Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
independent testing
laboratory acceptable to the OWNER and the ENGINEER to perform all
inspections, tests, or approvals required by the Contract Documents except:
1. that costs incurred in connection with tests or inspections conducted
pursuant to paragraph 13.04.B of the General Conditions shall be paid as
provided in said paragraph 13.04.B; and
2. as otherwise specifically provided in the Contract Documents.
Supplement subparagraph 14.02.B.5 of the General Conditions as
follows:
In addition to reasons listed in G.C. 14.02.B.5.a through 14.02.B.5.d, the
ENGINEER may refuse to recommend the whole or any part of any payment to
the CONTRACTOR because liability for liquidated damages has been incurred
by the CONTRACTOR.
Supplement subparagraph 17.01 of the General Conditions as follows:
In addition to the provisions of paragraph 17.01 of the General Conditions,
written Notice to the CONTRACTOR shall be deemed to have been given if
delivered in person to the CONTRACTOR'S authorized representative on the
project site.
SUPPLEMENTARY CONDITIONS
OKALOOSA
COUNTY WATER AND SEWER DATE: 8/15/2013
00800-7
SECTION 00800 Russell Stephenson - Electrical Manhole Rehabilitation
SUPPLEMENTARY CONDITIONS
END OF SECTION 00800
SUPPLEMENTARY CONDITIONS
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00800-8
SECTION 00810 Russell Stephenson - Electrical Manhole Rehabilitation
SPECIAL CONDITIONS
SECTION 00810 - SPECIAL CONDITIONS ®
1. INSPECTION OF FACILITIES
The CONTRACTOR shall at all times provide access to, and all means necessary to provide
for inspection of all parts of the work by the OWNER.
2. UTILITIES
The CONTRACTOR shall be responsible for any damage done by him or any of his
subcontractors to all utilities within the limits of the work. Should any utilities or
appurtenances be damaged by the CONTRACTOR's activities and operations under this
contract, the CONTRACTOR shall cause the necessary repairs to be made and shall pay the entire
cost thereof without compensation.
No separate compensation shall be allowed the CONTRACTOR for any work required by
this paragraph due to conflicts with lines and appurtenances or as a result of grade revisions.
3. REMOVAL OF DEBRIS
The CONTRACTOR shall frequently clean up all refuse, rubbish, scrap materials and debris
caused by his operations, so that at all times the site of the work shall present a neat, orderly @
and workmanlike appearance.
4. TEMPORARY ROADS, DETOURS AND MAINTENANCE OF ACCESS
A. No section of the work shall be closed to traffic unless approved by the OWNER.
Suitable signs indicating "Road Closed" or "Detour" shall be erected by the
CONTRACTOR as ordered by the OWNER at no expense to the OWNER.
B. If in the opinion of the OWNER the CONTRACTOR does not comply with the above
requirements such work as the OWNER may deem necessary may be performed by
others at the direction of the OWNER and the charges therefore held from any money
due or to become due to the CONTRACTOR on this or any other Contract.
5. BARRICADES, WARNING LIGHTS, SIGNS, ETC.
A. Prior to closing any section of the project to traffic, the CONTRACTOR shall furnish,
erect, and maintain, at no expense to the OWNER suitable barricades, warning signs,
flares, red flags, or lights which shall be kept burning from sunset to sunrise.
SPECIAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00810-1
SECTION 00810 Russell Stephenson - Electrical Manhole Rehabilitation
SPECIAL CONDITIONS
@ B. The CONTRACTOR shall receive no direct compensation for furnishing, erecting,
and maintaining the necessary barricades, lights, flares, signs, or for any other
incidentals necessary for the good and proper safety, convenience, and direction of
traffic during the period prior to final inspection and acceptance.
6. CONSTRUCTION ALONG AND UNDER HIGHWAYS
When Work is to be performed under Federal, State or County Highways, or along the right-
of-way of these highways, the CONTRACTOR is instructed to contact the State Highway
Department, the OWNER or other authorities concerned as to their requirements for Work of
this type and for maintaining traffic, detours and public safety during these operations. These
requirements shall be fully complied with and all work along or tnder these highways shall be
subject to the inspection and direction of the proper authorities concerned.
