READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — February 18, 2014 — Underground Electric Manhole — reading text
Part 14 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 97-Underground Electric Manhole.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
them may
be liable, regardless of whether or not caused in part
by an individual or entity indemnified hereunder or
whether liability is imposed upon such indemnified
party by Laws or Regulations.
B. In any and all claims against OWNER or
ENGINEER or any of their respective consultants,
agents, officers, directors, partners, or employees by any
employee (or the survivor or personal representative of
such employee) of CONTRACTOR, any Subcontractor,
any Supplier, or any individual or entity directly or
indirectly employed by any of them to perform any of the
Work, or anyone for whose acts any of them may be
liable, the indemnification obligation under paragraph
6.20.A shall not be limited in any way by any limitation
on the amount or type of damages, compensation, or
benefits payable by or for CONTRACTOR or any such
Subcontractor, Supplier, or other individual or entity
under workers’ compensation acts, disability benefit acts,
or other employee benefit acts.
C. The indemnification obligations of
CONTRACTOR under paragraph 6.20.A shall not be
limited in any way by the amount or types of insurance
provided by CONTRACTOR under Article 5 of the
General Conditions.
D. The indemnification obligations of
CONTRACTOR under paragraph 6.20.A shall not
extend to the sole negligence or willful misconduct of
OWNER, ENGINEER or ENGINEER’s Consultants or
to the officers, directors, partners, employees, agents, and
other consultants and subcontractors of each and any of
them.
6.21 Delegation of Professional Design Services
A. CONTRACTOR will not be required to provide
professional design services unless such services are
specifically required by the Contract Documents for a
portion of the Work or unless such services are required
to carry out CONTRACTOR’s responsibilities for
construction means, methods, techniques, sequences and
procedures. CONTRACTOR shall not be required to
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-26
SECTION 00700
GENERAL CONDITIONS
provide professional services in violation of applicable
law.
B. Ifprofessional design services or certification by
a design professional related to systems, materials or
equipment are specifically required of CONTRACTOR
by the Contract Documents, OWNER and ENGINEER
will specify all performance and design criteria that such
services must satisfy. CONTRACTOR shall cause such
services or certifications to be provided by a properly
licensed professional, whose signature and seal shall
appear on all drawings, calculations, specifications,
certifications, Shop Drawings and other submittals
prepared by such professional. Shop Drawings and other
submittals related to the Work designed or certified by
such professional, if prepared by others, shall bear such
professional’s written approval when submitted to
ENGINEER.
C. OWNER and ENGINEER shall be entitled to
rely upon the adequacy, accuracy and completeness of the
services, certifications or approvals performed by such
design professionals, provided OWNER and ENGINEER
have specified to CONTRACTOR all performance and
design criteria that such services must satisfy.
D. Pursuant to this Paragraph 6.21, ENGINEER’s
review and approval of design calculations and design
drawings will be only for the limited purpose of checking
for conformance with performance and design criteria
given and the design concept expressed in the Contract
Documents. ENGINEER’s review and approval of Shop
Drawings and other submittals (except design
calculations and design drawings) will be only for the
purpose stated in Paragraph 6.17.E.1.
E. CONTRACTOR shall not be responsible for the
adequacy of the performance or design criteria required
by the Contract Documents.
ARTICLE 7 - OTHER WORK
7.01 Related Work at Site
A. OWNER may perform other work related to the
Project at the Site by OWNER’s employees, or let other
direct contracts therefor, or have other work performed
by utility owners. If such other work is not noted in the
Contract Documents, then:
Russell Stephenson — Electrical Manhole Rehabilitation
1. written notice thereof will be given to
CONTRACTOR prior to starting any such other
work; and
2. ifOWNER and CONTRACTOR are unable
to agree on entitlement to or on the amount or extent,
if any, of any adjustment in the Contract Price or
Contract Times that should be allowed as a result of
such other work, a Claim may be made therefor as
provided in paragraph 10.05.
B. CONTRACTOR shall afford each other
contractor who is a party to such a direct contract and
each utility owner (and OWNER, if OWNER is per-
forming the other work with OWNER’s employees)
proper and safe access to the Site and a reasonable
opportunity for the introduction and storage of materials
and equipment and the execution of such other work and
shall properly coordinate the Work with theirs. Unless
otherwise provided in the Contract Documents, CON-
TRACTOR shall do all cutting, fitting, and patching of
the Work that may be required to properly connect or
otherwise make its several parts come together and
properly integrate with such other work. CON-
TRACTOR shall not endanger any work of others by
cutting, excavating, or otherwise altering their work and
will only cut or alter their work with the written consent
of ENGINEER and the others whose work will be affect-
ed. The duties and responsibilities of CONTRACTOR
under this paragraph are for the benefit of such utility
owners and other contractors to the extent that there are
comparable provisions for the benefit of CONTRACTOR
in said direct contracts between OWNER and such utility
owners and other contractors.
C. Ifthe proper execution or results of any part of
CONTRACTOR’ s Work depends upon work performed
by others under this Article 7, CONTRACTOR shall
inspect such other work and promptly report to
ENGINEER in writing any delays, defects, or deficien-
cies in such other work that render it unavailable or
unsuitable for the proper execution and results of
CONTRACTOR’s Work. CONTRACTOR’s failure to
so report will constitute an acceptance of such other work
as fit and proper for integration with CONTRACTOR’s
Work except for latent defects and deficiencies in such
other work.
