READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — February 18, 2014 — Underground Electric Manhole — reading text
Part 45 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 97-Underground Electric Manhole.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
terminating fittings to be used, and seal around penetrations after
fittings are installed.
G. For enclosures installed in asphalt paving and subject to occasional, nondeliberate,
heavy-vehicle loading, form and pour a concrete ring encircling, and in contact with,
enclosure and with top surface screeded to top of box cover frame. Bottom of ring
shall rest on compacted earth.
1. Concrete: 3000 psi, 28-day strength, complying with Division 3 Section "Cast-in-
Place Concrete," with a troweled finish.
2. Dimensions: 10 inches wide by 12 inches deep.
3.7 GROUNDING
A. Ground underground ducts and utility structures according to Division 16 Section
"Grounding and Bonding."
3.8 FIELD QUALITY CONTROL
A. Perform the following tests and inspections and prepare test reports:
1. Demonstrate capability and compliance with requirements on completion of
installation of underground ducts and utility structures.
2. Pull aluminum or wood test mandrel through duct to prove joint integrity and test
for out-of-round duct. Provide mandrel equal to 80 percent fill of duct. If
obstructions are indicated, remove obstructions and retest.
UNDERGROUND DUCTS DATE: 9/16/2013 @
OKALOOSA COUNTY WATER AND SEWER
16135 - 23
SECTION 16135 Russell Stephenson - Electrical Manhole Rehabilitation
UNDERGROUND DUCTS
?
3. Test manhole and handhole grounding to ensure electrical continuity of grounding
and bonding connections. Measure and report ground resistance as specified in
Division 16 Section "Grounding and Bonding."
B. Correct deficiencies and retest as specified above to demonstrate compliance.
3.9 CLEANING
A. Pull leather-washer-type duct cleaner, with graduated washer sizes, through full length
of ducts. Follow with rubber duct swab for final cleaning and to assist in spreading
lubricant throughout ducts.
B. Clean internal surfaces of manholes, including sump. Remove foreign material.
END OF SECTION
UNDERGROUND DUCTS DATE: 9/16/2013
OKALOOSA COUNTY WATER AND SEWER
16135 - 24
UNDERGROUND ELECTRICAL MANHOLE REHAB PROJECT
RUSSELL STEPHENSON WRF, OKALOOSA COUNTY
DATE: September 30, 2013
BID #: WS 03-14
ADDENDUM NO. 1
TO THE CONTRACT DOCUMENTS:
ELECTRICAL MANHOLE REHAB
Russell Stephenson WRF Project
Okaloosa County Water and Sewer System
Okaloosa County, Florida
To All Document Holders:
The following changes, additions, and or deletions are hereby made a part of the Bidding
Documents for the Underground Electrical Manhole Rehabilitation Project for the
Russell Stephenson WRF, Bid # WS 03-14 as fully and completely as if the same were fully set
forth therein:
CONTRACT DOCUMENTS
NOTICE TO BIDDERS
1) BID DATE
a. CHANGE -The bid date from October 3, 2013 @ 3:05 PM to October 10,
2013 @ 3:05 PM. Please replace the previous Notice to Bidders with the
attached revised document. The bid opening location and delivery
location will remain the same.
SPECIFICATIONS
00500 —- STANDARD AGREEMENT
2) ARTICLE 4 - CONTRACT TIME
DELETE -Section 4.02.A in its entirety and replace with the following in its place:
4.02.A The Work shall be substantially completed within 90 calendar days from
the date the Notice to Proceed is issued as provided in paragraph 2.03
of the General Conditions. The 90 days shall also include a
maximum 10 calendar days for Owner submittal review. All Work
shall be completed and ready for final payment in accordance with
paragraph 14.07.B of the General Conditions within 120 days from the
date when the Contract Time commences to run.