The CONTRACTOR shall give prior notice of his intention to perform work along these
highways and shall coordinate the work with the highway authorities concerned. The
CONTRACTOR shall provide at his own expense any bond or insurance required by the
Highway Department.
7. EXTRA CHARGES
r Upon receiving a change order or field order, the Contractor shall notify the Engineer of any
additional charges the Contractor feels he is due prior to initiating the work under
consideration.
8. CONTRACTOR'S CLOSEOUT SUBMITTALS TO ENGINEER
A. Upon final completion and acceptance of the Work in each Change Order, the
CONTRACTOR shall submit a final settlement of accounting to OWNER.
B. Statement shall reflect all adjustments to the Contract Price:
1. The Original Contract Price
2. Additions and deductions resulting from:
a. Previous Change Orders
b. Unit Prices
C. Deductions for uncorrected work
d. Penalties and Bonuses
€. Deductions for liquidated damages
f. Deductions for re-inspection payments
g. Other adjustments
SPECIAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00810-2
SECTION 00810
Russell Stephenson - Electrical Manhole Rehabilitation
SPECIAL CONDITIONS
*
3.
Total Change Order Sum, as adjusted
4, Previous Payments
5. Sum remaining due
C. OWNER will prepare a final change order, reflecting approval adjustments to the
Contract Price which were not previously made by Change Orders.
D. The CONTRACTOR shall submit the following closeout documentation along with
the final settlement of accounting:
1.
Release of Liens ~ The CONTRACTOR shall submit a certified letter from
the CONTRACTOR to release and discharge the OWNER, its officers, agents
and employees of and from all liabilities, obligations, and claims under or
arising out of said contract.
CONTRACTOR's Advertisement of Completion - The CONTRACTOR
immediately after being notified by the OWNER that all other requirements of
their contract as pertains to the Work Order have been completed shall give
notice of said completion by an advertisement for a period of 4 successive
weeks in the newspaper of largest circulation published within the county or
counties where the work is performed. Proof of publication of said notice shall
be made by the CONTRACTOR to the OWNER, by affidavit of the publisher
and a printed copy of the published notice. If no newspaper is published in any
county where the work is done, the notice may be given by posting at the
Court House for 30 days and proof of same shall be made by the Probate
Judge or Sheriff and the CONTRACTOR. Use the form for Advertisement of
Completion in Section.
In addition, the following documents will be required by the OWNER for Final
Contract Closeout review and Final Payment authorization:
e Signed Release of Lien
e Proof of Completion Advertisement
e Certificate of Insurance
e Consent of Surety to Final Payment
e Proof of Performance / Payment Bond 12 Month Continuance after
Final Payment
END OF SECTION 00810
SPECIAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00810-3
TABLE OF CONTETNT Russell Stephenson - Electrical Manhole Rehabilitation
TABLE OF CONTENT
Division Section Title Pages
PART 1-—BIDDING REQUIREMENTS (TO BE COMPLETED)
00080....000..... NOTICE TO BIDDERS ..0.o.oeceecccsessssssscssssesescscscscssee secscusvevesasvavacacsereesecsasavavaes 1-2
00100... INSTRUCTION TO BIDDERS o....eececscccccsssssscsessesescee scasscscsecevarsesaracsesecscscseeeenes 1-13
00300............ BID PROPOSAL .....cececcecsesseeesesesessesesecsesesssncssscscsavs seseassesessasatacvasassavavessssasees 1-13
00410... BID BOND 1... ccccssesesessscsssseseseseescsenessesesesecsessssescscsese scsevesesacessesavatstsavarsesesssesees 1-2
PART 2—CONTRACT FORMS (TO BE COMPLETED)
00500... EJCDC STANDARD CONTRACT FORM OF AGREEMENT. .....cccsccsescccecesceseeee 1-9
