READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — February 18, 2014 — Underground Electric Manhole — reading text
Part 24 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 97-Underground Electric Manhole.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Boulevard, Suite 300, Fort Walton Beach, FL 32547 on
September 25, 2013 at 10:00 AM. Representatives of OWNER and ENGINEER will be
present to discuss the Project. Bidders are required to attend and participate in the
conference in order to submit a bid. Once the conference is called to order, no additional
bidders will be allowed to sign-in and hence, to be allowed to bid. ENGINEER will
transmit to all prospective Bidders of record such Addenda as ENGINEER considers
necessary to response to questions arising at the conference. Oral statements may not be
relied upon and will not be binding or legally effective.
ARTICLE 6 - SITE AND OTHER AREAS
INSTRUCTIONS TO BIDDERS
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00100-4
SECTION 00100 Russell Stephenson - Electrical Manhole Rehabilitation
INSTRUCTIONS TO BIDDER
6.01
The Site is identified in the Bidding Documents. All additional lands and access thereto
required for temporary construction facilities, construction equipment, or storage of
materials and equipment, to be incorporated into the Work are to be obtained and paid for
by CONTRACTOR. Easements for permanent structures or permanent changes in
existing facilities are to be obtained and paid for by OWNER unless otherwise provided
in the Bidding Documents.
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
7.01
7.02
All questions about the meaning or intent of the Bidding Documents are to be submitted
to ENGINEER in writing. Interpretations or clarifications considered necessary by
ENGINEER in response to such questions will be issued by Addenda mailed or delivered
to all parties recorded by ENGINEER as having received the Bidding Documents.
Questions received less than ten days prior to the date for opening of Bids may not be
answered. Only questions answered by Addenda will be binding. Oral and other
interpretations or clarifications will be without legal effect.
Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed
advisable by OWNER or ENGINEER.
ARTICLE 8 - BID SECURITY
8.01
8.02
8.03
A Bid must be accompanied by Bid security made payable to OWNER in an amount of
five percent (5%) of Bidder's total Bid price and in the form of a cashier's check or a Bid
Bond on the form attached issued by a surety meeting the requirements of paragraphs
5.01 and 5.02 of the General Conditions.
The Bid security of the Successful Bidder will be retained until such Bidder has executed
the Contract Documents, furnished the required contract security and met the other
conditions of the Notice of Award, whereupon the Bid security will be returned. If the
Successful Bidder fails to execute and deliver the Contract Documents and furnish the
required contract security within 15 days after the Notice of Award, OWNER may annul
the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid
security of other Bidders whom OWNER believes to have a reasonable chance of
receiving the award may be retained by OWNER until the earlier of 7 days after the
effective date of the Agreement or 36 days after the bid opening whereupon Bid security
furnished by such Bidder will be returned.
Bid security of other Bidders whom OWNER believes do not have a reasonable chance
of receiving the award will be returned within seven days after the Bid opening.
ARTICLE 9 - CONTRACT TIMES
(Refer to Section 00500, Article 4)
ARTICLE 10 - LIQUIDATED DAMAGES
(Refer to Section 00500, Article 4)
INSTRUCTIONS TO BIDDERS
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00100-5
SECTION 00100 Russell Stephenson - Electrical Manhole Rehabilitation
INSTRUCTIONS TO BIDDER
ARTICLE 11 - SUBSTITUTE AND "OR-EQUAL" ITEMS
11.01
The Contract, if awarded, will be on the basis of materials and equipment specified or
described in the Bidding Documents. Whenever it is specified or described in the Bidding
Documents that a substitute or "approved equal" item of material or equipment may be
furnished or used by CONTRACTOR if acceptable to ENGINEER, and the
CONTRACTOR intends to use a substitute or "approved equal,” two copies of any
documentation required in the Specifications shall be submitted to the ENGINEER no
later than 2 weeks prior to bid opening. The procedure for submission of any such
application by CONTRACTOR and consideration by ENGINEER is set forth in the
General Conditions and may be supplement in the General Requirements.
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01
12.02
12.03
If OWNER requests the identity of certain Subcontractors, Suppliers, individuals, or
entities to be submitted to OWNER in advance of the Effective Date of the Agreement as
provided for in paragraph 6.06.B.(1) of the Supplementary Conditions, the apparent
Successful Bidder, and any other Bidder so requested, shall within 7 days after receipt of
a written request from the OWNER or the ENGINEER, submit to OWNER a list of all
such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the
Work for which such identification is required. Such list shall be accompanied by an
experience statement with pertinent information regarding similar projects and other
evidence of qualification for each such Subcontractor, Supplier, individual, or entity if
requested by OWNER. If OWNER or ENGINEER, after due investigation, has
reasonable objection to any proposed Subcontractor, Supplier, individual, or entity,
OWNER may, before the Notice of Award is given, request apparent Successful Bidder
to submit a substitute, in which case apparent Successful Bidder shall submit an
acceptable substitute, Bidder's Bid price will be increased (or decreased) by the
difference in cost occasioned by such substitution, and OWNER may consider such price
adjustment in evaluating Bids and making the contract award.