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-27
SECTION 00700
GENERAL CONDITIONS
ARTICLE 8 - OWNER’S RESPONSIBILITIES
8.01 Communications to Contractor
A. Except as otherwise provided in these General
Conditions, OWNER shall issue all communications to
CONTRACTOR through ENGINEER.
8.02 Furnish Data
A. OWNER shall promptly furnish the data required
of OWNER under the Contract Documents.
8.03 Pay Promptly When Due
A. OWNER | shall make payments to
CONTRACTOR promptly when they are due as provided
in paragraphs 14.02.C and 14.07.C.
8.04 Lands and Easements; Reports and Tests
A. OWNER’s duties in respect of providing lands
and easements and providing engineering surveys to
establish reference points are set forth in paragraphs 4.01
and 4.05. Paragraph 4.02 refers to OWNER’s identifying
and making available to CONTRACTOR copies of
reports of explorations and tests of subsurface conditions
and drawings of physical conditions in or relating to
existing surface or subsurface structures at or contiguous
to the Site that have been utilized by ENGINEER in
preparing the Contract Documents.
8.05 Insurance
A. OWNER’s responsibilities, if any, in respect to
purchasing and maintaining liability and property insur-
ance are set forth in Article 5.
8.06 Change Orders
A. OWNER is obligated to execute Change Orders
as indicated in paragraph 10.03.
8.07 Inspections, Tests, and Approvals
A. OWNER’s responsibility in respect to certain
inspections, tests, and approvals is set forth in paragraph
13.03.B.
Russell Stephenson — Electrical Manhole Rehabilitation
8.08 Limitations on OWNER’s Responsibilities
A. The OWNER shall not supervise, direct, or have
control or authority over, nor be responsible for,
CONTRACTOR’s means, methods, techniques, se-
quences, or procedures of construction, or the safety
precautions and programs incident thereto, or for any
failure of CONTRACTOR to comply with Laws and
Regulations applicable to the performance of the Work.
OWNER will not be responsible for CONTRACTOR’s
failure to perform the Work in accordance with the
Contract Documents.
8.09 Undisclosed Hazardous — Environmental
Condition
A. OWNER’s responsibility in respect to an undis-
closed Hazardous Environmental Condition is set forth in
paragraph 4.06.
8.10 Evidence of Financial Arrangements
A. If and to the extent OWNER has agreed to
furnish CONTRACTOR reasonable evidence that
financial arrangements have been made to satisfy
OWNER’s obligations under the Contract Documents,
OWNER’ responsibility in respect thereof will be as set
forth in the Supplementary Conditions.
ARTICLE 9 - ENGINEER’S STATUS DURING
CONSTRUCTION
9.01 OWNER’s Representative
A. ENGINEER will be OWNER’s representative
during the construction period. The duties and responsi-
bilities and the limitations of authority of ENGINEER as
OWNER’s representative during construction are set
forth in the Contract Documents and will not be changed
without written consent of OWNER and ENGINEER.
9.02 Visits to Site
A. ENGINEER will make visits to the Site at inter-
vals appropriate to the various stages of construction as
ENGINEER deems necessary in order to observe as an
experienced and qualified design professional the
progress that has been made and the quality of the various
aspects of CONTRACTOR’s executed Work. Based on
information obtained during such visits and observations,
ENGINEER, for the benefit of OWNER, will determine,
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-28
SECTION 00700
GENERAL CONDITIONS
in general, if the Work is proceeding in accordance with
the Contract Documents. ENGINEER will not be
required to make exhaustive or continuous inspections
on the Site to check the quality or quantity of the Work.
ENGINEER’ efforts will be directed toward providing
for OWNER a greater degree of confidence that the
completed Work will conform generally to the Contract
Documents. On the basis of such visits and observations,
ENGINEER will keep OWNER informed ofthe progress
ofthe Work and will endeavor to guard OWNER against
defective Work.
B. ENGINEER’s visits and observations are subject
to all the limitations on ENGINEER’s authority and
responsibility set forth in paragraph 9.10, and particu-
larly, but without limitation, during or as a result of
ENGINEER's visits or observations of CONTRACTOR's
Work ENGINEER will not supervise, direct, control, or
have authority over or be responsible for
CONTRACTOR’s means, methods, techniques,
sequences, or procedures of construction, or the safety
precautions and programs incident thereto, or for any
failure of CONTRACTOR to comply with Laws and
Regulations applicable to the performance of the Work.
9.03 Project Representative
A. IfOWNER and ENGINEER agree, ENGINEER
will furnish a Resident Project Representative to assist
ENGINEER in providing more extensive observation of
the Work. The responsibilities and authority and limita-
tions thereon of any such Resident Project Representative
and assistants will be as provided in paragraph 9.10 and
in the Supplementary Conditions. If OWNER designates
another representative or agent to represent OWNER at
the Site who is not ENGINEER’s Consultant, agent or
employee, the responsibilities and authority and
limitations thereon of such other individual or entity will
be as provided in the Supplementary Conditions.
9.04 Clarifications and Interpretations
A. ENGINEER will issue with reasonable prompt-
ness such written clarifications or interpretations of the
requirements of the Contract Documents as ENGINEER
may determine necessary, which shall be consistent with
the intent of and reasonably inferable from the Contract
Documents. Such written clarifications and
interpretations