ADDENDUM NO. 1
Project No. 100100.72 Revised: 9/30/2013
UNDERGROUND ELECTRICAL MANHOLE REHAB PROJECT
RUSSELL STEPHENSON WRF, OKALOOSA COUNTY
DRAWINGS
1. Sheet E-4 has been revised to show the location of the new 2” PVC sump drain line.
The sump drain line is to be routed underground from each manhole back to the existing
site drain manhole located near electrical manhole #1.
2. Sheet E-5 has been updated to show the location of the existing chlorine solution line.
The existing solution line must remain in service during construction and shall be
required to be supported at a minimum of every 6’. In addition, the sheet has been
updated to show the replacement of the following:
a. Existing manhole light fixture, conductor, weatherproof cover, housing, and
switch
b. Existing receptacle, conductors, weatherproof cover, and housing
3. Sheet E-6 has been updated to show the location of the new 2” PVC sump drain header
in the conduit and conductor details.
PRE-BID QUESTIONS AND RESPONSES
1. Does the installation of the three new electrical conduits encompass all electrical
conduits to be replaced under this contract? No. All conduits that have been identified
for replacement on sheet E-6 shall be replaced or repaired and shall not be considered
as one of the three new conduits that shall be installed. The intent of the three new
conduits is to provide the Contractor a means to transition conductors between the
manholes to facilitate the staging that shall be required for the installation.
. Will splices be allowed inany of the manholes? Splices shall be allowed in circuits or
conductor runs that transition to small diameter conduit and conductors that serve
r individual pieces of process equipment. All splices shall be made with waterproof epoxy
splice kits manufactured by 3M or Engineer approved equal.
Please clarify the routing and size of the sump pump discharge line. The contractor
shall be required to run a common 2” PVC sump pump discharge header between
manholes 1, 2, 3, and the existing plant drain manhole. Each connection to the header
in the electrical manholes shall be provided with check valves.
How thick should the polyurethane coating be applied? 125 mils
What are the plant operating hours? Monday through Friday 6am — 2pm.
The drawings indicate that the entire manhole exterior is to be coated, does the bottom
need to be coated? No.
7. Does the manhole gasket need to be replaced? The existing manhole gasket shall
remain and the areas allowing the water infiltration shall be repaired.
8. Should a conduit marker be utilized to indicate the location of the new underground
ducts? Yes. A standard concrete utility marker may be utilized which indicates ‘DANGER
UNDERGROUND ELECTRIC CABLES’
N
wo
ook
ADDENDUM NO. 1
Project No. 100100.72 Revised: 9/30/2013
UNDERGROUND ELECTRICAL MANHOLE REHAB PROJECT
RUSSELL STEPHENSON WRF, OKALOOSA COUNTY
All Plan Holders shall acknowledge receipt and acceptance of Addendum No. 1 in the Proposal
or by submitting the executed Addendum to Constantine Engineering prior to Proposal
Submittal.
Constantine Engineering
[/Signed//
Joey G. Crews
Receipt acknowledged and conditions agreed to this
10th day of October 2012
Bill Smith Electric, Inc.
BIDDER
fl. UG Bill Smith, President
By i “CO 7 ,
END OF ADDENDUM NO. 1
ADDENDUM NO. 1
Project No. 100100.72 Revised: 9/30/2013
UNDERGROUND ELECTRICAL MANHOLE REHAB PROJECT
RUSSELL STEPHENSON WRF, OKALOOSA COUNTY
DATE: October 3, 2013
BID #: WS 03-14
ADDENDUM NO. 2
TO THE CONTRACT DOCUMENTS:
ELECTRICAL MANHOLE REHAB
Russell Stephenson WRF Project
Okaloosa County Water and Sewer System
Okaloosa County, Florida
To All Document Holders:
The following changes, additions, and or deletions are hereby made a part of the Bidding
Documents for the Underground Electrical Manhole Rehabilitation Project for the Russell
Stephenson WRF, Bid # WS 03-14 as fully and completely as if the same were fully set forth
therein:
CONTRACT DOCUMENTS
SPECIFICATIONS
1. Specification section 00300 Bid Proposal has been updated to include a deductive
alternative option for the interior coating of the electrical manholes in lieu of the exterior
coating as shown in the project plans.