If apparent Successful Bidder declines to make any such substitution, OWNER may
award the Contract to the next lowest Bidder that proposes to use acceptable
Subcontractors, Suppliers, individuals, or entities. Declining to make requested
substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder.
Any Subcontractor, Supplier, individual, or entity so listed and against which OWNER or
ENGINEER makes no written objection prior to the giving of the Notice of Award will
be deemed acceptable to OWNER and ENGINEER subject to revocation of such
acceptance after the Effective Date of the Agreement as provided in paragraph 6.06 of the
General Conditions.
CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual,
or entity against whom CONTRACTOR has reasonable objection.
ARTICLE 13 - PREPARATION OF BID
INSTRUCTIONS TO BIDDERS
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00100-6
SECTION 00100 Russell Stephenson - Electrical Manhole Rehabilitation
INSTRUCTIONS TO BIDDER
13.01
A bid form is included with the Bidding Documents. Additional copies may be obtained
from the ENGINEER. The Bidder shall submit an original and two (2) copies of the bid
form.
All blanks on the Bid form shall be completed by printing in ink or by typewriter and the
Bid signed. A Bid price shall be indicated for each section, Bid item, alternative,
adjustment unit price item listed therein, or the words “No Bid”, “No Change”, or “Not
Applicable” entered.
A Bid by a corporation shall be executed in the corporate name by the president or a vice-
president or other corporate officer who has legal authority to sign. The corporate seal
shall be affixed and attested by the secretary or an assistant secretary. The corporate
address and state of incorporation shall be shown below the signature.
A Bid by a partnership shall be executed in the partnership name and signed by a partner
(whose title must appear under the signature). The official address of the partnership shall
be shown below the signature.
A Bid by a limited liability company shall be executed in the name of the firm by a
member and accompanied by evidence of authority to sign. The state of formation of the
firm and the official address of the firm must be shown below the signature.
A Bid by an individual shall show the Bidder's name and official address.
A Bid by a joint venture shall be executed by each joint venturer in the manner indicated
on the Bid form. The official address of the joint venture must be shown below the
signature.
All names shall be typed or printed in ink below the signature.
The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of
which shall be filled in on the Bid form.
The address and telephone number for communications regarding the Bid shall be shown.
If the Bidder is an out-of-state corporation, the Bid shall contain evidence of Bidder's
authority and qualification to do business as an out-of-state corporation in the State of
Florida in accordance with Article 3. Bidder's state contractor license number for the
State of Florida shall also be shown on the Bid form. Contractor shall be licensed in
accordance with the requirements of Chapter 489 of the Florida Statues.
ARTICLE 14 - BASIS OF BID; EVALUATION OF BIDS
14.01
Lump Sum Price
A. Bidders shall submit a Bid on a Lump Sum basis for the work described by the
plans, specifications, and Summary of Work (Section 01010). The Lump Sum
INSTRUCTIONS TO BIDDERS
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00100-7
SECTION 00100 Russell Stephenson - Electrical Manhole Rehabilitation
INSTRUCTIONS TO BIDDER
shall be complete compensation for a complete and operating system described in
the Contract Documents.
14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and
profit on account of cash allowances, if any, named in the Contract Documents as
provided in paragraph 11.02 of the General Conditions.
14.03 When completion times are not set forth in the agreement but instead are to be specified
by the BIDDER, bid prices will be compared after adjusting for differences in the time
designated by Bidders for Substantial Completion. The adjusting amount will be
determined at the rate set forth in the Contract Documents for liquidated damages for
failing to achieve Substantial Completion for each day before or after the desired date
appearing in Article 9.
ARTICLE 15 - SUBMTTTAL OF BID
15.01 A Bid shall be submitted no later than the date and time prescribed and at the place
indicated in the advertisement or invitation to Bid and shall be enclosed in an opaque
sealed envelope plainly marked with the Project title (and, if applicable, the designated
portion of the Project for which the Bid is submitted), the name and address of the
Bidder, and shall be accompanied by the Bid security and other required documents. Ifa
Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall
be enclosed in a separate envelope plainly marked on the outside with the notation "BID
ENCLOSED." A mailed Bid shall be addressed to:
Clerk of Circuit Court
ATTN: Gary Stanford
302 N. Wilson St. #203
Crestview FL 32536
NOTE: _Crestview is Not A Next Day Delivery Site For Overnight Carriers.
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the
manner that a Bid must be executed and delivered to the place where Bids are to be submitted
prior to the date and time for the opening of Bids.
16.02 If within 24 hours after Bids are opened any Bidder files a duly signed written _ notice
with OWNER and promptly thereafter demonstrates to the reasonable satisfaction of
OWNER that there was a material and substantial mistake inthe preparation of its Bid, that
Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work
is rebid, that Bidder will be disqualified from 1) further bidding on the Work, and 2) doing
any work on the Contract, either as a subcontractor or in any other capacity.
INSTRUCTIONS TO BIDDERS
OKALOOSA COUNTY WATER