Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

entities to use temporary services and facilities without cost, including, but not limited to, OWNER's construction forces, ENGINEER, occupants of Project, testing agencies, and authorities having jurisdiction. Water Service: Water from OWNER's existing water system is available for use with metering and with payment of use charges. Provide connections and extensions of services as required for construction operations. Electric Power Service: Provide connections and extensions of services as required for construction operations at no expense to the OWNER. SUBMITTALS Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for construction personnel. Administrative Submittals: Copies of permits and approvals for construction as required by Laws and Regulations and governing agencies. TEMPORARY FACILITIES AND CONTROLS OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013 01500-1 SECTION 01500 TEMPORARY FACILITIES AND CONTROLS @ C. Shop Drawings: 1. Temporary Utility Submittals: Dewatering well locations, if required. 2 Temporary Construction Submittals: a. Access Roads: Routes, cross-sections, and drainage facilities. b. Parking area plans c. CONTRACTOR’s field office, storage yard, and storage building plans, including gravel surfaced areas. d. _ Fencing and protective barrier locations and details. e. Staging area location plan. f. Traffic Control and Routing Plans: As specified herein, and proposed revisions thereto. Temporary Control Submittals: a. Noise control plan. b Dust control plan. c. Plan for disposal of waste materials and intended haul routes. d Seismic control plan (by others). 1.5 MOBILIZATION A. Mobilization shall include, but not be limited to, these principal items: @ 1. Obtaining required permits. 2. Moving CONTRACTOR’s field office and equipment required for first month operations onto site. 3. Installing temporary construction power, wiring, and lighting facilities. 4. Providing onsite communication facilities, including telephones. 5. Providing onsite sanitary facilities and potable water facilities as specified and as required by Laws and Regulations, and governing agencies. 6. Arranging for the erection of CONTRACTOR’s work and storage yard. 7. Posting OSHA required notices and establishing safety programs and procedures. 8. Having the CONTRACTOR’s superintendent at site. B. Use area designated for CONTRACTOR’s temporary facilities as shown on Drawings. 1.6 CONTRACTOR’S USE OF PREMISES A. Lands furnished by OWNER upon which CONTRACTOR shall perform the Work are as shown in the Contract Documents. TEMPORARY FACILITIES AND CONTROLS OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013 01500-2 SECTION 01500 TEMPORARY FACILITIES AND CONTROLS 1.7 A. 1.8 1.9 PERMITS Permits, Licenses, or Approvals: Coordinate with the OWNER’s representative to obtain the necessary permits in accordance with the General Conditions and as otherwise may be provided in the Supplementary Conditions and retain onsite. QUALITY ASSURANCE Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits. PROJECT CONDITIONS Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before OWNER's acceptance, regardless of previously assigned responsibilities. PART 2 - PRODUCTS 2.1 A. 2.2 TEMPORARY FACILITIES Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommodate materials and equipment for construction operations. EQUIPMENT Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures. Heating Equipment: Unless OWNER authorizes use of permanent heating system, provide vented, self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control. 1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited. 2. Heating Units: Listed and labeled for type of fuel being consumed, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. TEMPORARY FACILITIES AND CONTROLS OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013 01500-3 SECTION 01500 TEMPORARY FACILITIES AND CONTROLS 2.3 A. PART 3 3.1 3.2 PROJECT SIGN Refer to Project Sign Detail on Drawings. - EXECUTION INSTALLATION, GENERAL Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities. TEMPORARY UTILITY INSTALLATION General: Install temporary service or connect to existing service. 1. Arrange with OWNER for time when service can be interrupted, if necessary, to make connections for temporary services. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully. 1. | Connect temporary sewers to municipal system as directed by ENGINEER. Water Service: Install water service and distribution piping in sizes and pressures adequate for construction. Water Service: Use of OWNER's existing water service facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to OWNER. At Substantial Completion, restore these facilities to condition existing before initial use. 1. Where installations below an outlet might be damaged by spillage or leakage, provide a drip pan of suitable size to minimize water damage. Drain accumulated water promptly from pans. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of construction personnel. Comply with authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities. 