amounts
determined pursuant to paragraphs 5.01.A below:
A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto in
r Section 00300, Bid Proposal.
B. As provided in paragraph 11.03 of the General Conditions, estimated quantities
are not guaranteed, and determinations of actual quantities and classifications are
to be made by OWNER as provided in paragraph 9.08 of the General Conditions.
Unit prices have been computed as provided in paragraph 11.03 of the General
Conditions.
ARTICLE 6 — PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments:
A. CONTRACTOR shall submit Applications for Payment in accordance with
Article 14 of the General Conditions. Applications for Payment will be processed
by ENGINEER as provided in the General Conditions.
6.02 Progress Payments; Retainage:
A. OWNER shall make progress payments on account of the Contract Price on the
basis of CONTRACTOR'S Applications for Payment on or about the 10th day of
each month during performance of the work as provided in Paragraphs 6.02.A.1
@ and 6.02.A.2 below. All such payments will be measured by the schedule of
STANDARD AGREEMENT
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00500 - 3
EEE <<———__ ee
SECTION 00500 Russell Stephenson - Electrical Manhole Rehabilitation
STANDARD AGREEMENT
values established in paragraph 2.07. A of the General Conditions (and in the case
r of Unit Price Work based on the number of units completed) or, in the event there
is no schedule of values, as provided in the General Requirements.
1. Prior to Substantial Completion, progress payments will be made in an
amount equal to the percentage indicated below, but, in each case, less the
aggregate of payments previously made and less such amounts as
ENGINEER shall determine, or OWNER may withhold, in accordance
with paragraph 14.02 of the General Conditions.
a. Ninety percent (90%) of Work completed (with the balance being
retainage). If Work has been 50 percent completed as determined
by ENGINEER, and if the character and progress of the Work have
been satisfactory to OWNER and ENGINEER, OWNER on
recommendation of ENGINEER, may determine that as long as the
character and progress of the Work remain satisfactory to them,
there will be no retainage on account of Work subsequently
completed, in which case the remaining progress payments prior to
Substantial Completion will be in an amount equal to 100% of the
Work completed less the aggregate of payments previously made;
and
b. Ninety percent of cost of materials and equipment not incorporated
r in the Work (with the balance being retainage).
2. Upon Substantial Completion, OWNER shall pay an amount sufficient to
increase total payments to CONTRACTOR to ninety-eight percent (98%)
of the Work completed, less such amounts as ENGINEER shall determine
in accordance with paragraph 14.02.B.5 of the General Conditions and
less 100% of ENGINEER's estimate of the value of Work to be completed
or corrected as shown on the tentative list of items to be completed or
corrected attached to the certificate of Substantial Completion.
6.03 Final Payment:
A. Upon final completion and acceptance of the Work in accordance with paragraph
14.07 of the General Conditions, OWNER shall pay the remainder of the Contract
Price as recommended by ENGINEER as provided in said paragraph 14.07.
ARTICLE 7 — INTEREST |
7.01 All moneys not paid when due as provided in Article 14 of the General Conditions shall b
ear interest at the rate of 12 percent per annum.
STANDARD AGREEMENT
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00500 - 4
SECTION 00500 Russell Stephenson - Electrical Manhole Rehabilitation
STANDARD AGREEMENT
ARTICLE 8 — CONTRACTOR'S REPRESENTATIONS
8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the
following representations:
A. CONTRACTOR has examined and carefully studied the Contract Documents and
the other related data identified in the Bidding Documents.
B. CONTRACTOR has visited the site and become familiar with and is satisfied as
to the general, local and site conditions that may affect cost, progress,
performance of the Work.
C. CONTRACTOR is familiar with and is satisfied as to all federal, state and local
Laws and Regulations that may affect cost, progress, performance of the Work.
D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of
subsurface conditions at or contiguous to the site and all drawings of physical
conditions in or relating to existing surface or subsurface structures at or
contiguous to the site (except Underground Facilities) which have been identified
in the Supplementary Conditions as provided in paragraph 4.02 of the General
Conditions and (2) reports and drawings of a Hazardous Environmental
Condition, if any, at the site which has been identified in the Supplementary
Conditions as provided in paragraph 4.06 of the General Conditions.
E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for
having done so) all additional or supplementary examinations, investigations,
explorations, tests, studies, and data concerning conditions (surface, subsurface,
and Underground Facilities) at or contiguous to the Site which may affect cost,
progress, or performance of the Work or which relate to any aspect of the means,
methods, techniques, sequences, and procedures of construction to be employed
by CONTRACTOR, including applying the specific means, methods, techniques,
sequences, and procedures of construction, if any, expressly required by the
Contract Documents to be employed by CONTRACTOR, and safety precautions
and programs incident thereto
F, CONTRACTOR does not consider that any further examinations, investigations,
tests, studies, or data are necessary for the performance of the Work at the
Contract Price, within the Contract Times, and in accordance with the other terms
and conditions of the Contract Documents.
G. CONTRACTOR is aware of the general nature of work to be performed by
OWNER and others at the site that relates to the Work as indicated in the Contract
Documents.