00610... PERFORMANCE BOND 000. ccecceccsesessssesesescecesesessce sesssassescssscsarsesavaacseveceesanars 1-4
00620... PAYMENT BOND ...0.. ccc eccccesceeeseseesesesessscesesesccscsces seassesesesavacsesavacscsavacsesesaseese 1-4
PART 3—CONDITIONS OF THE CONTRACT
00700... EJCDC GENERAL CONDITIONS ........cccccccscscssssssesee scsseevecsecsescacatsesatateacecsesavaes 1-46
00800............. SUPPLEMENTARY CONDITIONS .......cccccsescccsssssssse cocssesseceesevecaesessessseeusacscvenes 1-8
00810... SPECIAL CONDITIONS oo... ececccsessesessesescssrecsessesee ssesssecsessesesacatsateusapencsessesees 1-4
PART 4—SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
01010... SUMMARY OF WORK 0... ccccccesessssssesesescsscscscsscscsene sesvsseseesaracsaavsesesassesnecsececes 1-2
01250... CONTRACT MODIFICATION PROCEDURES. ...0..... coccsccssscsessessesescsteseacecsenseens 1-3
01270... MEASUREMENT & PAYMENT ........ccccccsssccssscsssscseee scsesecsevseesacasescsessevacsessseeses 1-2
01310... PROJECT MANAGEMENT AND COORDINATION oov..ccccececcsscscesesscescscsecesess 1-11
01320... CONSTRUCTION PROGRESS DOCUMENTATION. .u....cscccccscsccesceseescseescseeecees 1-8
0132200000. PHOTOGRAPHIC DOCUMENTATION ......c.ccccsccsssess sosssscsssccacsevasevacearseatsavanses 1-4
01324... CONTRACTORS SAFETY PLAN ......cccccccscsssssssscesssce scssssessscseeevsssesevassesecacsesasees 1-6
01330... SUBMITTAL S oo... cceccccsscsesescseeesessecesesesessesescscecscscsea sesssessssecsuvevasssaravarasserevseneas 1-2
01332... SHOP DRAWING PROCEDURES ......ccccccccssscesssscsesee ssssececsecsecessesssesscsavacecsesess 1-8
01400... QUALITY REQUIREMENTS ......eccccsesssscsessssescsessssee sesssavassesesseecaesesavstsesacateacaes 1-6
01500... TEMPORARY FACILITIES AND CONTROLS .00...0.. ceccecseseesessceceseeecesceseenessesees 1-11
01770... CLOSEOUT PROCEDURE ..0...eecccccscssssessssescescsscecee sessvecsevacsasacsatacaracuavateasseees 1-4
DIVISION 2 - SITE CONSTRUCTION
02240... DEWATERING... ceecescccsssecseecenteneseesessessneesesaceecsesa sesucscssvsesvacuevecsavsceacareaeensas 1-5
02260............. EXCAVATION SUPPORT... ecccsescsssssestseesesccscescsees sesscaccesssvecessscesesesaneressnees 1-6
TABLE OF CONTENT
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
1
TABLE OF CONTETNT Russell Stephenson - Electrical Manhole Rehabilitation
DIVISION 16 - ELECTRICAL
16010........... BASIC ELECTRICAL REQUIREMENTS ........c::ccceesee cereresseseeesreestsasersnneenenseeaees 1-6
16075... ELECTRICAL IDENTIFICATION .........ccccccecssssseseee cereerenreeeeeaseesersensneraaaenaenees 1-9
16120... CONDUCTORS AND CABLES ...... ese cccccccccseesesseteceeee censnenareseeeeeseneenenagacaaseseaees 1-8
16135... UNDERGROUND DUCTS ........cceecsesseeneceeceeeeeesensnnacene seeeesssaaceeeeseneenertsnernaagoneagens 1-24
END OF SECTION
TABLE OF CONTENT
OKALOOSA COUNTY WATER AND SEWER
2
ae
DATE: 8/15/2013
SECTION 00080 Russell Stephenson - Electrical Manhole Rehabilitation
NOTICE TO BIDDERS
SECTION 00080 — NOTICE TO BIDDERS
Board of County Commissioners
Okaloosa County, Florida
OWNER
Separate sealed bids for the Russell Stephenson Electrical Manhole Rehabilitation Project shall
be received by the Board of County Commissioners, Okaloosa County, Florida, in the
Conference & Training Room #305 located at 302 N. Wilson St, Crestview, FL 32536, until 3:05
pm local time on October 3, 2013 and then publicly opened and read aloud.
A mandatory pre-bid conference is scheduled for 10:00 am local time on, September 25, 2013 in
the 3 Floor Board Room of the Okaloosa County Water and Sewer Administrative Building,
located at 1804 Lewis Turner Blvd, Fort Walton Beach, Florida. You must attend this pre-bid
conference in order to submit a bid.
A hardcopy of bid