Okaloosa County BOCC — February 18, 2014 — Underground Electric Manhole — reading text
Part 20 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 97-Underground Electric Manhole.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
consecutive days by notice in writing to
CONTRACTOR and ENGINEER which will fix the date
on which Work will be resumed. CONTRACTOR shall
resume the Work on the date so fixed. CONTRACTOR
shall be allowed an adjustment in the Contract Price or an
extension of the Contract Times, or both, directly
attributable to any such suspension if CONTRACTOR
makes a Claim therefor as provided in paragraph 10.05.
15.02 OWNER May Terminate for Cause
A. The occurrence of any one or more of the
following events will justify termination for cause:
1. CONTRACTOR’s persistent failure to per-
form the Work in accordance with the Contract
Documents (including, but not limited to, failure to
supply sufficient skilled workers or suitable materials
or equipment or failure to adhere to the progress
schedule established under paragraph 2.07 as
adjusted from time to time pursuant to paragraph
6.04);
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-42
SECTION 00700
GENERAL CONDITIONS
2. CONTRACTOR’s disregard of Laws or
Regulations of any public body having jurisdiction;
3. CONTRACTOR’s disregard of the authori-
ty of ENGINEER; or
4. CONTRACTOR’s violation in any
substantial way of any provisions of the Contract
Documents.
B. If one or more of the events identified in
paragraph 15.02.A occur, OWNER may, after giving
CONTRACTOR (and the surety, if any) seven days
written notice, terminate the services of CONTRACTOR,
exclude CONTRACTOR from the Site, and take
possession of the Work and of all CONTRACTOR’s
tools, appliances, construction equipment, and machinery
at the Site, and use the same to the full extent they could
be used by CONTRACTOR (without liability to
CONTRACTOR for trespass or conversion), incorporate
in the Work all materials and equipment stored at the Site
or for which OWNER has paid CONTRACTOR but
which are stored elsewhere, and finish the Work as
OWNER may deem expedient. In such case,
CONTRACTOR shall not be entitled to receive any
further payment until the Work is finished. Ifthe unpaid
balance of the Contract Price exceeds all claims, costs,
losses, and damages (including but not limited to all fees
and charges of engineers, architects, attorneys, and other
professionals and all court or arbitration or other dispute
resolution costs) sustained by OWNER arising out of or
relating to completing the Work, such excess will be paid
to CONTRACTOR. If such claims, costs, losses, and
damages exceed such unpaid balance, CONTRACTOR
shall pay the difference to OWNER. Such claims, costs,
losses, and damages incurred by OWNER will be
reviewed by ENGINEER as to their reasonableness and,
when so approved by ENGINEER, incorporated in a
Change Order. When exercising any rights or remedies
under this paragraph OWNER shall not be required to
obtain the lowest price for the Work performed.
C. Where CONTRACTOR’s services have been so
terminated by OWNER, the termination will not affect
any rights or remedies of OWNER against
CONTRACTOR then existing or which may thereafter
accrue, Any retention or payment of moneys due
CONTRACTOR by OWNER will not release
CONTRACTOR from liability.
15.03 OWNER May Terminate For Convenience
Russell Stephenson — Electrical Manhole Rehabilitation
A. Upon seven days written notice to
CONTRACTOR and ENGINEER, OWNER may,
without cause and without prejudice to any other right or
remedy of OWNER, elect to terminate the Contract. In
such case, CONTRACTOR shall be paid (without
duplication of any items):
1. for completed and acceptable Work executed
in accordance with the Contract Documents prior to
the effective date of termination, including fair and
reasonable sums for overhead and profit on such
Work;
2. for expenses sustained prior to the effective
date of termination in performing services and fur-
nishing labor, materials, or equipment as required by
the Contract Documents in connection with uncom-
pleted Work, plus fair and reasonable sums for
overhead and profit on such expenses;
3. for all claims, costs, losses, and damages
(including but not limited to all fees and charges of
engineers, architects, attorneys, and other
professionals and all court or arbitration or other
dispute resolution costs) incurred in settlement of
terminated contracts with Subcontractors, Suppliers,
and others; and
4. for reasonable expenses directly attributable
to termination.
B. CONTRACTOR shall not be paid on account of
loss of anticipated profits or revenue or other economic
loss arising out of or resulting from such termination.
15.04 CONTRACTOR May Stop Work or Terminate
A. If, through no act or fault of CONTRACTOR, the
Work is suspended for more than 90 consecutive days by
OWNER or under an order of court or other public
authority, or ENGINEER fails to act on any Application
for Payment within 30 days after it is submitted, or
OWNER fails for 30 days to pay CONTRACTOR any
sum finally determined to be due, then CONTRACTOR
may, upon seven days written notice to OWNER and
ENGINEER, and provided OWNER or ENGINEER do
not remedy such suspension or failure within that time,
terminate the Contract and recover from OWNER
payment on the same terms as provided in paragraph
15.03. In lieu of terminating the Contract and without
prejudice to any other right or remedy, if ENGINEER has
failed to act on an Application for Payment within 30
days after it is submitted, or OWNER has failed for 30
days to pay CONTRACTOR any sum finally determined
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-43
SECTION 00700
GENERAL CONDITIONS
to be due, CONTRACTOR may, seven days after written
notice to OWNER and ENGINEER, stop the Work until
payment is made of all such amounts due
CONTRACTOR, including interest thereon. The provi-
sions of this paragraph 15.04 are not intended to preclude
CONTRACTOR from making a Claim under paragraph
10.05 for an adjustment in Contract Price or Contract
Times or otherwise for expenses or damage directly
attributable to CONTRACTOR’s stopping the Work as
permitted by this paragraph.