2. Specification section 01010 Summary of Work has been updated to include the
requirements for the deductive alternate (interior electrical manhole coating).
PRE-BID QUESTIONS AND RESPONSES
1. Could the coating system be applied to the interior of the electrical manholes in lieu of
the exterior? Application of the coating system to the interior of the electrical manholes
can be submitted with the bid as a deductive alternate. See the revised Summary of
Work specification issued in this addendum for details.
2. Will an electrical permit be required for the proposed work? Okaloosa County Growth
Management indicates - Electrical Permit: Electrical work requiring disconnect of primary
service from equipment and re-pulling primary service wires will require submittal of
sketch drawing by Contractor showing work to be performed for review and fee
determination; Fee will be evaluated during work review and may be waived if not
required. No permit required for general manhole coating or interior reconnects.
3. During the transition period will temporary power be required to the existing load being
re-fed? The contractor shall have provisions available to temporarily power any of the
loads that have been taken offline in the event that the load can’t be re-fed in the
schedule downtime window. The contractor may utilize SO style cable that has
temporarily been installed above grade (in areas where personnel and equipment traffic
don’t routinely occur). All temporary power cables installed in personnel or equipment
traffic areas shall be protected from damage:
ADDENDUM NO. 2
Project No. 100100.72 Revised: 10/4/2013
UNDERGROUND ELECTRICAL MANHOLE REHAB PROJECT
RUSSELL STEPHENSON WRF, OKALOOSA COUNTY
4. Will the requirement for the dewatering system to be designed and sealed by a Florida
PE be maintained for this project? Based on the size and scope of the dewatering
associated with this project the requirement for the Florida PE shall be relieved.
However, the Contractor shall be required to submit a detailed dewatering plan and
equipment breakdown for approval prior to commencement of any dewatering functions.
All Plan Holders shall acknowledge receipt and acceptance of Addendum No. 1 in the Proposal
or by submitting the executed Addendum to Constantine Engineering prior to Proposal
Submittal.
Constantine Engineering
/Siqned/
Joey G. Crews
Receipt acknowledged and conditions agreed to this
10th _dayof October , 2013
Bill Smith Electric, Inc.
BIDDER
Bill Smith, President
END OF ADDENDUM NO. 2
ADDENDUM NO. 2
Project No. 100100.72 Revised: 10/4/2013
SECTION 00300 Russell Stephenson - Electrical Manhole Rehabilitation
BID PROPOSAL
SECTION 00300 - BID PROPOSAL
Place, OKaloosa County
Date 10 October 2013
Project No. 03-2014
Proposal of Bill Smith Electric, Inc. (hereinafter called "Bidder") *a
corporation, organized and existing under the laws of the State of Florida *q
partnership, or an individual doing business as
to the Okaloosa County (hereinafter called "OWNER").
1.01
2.01
3.01
The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an
agreement with OWNER in the form included in the Bidding Documents to perform and
furnish all Work as specified or indicated in the Bidding Documents for the Bid Price(s)
and within the Bid Times indicated in this Bid and in accordance with the other terms and
conditions of the Bidding Documents.
BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid
and Instructions to Bidders, including without limitation those dealing with the
disposition of Bid security. This Bid will remain subject to acceptance for thirty-five (35)
days after the day of Bid Opening. BIDDER will sign and deliver the required number of
counterparts of the Agreement with the Bonds and other documents required by the
Bidding Requirements within fifteen (15) days after the date of OWNER'S Notice of
Award.
In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement,
that:
A. BIDDER has examined and carefully studied the Bidding Documents, the other
related data identified in the Bidding Documents, and the following Addenda
receipt of all which is hereby acknowledged:
(List