READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2025-07 Supporting Temp Road Close for SR 87 Resurfacing — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-41992-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

RESOLUTION 2025- 7 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FORT WALTON BEACH, FLORIDA, TO SUPPORT AND APPROVE THE FLORIDA DEPARTMENT OF TRANSPORTATION FOR TEMPORARY ROAD CLOSURES PURSUANT TO COMPLETION OF THE MILLING AND RESURFACING OPERATIONS ON SR 85 FROM SR 30 ( US 98) TO RICHBOURG AVENUE AS A PART OF FPID NO. 450813- 1- 52- 01; PROVIDING FOR TRANSMITTAL OF THE RESOLUTION; AND PROVIDING FOR AN EFFECTIVE DATE WHEREAS, the State of Florida Department of Transportation ( FDOT) proposes to construct or improve State Road No. 85 ( Eglin Parkway), Financial Project No. 450813- 1- 52- 01, in Okaloosa County; and WHEREAS, The Florida Department of Transportation proposes to deep mill and resurface significant pavement failures in the City of Fort Walton Beach, Florida; and WHEREAS, for FDOT to proceed with Project No. 450813- 1- 52- 01, it is necessary that certain roads ( as identified) some of which are owned and maintained by City of Fort Walton Beach be utilized as an alternative method of traveling during the milling and resurfacing of SR 85; and WHEREAS, said road closures are performed in accordance to the attached documents; and NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF FORT WALTON BEACH: Section 1. City of Fort Walton Beach Authorization and Direction The City Council of the City of Fort Walton Beach, Florida authorizes the Mayor to execute and deliver to FDOT the temporary and permanent road closures as identified herein. Section 2. Transmittal of Resolution A certified copy of this resolution to be forwarded to the Florida Department of Transportation at 1074 Highway 90, Chipley, Florida 32428. Section 3. Effective Date This Resolution shall become effective upon adoption by City Council and signature of the Mayor. RESOLUTION 2025- 7 Adopted: o -;- S Nic Allegrejt ayor Attest: Approved as to legal form and sufficiency for ort Walton Beach, only. Kim . Barnes, City Clerk theN Kimberly Romano Kopp, City Attorney Okaloosa County Resurfacing, Rehabilitation, Restoration ( RRR) Project State Road 85 ( Eglin Parkway) from State Road 30 ( US 98) to Richbourg Avenue FPID: 450813- 1 Section No.: 57040000, 57040024 Ift8 — -- Paradise CMP 4. 652 57040000) Point Y SHAL I MAS Pop. 718 A, 2 Part of 8 C FORT WALTON BEACH Smack Pt. Z 116 WAL TON EACH C I NC0 BAYOU 9, 973 I Pop. 377 1/ 2 MILE 85 BEGIN PROJECT CMP 0. 125 AL TON CMP 0. 000 0 r 0 57040024) 57040024) • CMP 0. 030 57040000) PROJECT LOCATION MAP i Zu* SR 85 0— f i END DETOUR z mm CLOSED 0 mm m# eG 4— Ino § ymp ^ t

Download this text file with its original spacing ↓