STANDARD AGREEMENT
OKALOOSA COUNTY WATER AND SEWER
DATE: 8/1
00500 - 5 5/2013
EES S=SS::’2zé== oe —————
SECTION 00500 Russell Stephenson - Electrical Manhole Rehabilitation
STANDARD AGREEMENT
H. CONTRACTOR has correlated the information known to CONTRACTOR,
information and observations obtained from visits to the site, reports and
drawings identified in the Contract Documents and all additional examinations,
investigations, explorations, tests, studies, and data with the Contract Documents.
I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors,
ambiguities or discrepancies that CONTRACTOR has discovered in the Contract
Documents ‘and the written resolution thereof by ENGINEER is acceptable to
CONTRACTOR
J. The Contract Documents are generally sufficient to indicate and convey
understanding of all terms and conditions for performance and furnishing of the
Work.
ARTICLE 9 — CONTRACT DOCUMENTS
9.01 Contents:
A. The Contract Documents consist of the following:
1. This Agreement.
2. Performance Bond.
3. Payment Bond.
4. Other Bonds.
5. General Conditions.
6. Supplementary Conditions.
7. Specifications as listed in the table of contents of the Contract Documents.
8. Addenda.
9. Exhibits to this Agreement (enumerated as follows):
a. Notice to Proceed.
b. CONTRACTOR'S Bid.
c. Documentation submitted by CONTRACTOR prior to Notice of |
Award |
10. The following which may be delivered or issued after the Effective Date
STANDARD AGREEMENT
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00500 - 6
SECTION 00500 Russell Stephenson - Electrical Manhole Rehabilitation
STANDARD AGREEMENT
of the Agreement and are not attached hereto:
a. Written Amendments;
b. Work Change Directives;
c. Change Order(s).
B. The Documents listed in paragraph 9.01.A are attached to this Agreement (except
as expressly noted otherwise above).
C. The Contract Documents may only be amended, modified, or supplemental as
provided in paragraph 3.04 of the General Conditions.
ARTICLE 10 — MISCELLANEOUS
10.01 Terms:
10.02 Assignment of Contract:
A. No assignment by a party hereto of any rights or interests in the Contract will be
binding on another party hereto without the written consent of the party sought to
be bound; and, specifically but without limitation, moneys that may become due
and moneys that are due may not be assigned without such consent (except to the
extent that the effect of this restriction may be limited by law), and unless
specifically stated to the contrary in any written consent to an assignment, no
assignment will release or discharge the assignor from any duty or responsibility
under the Contract Documents.
10.03 Successors and Assigns:
A. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns
and legal representatives to the other party hereto, its partners, successors, assigns
and legal representatives in respect of all covenants, agreements and obligations
contained in the Contract Documents.
10.04 Severability:
A. Any provision or part of the Contract Documents held to be void or unenforceable
under any Law or Regulation shall be deemed stricken, and all remaining
provisions shall continue to be valid and binding upon OWNER and
CONTRACTOR, who agree that the Contract Documents shall be reformed to
replace such stricken provision or part thereof with a valid and enforceable
provision that conies as close as possible to expressing the intention of the
stricken provision.
STANDARD AGREEMENT
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00500 - 7
SECTION 00500
STANDARD AGREEMENT
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in
triplicate. One counterpart each has been delivered to OWNER, CONTRACTOR and
ENGINEER. All portions of the Contract Documents have been signed or identified by OWNER
and CONTRACTOR or on their behalf.
Russell Stephenson - Electrical Manhole Rehabilitation
This Agreement will be effective on
, 2014 (which is the Effective
By: Don Amunds [Seal]
Attest
Date of the Agreement).
OWNER CONTRACTOR
BOARD OF COUNTY COMMISSIONER Pt? Smtth Electric, Inc (4p
OKALOOSA COUNTY
™
BilY Smith ,7Presideht
By: [Corporate Seal]
Attest
302 N. Wilson Street #203
f Crestview, FL 32536
Address for giving notices:
Designated Representative:
e224 biiLe
Bi Smith Electri
PO soe 1057 te (/ )
Gonzalez, FL 32560
License No. EC0003007
(Where Applicable)
Name:
Title: Agent for Service of Process:
Address:
Phone: Designated Representative:
Facsimile: Name:
Title:
Address:
Phone:
Facsimile:
END OF SECTION 00500
STANDARD AGREEMENT
OKALOOSA COUNTY WATER AND SEWER DATE: 8/15/2013
00500 - 8
SECTION 00610 Russell Stephenson - Electrical Manhole Rehabilitation
PERFORMANCE BOND
SECTION 00610 - PERFORMANCE BOND 2ond No. 40098835
KNOW ALL MEN BY THESE PRESENTS: That we (1)_ Bill Smith Electric, inc. a (2)
Corporation hereinafter called "Principal" and
3 The Guarantee Company of North America USA
of One Towne Square, Suite 1470 State of
MI hereinafter called the "Surety", are held and firmly bound
unto (4) Board of County Commissioners, Okaloosa County, Florida hereinafter called
"OWNER", in the penal sum of _ Two hundred one thousand- two hundred seven __dollars __and
00/100. ($201,207.00) in lawful money of the United States for the payment of which sum well and
truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and
severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a
certain contract with the OWNER, dated the day of , 2014 , a copy of
which is hereto attached and made a part hereof for the construction of:
Russell Stephenson - Electrical Manhole Rehabilitation Project
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the
undertakings,