July 1, 2014

Okaloosa County BOCC — July 1, 2014 — Change Order #4

Okaloosa County Board of County Commissioners change order #4 for the July 1, 2014 meeting. Official document preserved from the county IQM2 public portal, with a searchable OCR text layer.

FILED WITH

About this source

Change Order #4 from the Okaloosa County BOCC meeting of July 1, 2014 (IQM2 meeting #1220). Original portal label: Change Order #4. Preserved as a historical public record; part of the meeting linked as a related source.

Original publication
Change Order #4
Date
July 1, 2014
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Machine produced / unreviewed — machine-extracted, not yet human-corrected
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Change Order #4 (PDF)

Original PDF as published on the Okaloosa County IQM2 meeting portal.

PDF · 375.9 KB

Download ↓

Machine-extracted text — 57-Change Order _4.pdf

Text extracted on 2026-10-31 from 57-Change Order _4.pdf using optical character recognition (ocrmypdf/tesseract). Not human-corrected; may contain recognition errors. Read alongside the source images.

Text · 1.8 KB

Download ↓

Full text

Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.

CHANGE ORDER FORM Date: 6/23/14 Contract No: C-/4/-Z2!7)/ - HD Change Order No.:__7/ Owner: __ OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS Contractor;_Jimm v Henderson IE Constcuction Inc. CHANGE TO CONTRACT PRICE DESCRIPTION AMOUNT Original Contract Price: &R 943 rial “ Net change by previously authorized Change Orders: & 10, 737 ~ Present Contract Price: & loo, 551- This Change Order will (add/deduct): # 730 ~ New Contract Price: * LOS, 30 | CHANGE TO CONTRACT TIME DESCRIPTION DATE or NUMBER OF DAYS Original Contract Time: Original Substantial Completion Date: 5/6 /Zoly Net change by previously authorized Change Orders: AS days This Change Order will (add/deduct): Z| days New Contract Time: New Substantial Completion Date: 7 /[z l / ! ed APPROVALS REQUESTED BY: J —f— pate: @/ 23/14 PROJECT ENGINEER: DATE:_ @/%2 3/144 1 é CONTRACTOR: 22 aA DATE: S/Z23//% OWNER: NO. DATE: ula | This Change Order is an amendment to the Contract/Agreement between Contractor and the Owner, and all other contract provisions shall remain in full force and effect unless specifically amended in writing, signed by both parties. Signature Date Okaloosa County Board of County Commissioners Charles K. Windes, Jr., Chairman JIMMY HENDERSON II CONSTRUCTION COMPANY, INC. 714-B Bob Sikes Boulevard, Fort Walton Beach, Florida 32547 (850) 864-5426 Fax (850) 864-5428 JimmyHendersonConst.com License # CG-C062300 Proposal Date: Friday June 20th, 2014 Owner: Okaloosa County Health Dept. 221 Hospital Dr. Fort Walton Beach, FL 32548 Contact: Shaun May Phone: (850) 699-4225 Property Location: Modular Building @ 221 Hospital Dr. NW We Propose to complete the following items at the above stated property location as per the following scope of work. Additional Pickets to be installed at ramps Furnish and install wooden pickets to match existing at outside of both ramps... $750

Related sources

Citation & reuse

“Okaloosa County BOCC — July 1, 2014 — Change Order #4.” July 1, 2014. Change Order #4. Crypt of Echoes evidence ID LED-2026-968e65ada65d49b5a7236cdb3b328eec. https://cryptofechoes.com/evidence/LED-2026-968e65ada65d49b5a7236cdb3b328eec. Accessed [date].

Public record of Okaloosa County, Florida.

Technical archive record ↓