting units per box. The contractor shall
coordinate delivery to ensure an excessive number of plant units and/or
boxes are not staged at the construction site and all units are installed
within five (5) days of the plants being “pulled” at the nursery.
3.4 PLANTING DEPTH & SPACING
A. Planting Unity Depth - The contractor shall install all planting units at a
minimum depth of 6 inches, as measured from the top of the root ball to
the sand surface. The Engineer will reject plants not installed at or below
this depth. Planting units out of compliance with this specification and
unnoticed by the Engineer will be planted solely at the contractor’s risk
and will be subject to all of the survival criteria and warranty provisions
detailed below in Section 3.6 SUCCESS CRITERIA & REPLANTING. In
addition, the Owner may increase the retainage of the contract should
the survival and warranty provisions of these specifications not be met.
B. Planting Unit Spacing – The planting areas shall be paid out in 500-foot
wide (maximum) sections to ensure property coverage and spacing.
Placing units shall be planted in rows, with the most seaward row located
along the lower limit of the planting zone marked on the drawings.
Successive rows located on the dune shall be 12 inches apart for Option 1
or 18 inches apart for Option 2 and planted parallel to the seaward row.
Planting units in each row along the dune slope shall be planted on 12-
inch centers for Option 1 and 18-inch centers for Option 2. Planting units
in each row shall be staggered mid-way (in the shore-parallel direction)
between planting units in the adjacent rows. The contractor may modify
the spacing requirements (+/- 4 inches for Option 1 and +/- 6 inches for
Option 2) for up to 25% of the plants to achieve a more natural look.
Planting units out of compliance with this specification will be planted
solely at the contractor’s risk and will be subject to all of the survival
criteria and warranty provisions detailed below in Section 3.6 SUCCESS
CRITERIA & REPLANTING.
C. Installation – The contractor shall install planting units by hand labor and
tools (e.g., spades, shovels, hand-held augers, etc.). The contractor shall
install planting units to fully cover the planting areas shown in the
drawings. Planting units shall be installed up to existing vegetation,
existing structures (e.g., dune walkovers) or access paths.
D. Final Dressing – The contractor shall smooth the planting area to remove
any large depressions, mounds, or footprints from the finished grade
surface. Filling around plants to provide sufficient burial will not be
permitted.
Last Revised – 01/09/2013 Page 46
3.5 SOIL AMENDMENTS
A. Hydrating Gel & Fertilizer
The contractor shall utilize a hydrating gel such as Stockabsorb, Terr-asorb,
or similar product with all planting units. The contractor shall fully hydrate
the gel according to the manufacturer’s specifications prior to use.
Approximatelly one-half teaspoon of slow release (90-day) pelletized
Osmocote fertilizer, or engineered-approved substitute, with an N:P:K ratio
of 18-6-12, plus trace elements shall be added to the hydrating gel
material for each 2-inch planting unit. The amount of fertilizer added to 4-
inch planting units shall depend on the plant species and manufacturer’s
recommendations. The contractor shall place a minimum of one-half cup
of the hydrated gel/fertilizer mixture at the bottom of the hole beneath
the root zone of each planting unit during installation. The plants shall be
installed such that the root ball is in contact with the hydrated gel/fertilizer
mixture. Dipping the rootball in the hydrating gel/fertilizer mixture prior to
installation will not be permitted. The fertilizer shall conform to the
applicable State of Florida fertilizer laws.
Fertilizer requirements may vary for the different plant species. The
contractor shall place fertilizer in accordance with standard industry
practice for each varying species and size of plant, subject to the
approval of the Owner & Engineer. The contractor’s work plan shall detail
the brand name and manufacturer of the proposed hydrating gel and
fertilizer and proposed ratios for both 2-inch and 4-inch planting units. The
contractor shall include the cost of the hydrating gel and fertilizer within
the installed planting unit bid price.
B. Initial & Maintenance Irrigation
The contractor will be allowed to “water in” (initially irrigate) and
maintenance-irrigate all newly installed planting units such that the root
zone of all newly installed planting units is thoroughly saturated. The
irrigation must be performed in accordance with a contractor-prepared
and engineer-approved irrigation schedule within the submitted water
plan. The watering plan shall detail the proposed number of irrigation
events, irrigation methodology, the equipment,