READ ALONGSIDE THE SOURCE
Okaloosa County School Board — Regular Meeting, April 24, 2023 — reading text
Part 6 of 8. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — CQ5HFL484D7E.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Subject : 8.9 Leave Without Pay, presented by
Lee Hale, Assistant Superintendent,
Human Resources, and recommended
by the Superintendent for approval.
Meeting : Apr 24, 2023 - Regular Meeting
Type : Action
Preferred Date : Apr 24, 2023
Absolute Date : Apr 24, 2023
Recommended Action : Motion to approve leave without pay.
Public Content
The purpose of this item is to receive approval for employees who took leave and will not be paid for their leave.
For more information, contact Lee Hale at 850-833-5801.
Motion & Voting
Motion to approve leave without pay.
Motion by Linda Evanchyk, second by
Tim Bryant.
Final Resolution: Motion Carries
Yes: Tim Bryant, Linda Evanchyk,
Marti Gardner, Lamar White
10. Construction Program/Owner's Representative's Business
Subject : 10.1 Program Status Report by the
Board's Representative to the
Construction Program
Meeting : Apr 24, 2023 - Regular Meeting
Type : Action, Information
10. Construction Program/Owner's Representative's Business
Subject : 10.2 TPM Program #6, Task Order
#20 - GMP Scope Modification,
2022/2023 Priority Roofing Projects,
presented by Dr. Bill Smith, Program
Director, Facilities Planning, and
recommended by the Superintendent
for approval.
Meeting : Apr 24, 2023 - Regular Meeting
Type : Action
Preferred Date : Apr 24, 2023
Absolute Date : Apr 24, 2023
Dollar Amount : $11,072,613.00
Budget Source : Certificates of Participation 2022A
Recommended Action : Motion to approve TPM Program #6,
Task Order #20 - Guaranteed
Maximum Price (GMP) Scope
Modification, 2022/2023 Priority
Roofing Projects, in the amount of
$7,572,095.00 and Owner Direct
Purchase (ODP) in the amount of
$3,500,518.00. Approval of this GMP
Scope Modification is subject to the
receipt of the validation report from
Faithful + Gould.
Public Content
Approval is requested of the GMP Scope Modification for Program #6, Task Order #20 - 2022/2023 Priority Roofing Projects.
Ft. Walton Beach High School Restoration Roofing Projects – This project consists of the restoration (coatings) of the existing
Tremco Modified Bitumen roof system that covers the Gymnasium, Auditorium, Locker Rooms, Band Room, Chorus Room, classrooms,
restrooms, labs, Cafeteria, Kitchen and Media Center areas of the main building. The Tremco Alphaguard BIO system with Permafab
reinforcing mesh will be applied. The restoration work totals approximately 1700 squares.
Silver Sands School Replacement/Restoration Roofing Project – This project consists of the removal and replacement of the
existing coated reinforced single ply membrane over 3” thick polyisocyanurate insulation board roof system that covers Building 5. This
system was installed over metal decking which shall remain. This Building 5 tear-off area is approximately 115 squares. A new Tremco
Powerply Endure BIO 100 roofing system will be installed. We will be performing roof restoration (coatings) at the adjacent roof on the
hallway between Buildings 1 and 4. The Tremco Alphaguard BIO system with Permafab reinforcing mesh will be applied. The restoration
work totals approximately 10 squares. New edge metal, gutters and downspouts are included in the scope for Building 5.
Niceville High School Replacement Roofing Projects – This project consists of the removal and replacement of the existing 2” thick
polyurethane foam roof system at the 700 Building (ROTC). This foam system was installed over the original built-up roof system so both
existing roofs must be removed down to the existing lightweight concrete deck which shall remain. This building 700 tear-off area is
approximately 30 squares. The project also consists of the removal and replacement of the existing mechanically attached single ply
membrane over 3” thick polyisocyanurate insulation board roof system that covers Building 400 and the Volleyball Locker Room areas.
This system was installed over metal decking which shall remain. This Building 400 and Volleyball Locker Room tear-off area is
approximately 100 squares. We will also be removing and replacing the existing fully-adhered single-ply roof system on the entrance
area adjacent to the Volleyball Locker Rooms as part of this scope. This single-ply roof system was installed over a lightweight concrete
deck which shall remain. This entrance roof tear-off area is approximately 7 squares. We will also be replacing the existing fully adhered
modified bituminous roof over the Front Office Bookkeeper’s Area. This Front Office Bookkeeper area work totals approximately 33
squares. A new Tremco Powerply Endure BIO 100 roofing system will be installed at all areas. New edge metal, gutters and downspouts
are included for all areas. Finally, we will be removing and replacing the existing asphalt shingle roof on Building 10 Wrestling and Girl’s
Locker Room with new Tremco Tremlock T-138 24GA Galvanized Standing Seam Roof over the existing plywood decking. This Building
10 area totals approximately 50 squares.