ARTICLE 16 - DISPUTE RESOLUTION
16.01 Methods and Procedures
A. Dispute resolution methods and procedures, if
any, shall be as set forth in the Supplementary
Conditions. If no method and procedure has been set
forth, and subject to the provisions of paragraphs 9.09
and 10.05, OWNER and CONTRACTOR may exercise
such rights or remedies as either may otherwise have
under the Contract Documents or by Laws or Regulations
in respect of any dispute.
ARTICLE 17 - MISCELLANEOUS
17.01 Giving Notice
A. Whenever any provision of the Contract
Documents requires the giving of written notice, it will be
deemed to have been validly given if delivered in person
to the individual or to a member of the firm or to an
officer of the corporation for whom it is intended, or if
delivered at or sent by registered or certified mail,
postage prepaid, to the last business address known to the
giver of the notice.
17.02 Computation of Times
A. When any period of time is referred to in the
Contract Documents by days, it will be computed to
exclude the first and include the last day of such period. If
the last day of any such period falls on a Saturday or
Russell Stephenson — Electrical Manhole Rehabilitation
Sunday or on a day made a legal holiday by the law of the
applicable jurisdiction, such day will be omitted from the
computation.
17.03 Cumulative Remedies
A. The duties and obligations imposed by these
General Conditions and the rights and remedies available
hereunder to the parties hereto are in addition to, and are
not to be construed in any way as a limitation of, any
rights and remedies available to any or all ofthem which
are otherwise imposed or available by Laws or Regula-
tions, by special warranty or guarantee, or by other
provisions of the Contract Documents, and the provisions
of this paragraph will be as effective as if repeated
specifically in the Contract Documents in connection with
each particular duty, obligation, right, and remedy to
which they apply.
17.04 Survival of Obligations
A. All representations, indemnifications, warranties,
and guarantees made in, required by, or given in accor-
dance with the Contract Documents, as well as all
continuing obligations indicated in the Contract Docu-
ments, will survive final payment, completion, and
acceptance of the Work or termination or completion of
the Agreement.
17.05 Controlling Law
A. This Contract is to be governed by the law of the
state in which the Project is located.
17.06 Headings
A. The Article and paragraph headings are inserted
for convenience only and do not constitute part of these
General Conditions.
END OF SECTION 00700
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-44
Yd SECTION 00700 Russell Stephenson — Electrical Manhole Rehabilitation
GENERAL CONDITIONS
(THIS PAGE INTENTIONALLY LEFT BLANK)
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER DATE: 5/13/2012
00700-45
SECTION 00800 Russell Stephenson - Electrical Manhole Rehabilitation
SUPPLEMENTARY CONDITIONS
SECTION 00800 — SUPPLEMENTARY CONDITIONS
Supplementary Conditions amend or supplement the Standard General Conditions of the
Construction Contract (No. 1910-8, 1996 ed.) and other provisions of the Contract Documents as
indicated below. All provisions which are not so amended or supplemented remain in full force
and effect.
The terms used in these Supplementary Conditions have the meanings assigned to them in the
General Conditions. Additional terms used in these Supplementary Conditions have the
meanings indicated below, which are applicable to both the singular and plural thereof.
SC-2.02. Delete paragraph 2.02 of the General Conditions in its entirety and insert the
following in its place:
2.02. OWNER shall furnish to CONTRACTOR up to four (4) copies of the Contract
Documents as are reasonably necessary for the execution of the Work. Additional
copies will be furnished, upon request, at the cost of reproduction.
SC-2.04. Delete paragraph 2.04 of the General Conditions in its entirety and insert the
following in its place:
2.04. CONTRACTOR shall start to perform the Work on the date when the Contract Time
commences to run, but no Work shall be done at the site prior to the Effective Date
of the Agreement.
SC-2.05.C. Delete paragraph 2.05. C of the General Conditions in its entirety and insert the
following in its place:
2.05.C. The CONTRACTOR shall furnish the OWNER with five copies of Certificates of
Insurance on all required policies of insurance showing limits of liability as
specified. All policies must provide 30 days advance notice to the OWNER in the
event of cancellation, expiration or alteration. Each certificate shall be accompanied
by a notarized statement itemizing each and every exclusion of the policy. All
certificates shall be submitted with the Agreement for execution.
SC-2.06. Delete paragraph 2.06 of the General Conditions in its entirety and insert the
following in its place:
2.06. Within twenty (20) days after the Effective Date of the Agreement, a conference
attended by CONTRACTOR, OWNER and others as appropriate may be held to
establish a working understanding among the parties as to the work and to discuss
the schedules referred to in paragraph 2.05.B of the General Conditions, procedures
for handling Shop Drawings and other submittals, processing Applications for
Payment, and maintaining required records.
SUPPLEMENTARY CONDITIONS
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00800-1
SECTION 00800 Russell Stephenson - Electrical Manhole Rehabilitation
SUPPLEMENTARY CONDITIONS
SC-2.07.
2.07.
SC-5.01.
Delete paragraph 2.07 of the General Conditions in its entirety and insert the
following in its place:
If requested by the OWNER or ENGINEER, at least ten (10) days before
submission of the first Application for Payment a conference attended by
CONTRACTOR, OWNER and others as appropriate will be held to review for