About this source
WorldFiberTaskOrder17 from the Okaloosa County BOCC meeting of November 4, 2014 (IQM2 meeting #1237). Original portal label: WorldFiberTaskOrder17. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- WorldFiberTaskOrder17
- Date
- November 4, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
Machine-extracted text — 65-WorldFiberTaskOrder17.pdf
Text extracted on 2026-10-31 from 65-WorldFiberTaskOrder17.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 5.0 KB
Download ↓WorldFiberTaskOrder17 (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 1.2 MB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
Okaloosa County Information Systems Fiber Optic Maintenance
Contract Number C 1O-1838-IS
Task Order 17
CONTRACT #: C10-1838-IS
TASK ORDER #: .lZ
TASK ORDER AMOUNT: $100,000.00
OFFERED BY CONSULTANT:
World Fiber Technologies , Inc.
FIRM'S NAME
Mark L. Battle
REPRESENTATIVE'S PRINTED NAME
N:\9<.'-~~ ~ (&
SIGNATURE
President/CEO
TITLE
RECOMMENDED FOR APPROVAL APPROVED BY OKALOOSA COUNTY
(Department Director) (Per Purchasing Manual)
• $25,000 or less approved by Purchasing
Director
• Between $25,001 and $50,000 approved
by Purchasing Director and County
Administrator
• In excess of $50,000 approved by the
Board.
SING DIRECTOR ~ Rcfc-rJc
DATE
DATE~
CHAIRMAN (if applicable)
DATE DATE
10 - 17 - 14P12:20 RCVD
-
Okaloosa County Information Systems Fiber Optic Maintenance
Contract Number C 10-1838-IS
Task Order 17
This Task Order is issued pursuant to the Agreement for Maintenance for
Okaloosa County Fiber Optic Network dated November 17 th , 2010, Between
Okaloosa County, Florida and World Fiber Technologies, Inc., which is
incorporated herein by this reference, with respect to
Scope of Basic Services
for
Okaloosa County Information Systems Fiber Optic Maintenance
PURPOSE
The purpose of this Task Order is to authorize and direct the CONTRACTOR
(World Fiber Technologies, Inc.) to proceed with necessary installation, testing or
maintenance services for the Okaloosa County Information Systems Department
(OWNER). The activ,ilties that are included are described in "Scope of Services."
SCOPE OF SERVICES
The CONTRACTOR (World Fiber Technologies, Inc.) agrees to perform the
technicol and construction related services in accordance with contract C 10
1838-IS doted November pth, 2010 as requested and directed by the OWNER.
1. Emergency Response Level I, II, or III as necessary to react quickly to
scheduled or unschedu'l ed fiber optic outages.
2. Furnishing and installing 2" conduit, pull boxes, splice enclosures, fiber
optic coble, terminations, splices and troubleshooting and any other
related materials, equipment or labor to properly maintain or extend the
county fiber optic network on an os-needed basis.
2
Okaloosa County Information Systems Fiber Optic Maintenance
Contract Number C 10- 1838-IS
Task Order 17
COMPENSATION PROVISIONS
As compensation for providing the services under this Task Order, the OWNER
shall pay the CONTRACTOR in accordance with the November 17th, 2010
agreement for the actual work completed and accepted by the OWNER.
Invoicing must sh ow specific quantities and grouped by each assigned task with
sufficient detail to fully report results, conclusions, and recommendations as
required. Each invoi~ce will also show tota l to date of all invoices under this task
order.
The Not to Exceed (NTE) amount for this tosk order is: __$100,000.00_ __
PERIOD OF SERVICE
The schedule for the services provided under this task order shall be in
accordance with the November 17, 2010 Agreement and will remain in effect
until the NTE amount is reached or otherwise terminated by the OWNER.
AUTHORIZED REPRESENTATIVES
The Authorized Representatives designated below are authorized to act with
respect to this Task Order. Communications between the parties shall be
through the Authorized Representatives:
For OWNER: For CONTRACTOR :
Dan Sambenedetto Jerry Neely
dsam benedetto@co.okaloosa.fl.us jneely@worldfiber.com
1804 Lewis Turner Blvd Suite 402 5665 Shirlee Industrial Way
FWB, F'L 32547 Alpharetta, GA 30004
850-651-7570,850-200-5346 770-619-0118
Mark L. Battle, President/CEO
REPRESENTATIVE'S PRINTED NAME
~(1~ tk#(~
SIGNATURE
3
Related sources
This worldfibertaskorder17 is part of the Okaloosa County BOCC meeting of November 4, 2014.