Ruckel Middle School Replacement/Restoration Roofing Projects – This project consists of the removal and replacement of the
existing coated hot-mopped modified 2- ply bituminous membrane over gravel-topped built-up roofing system that covers Building 8
(Kitchen). This system was installed over lightweight concrete decking which shall remain. This Building 8 tear-off area is approximately
33 squares. A new Tremco Powerply Endure BIO 100 roofing system will be installed. We will also be performing roof restoration
(coatings) at the existing single-ply roofs on Buildings 10 and 17. The Tremco Alphaguard BIO system with Permafab reinforcing mesh
will be applied. The restoration work totals approximately 58 squares. New gutters and downspouts are included in the scope for Building
8.
Laurel Hill School Replacement Roofing Projects – This project consists of the removal and replacement of the existing mechanically
attached single ply membrane over 9” thick tapered polyisocyanurate insulation board roof system that covers Buildings 1 and 2 (Low
roof areas adjacent to Gym). This system was installed over metal decking which shall remain. This Building 1 and 2 tear-off area is
approximately 47 squares. This project also consists of the removal and replacement of the existing fully adhered fleece backed single
ply membrane over 2” spray polyurethane foam insulation over gravel surfaced built-up roof system that covers Building 13 (Kitchen and
Cafeteria). This system was installed over metal decking which shall remain. This Building 13 tear-off area is approximately 83 squares.
A new Tremco Powerply Endure BIO 100 roofing system will be installed at all areas. New gutters and downspouts are included in the
scope for all buildings.
Crestview High School Replacement Roofing Projects – This project consists of the removal and replacement of the existing hot
applied modified bituminous membrane over ½” wood fiber board over 1-1/2” polyisocyanurate insulation roof system that covers a
portion of the Cafeteria. This system was installed over lightweight concrete decking which shall remain. This Cafeteria tear-off area is
approximately 50 squares. The project also consists of the removal and replacement of the existing mechanically fastened single ply
membrane over 2.5” thick polyisocyanurate insulation board roof system that covers Building 8F (CTE Robotics/AI Building). This system
was installed over metal decking which shall remain. This Building 8F tear-off area is approximately 40 squares. A new Tremco Powerply
Endure BIO 100 roofing system will be installed at both areas. New gutters and downspouts are included in the scope for both areas.
Richbourg School Building 25 Replacement Roofing Project – This project consists of the removal and replacement of the existing
fully-adhered single-ply roof system over 2” mechanically fastened polyisocyanurate insulation on Building 25 (Old Front Office Building).
This single-ply roof system was installed over a metal deck which shall remain. The tear-off area of Building 25 is approximately 60
squares. A new Tremco Powerply Endure BIO 100 roofing system will be installed. New gutters and downspouts are included in the
scope for Building 25.
The Total Cost of Work for Task Order #20 GMP Scope Modification is recapped below:
Jacobs/Titan Guaranteed Maximum Price (GMP) $7,572,095.00
Owner Direct Purchase (ODP) of Tremco Materials 3,500,518.00
Total Cost of Work $11,072,613.00
Please contact Dr. Bill Smith for additional information, 689-7158.
File Attachments
TO20 GMP 2022-2023 Priority Roofing Ver 1.0.pdf (263 KB)
TO#20 Priority Roofing GMP Comparison Spreadsheet.pdf (33 KB)
Prime Contract Change Order, Task Order #20, Change Order #1.pdf (279 KB)
Motion & Voting
Motion to approve TPM Program #6,
Task Order #20 - Guaranteed
Maximum Price (GMP) Scope
Modification, 2022/2023 Priority
Roofing Projects, in the amount of
$7,572,095.00 and Owner Direct
Purchase (ODP) in the amount of
$3,500,518.00. Approval of this GMP
Scope Modification is subject to the
receipt of the validation report from
Faithful + Gould.
Motion by Tim Bryant, second by
Linda Evanchyk.
Final Resolution: Motion Carries
Yes: Tim Bryant, Linda Evanchyk,
Marti Gardner, Lamar White
10. Construction Program/Owner's Representative's Business
Subject : 10.3 Program #6, Task Order #24,
GMP for Central Administration
Complex Renovation (Phase 1),
presented by Dr. Bill Smith, Program
Director, Facilities Planning, and
recommended by the Superintendent
for approval.
Meeting : Apr 24, 2023 - Regular Meeting
Type : Action
Preferred Date : Apr 24, 2023
Absolute Date : Apr 24, 2023
Fiscal Impact : Yes
Dollar