1. Toilets: Use of OWNER's existing toilet facilities will not be permitted. TEMPORARY FACILITIES AND CONTROLS OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013 01500-4 SECTION 01500 TEMPORARY FACILITIES AND CONTROLS F. 3.3 Electric Power Service: Use of OWNER's existing electric power service will be permitted, as long as equipment is maintained in a condition acceptable to OWNER. Cost of electrical power used in performance and acceptance testing will be borne by the OWNER. Electric Power Service: Provide electric power service and distribution system of sufficient size, capacity, and power characteristics required for construction operations. 1. | Connect temporary service to OWNER's existing power source, as directed by OWNER. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations, observations, inspections, and_ traffic conditions. 1. Install and operate temporary lighting that fulfills security and protection requirements without operating entire system. Telephone Service: Provide temporary telephone service in common-use facilities for use by all construction personnel. Pay all cost of installation and monthly bills. 1. No incoming calls allowed to OWNER’s plant telephone system. 2. Provide superintendent with cellular telephone and portable two-way Nextel radio for use when away from field office. Electronic Communication Service: Provide temporary electronic communication service, including electronic mail in field office. SUPPORT FACILITIES INSTALLATION General: Comply with the following: 1. Provide incombustible construction for offices, shops, and sheds located within construction area or within 30 feet of building lines. Comply with NFPA 241. 2. Maintain support facilities until near Substantial Completion. Remove before Substantial Completion. Personnel remaining after Substantial Completion will be permitted to use permanent facilities, under conditions acceptable to OWNER. Temporary Roads and Paved Areas: Construct and maintain temporary roads and paved areas adequate for construction operations. Locate temporary roads and paved areas within construction limits indicated on Drawings. 1. Provide dust-control treatment that is nonpolluting and nontracking. Reapply treatment as required to minimize dust. Temporary Roads and Paved Areas: Construct and maintain temporary roads and paved areas adequate for construction operations. Locate temporary roads and paved areas in TEMPORARY FACILITIES AND CONTROLS OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013 01500-5 SECTION 01500 TEMPORARY FACILITIES AND CONTROLS 6 same location as permanent roads and paved areas. Extend temporary roads and paved areas, within construction limits indicated, as necessary for construction operations. 1. Coordinate elevations of temporary roads and paved areas with permanent roads and paved areas. 2. Prepare subgrade and install subbase and base for temporary roads and paved areas according to Division 2 Section "Earthwork." 3. Recondition base after temporary use, including removing contaminated material, regrading, proofrolling, compacting, and testing. 4. Delay installation of final course of permanent hot-mix asphalt pavement until immediately before Substantial Completion. Repair hot-mix asphalt base-course pavement before installation of final course according to Division 2 Section "Hot- Mix Asphalt Paving." D. _ Traffic Controls: Comply with requirements of authorities having jurisdiction. 1. Protect existing site improvements to remain including curbs, pavement, and utilities. 2. Maintain access for fire-fighting equipment and access to fire hydrants. E. Parking: Provide temporary parking areas for construction personnel. F. Dewatering Facilities and Drains: Comply with requirements of authorities having © jurisdiction. Maintain Project site, excavations, and construction free of water. 1. Dispose of rainwater in a lawful manner that will not result in flooding Project or adjoining properties nor endanger permanent Work or temporary facilities. 2. Remove snow and ice as required to minimize accumulations. G. Project Identification and Temporary Signs: Provide Project identification and other signs as indicated in Contract Documents. Install signs where indicated to inform public and individuals seeking entrance to Project. Unauthorized signs are not permitted. 1. Provide temporary, directional signs for construction personnel and visitors. 2. Maintain and touchup signs so they are legible at all times. H. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction. Comply with Division | Section "Execution Requirements" for progress cleaning requirements. I. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel. @ 1. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and not temporary facilities. TEMPORARY FACILITIES AND CONTROLS OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013 01500-6 SECTION 01500 TEMPORARY FACILITIES AND CONTROLS 3.4 A. H. SECURITY AND PROTECTION FACILITIES INSTALLATION Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects. Temporary Erosion and Sedimentation Control: Provide measures to prevent soil erosion and discharge of soil-bearing

Download this text file with its original spacing ↓