supervising all safety precau-
tions and programs in connection with the Work.
CONTRACTOR shall take all necessary precautions for
the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
1. all persons on the Site or who may be
affected by the Work;
2. all the Work and materials and equipment to
be incorporated therein, whether in storage on or off
the Site; and
3. other property at the Site or adjacent thereto,
including trees, shrubs, lawns, walks, pavements,
roadways, structures, utilities, and Underground
Facilities not designated for removal, relocation, or
replacement in the course of construction.
B. CONTRACTOR shall comply with all applicable
Laws and Regulations relating to the safety of persons or
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-23
SECTION 00700
GENERAL CONDITIONS
property, or to the protection of persons or property from
damage, injury, or loss; and shall erect and maintain all
necessary safeguards for such safety and protection.
CONTRACTOR shall notify owners of adjacent property
and of Underground Facilities and other utility owners
when prosecution of the Work may affect them, and shall
cooperate with them in the protection, removal,
relocation, and replacement of their property. All
damage, injury, or loss to any property referred to in
paragraph 6.13.A.2 or 6.13.A.3 caused, directly or
indirectly, in whole or in part, by CONTRACTOR, any
Subcontractor, Supplier, or any other individual or entity
directly or indirectly employed by any of them to perform
any of the Work, or anyone for whose acts any of them
may be liable, shall be remedied by CONTRACTOR
(except damage or loss attributable to the fault of Draw-
ings or Specifications or to the acts or omissions of
OWNER or ENGINEER or ENGINEER’s Consultant, or
anyone employed by any of them, or anyone for whose
acts any of them may be liable, and not attributable,
directly or indirectly, in whole or in part, to the fault or
negligence of CONTRACTOR or any Subcontractor,
Supplier, or other individual or entity directly or
indirectly employed by any of them). CONTRACTOR’s
duties and responsibilities for safety and for protection of
the Work shall continue until such time as all the Work is
completed and ENGINEER has issued a notice to
OWNER and CONTRACTOR in accordance with
paragraph 14.07.B that the Work is acceptable (except as
otherwise expressly provided in connection with
Substantial Completion).
6.14 Safety Representative
A. CONTRACTOR shall designate a qualified and
experienced safety representative at the Site whose duties
and responsibilities shall be the prevention of accidents
and the maintaining and supervising of safety precautions
and programs.
6.15 Hazard Communication Programs
A. CONTRACTOR shall be responsible for coordi-
nating any exchange of material safety data sheets or
other hazard communication information required to be
made available to or exchanged between or among
employers at the Site in accordance with Laws or
Regulations.
6.16 Emergencies
A. In emergencies affecting the safety or protection
of persons or the Work or property at the Site or adjacent
thereto, CONTRACTOR is obligated to act to prevent
Russell Stephenson — Electrical Manhole Rehabilitation
threatened damage, injury, or loss. CONTRACTOR
shall give ENGINEER prompt written notice if
CONTRACTOR believes that any significant changes in
the Work or variations from the Contract Documents
have been caused thereby or are required as a result
thereof. If ENGINEER determines that a change in the
Contract Documents is required because of the action
taken by CONTRACTOR in response to such an
emergency, a Work Change Directive or Change Order
will be issued.
6.17 Shop Drawings and Samples
A. CONTRACTOR shall submit Shop Drawings to
ENGINEER for review and approval in accordance with
the acceptable schedule of Shop Drawings and Sample
submittals. All submittals will be identified as
ENGINEER may require and in the number of copies
specified in the General Requirements. The data shown
on the Shop Drawings will be complete with respect to
quantities, dimensions, specified performance and design
criteria, materials, and similar data to show ENGINEER
the services, materials, and equipment CONTRACTOR
proposes to provide and to enable ENGINEER to review
the information for the limited purposes required by
paragraph 6.17.E.
B. CONTRACTOR shall also submit Samples to
ENGINEER for review and approval in accordance with
the acceptable schedule of Shop Drawings and Sample
submittals. Each Sample will be identified clearly as to
material, Supplier, pertinent data such as catalog
numbers, and the use for which intended and otherwise as
ENGINEER may require to enable ENGINEER to
review the submittal for the limited purposes required by
paragraph 6.17.E. The numbers of each Sample to be
submitted will be as specified in the Specifications.
C. Where a Shop Drawing or Sample is required by
the Contract Documents or the schedule of Shop
Drawings and Sample submittals acceptable to
ENGINEER as required by paragraph 2.07, any related
Work performed prior to ENGINEER’s review and
approval of the pertinent submittal will be at the sole
expense and responsibility of CONTRACTOR.
D. Submittal Procedures
1. Before submitting each Shop Drawing or
Sample, CONTRACTOR shall have determined and
verified:
a. all field measurements, quantities,
dimensions, specified performance criteria,
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-24
SECTION 00700
GENERAL CONDITIONS
installation requirements, materials, catalog
numbers, and similar information with respect
thereto;
b. all materials with respect to intended
use, fabrication, shipping, handling, storage,
assembly, and installation pertaining to the
performance of the Work;
c. all information relative to means, meth-
ods, techniques, sequences, and procedures of
construction, and safety precautions and
programs incident thereto; and
d. CONTRACTOR shall also have
reviewed and coordinated each Shop Drawing or
Sample with other Shop Drawings and Samples
and with the requirements of the Work and the
Contract Documents.
2. Each submittal shall bear a stamp or specific
written indication that CONTRACTOR has satisfied
CONTRACTOR’s obligations under the Contract
Documents with respect to CONTRACTOR’s review
and approval of that submittal.
3. At the time of each submittal,
CONTRACTOR shall give ENGINEER specific
written notice of such variations, if any, that the Shop
Drawing or Sample submitted may have from the
requirements of the Contract Documents, such notice
to be in a written communication separate from the
submittal; and, in addition, shall cause a specific
notation to be made on each Shop Drawing and
Sample submitted to ENGINEER for review and
approval of each such variation.
E. ENGINEER’s Review
1. ENGINEER will timely review and approve
Shop Drawings and Samples in accordance with the
schedule of Shop Drawings and Sample submittals
acceptable to ENGINEER. ENGINEER’s review
and approval will be only to determine if the items
covered by the submittals will, after installation or
incorporation in the Work, conform to the information
given in the Contract Documents and be compatible
with the design concept of the completed Project as a
functioning whole as indicated by the Contract Docu-
ments.
2. ENGINEER’s review and approval will not
extend to means, methods, techniques, sequences, or
procedures of construction (except where a particular
means, method, technique, sequence, or procedure of
Russell Stephenson — Electrical Manhole Rehabilitation
construction is specifically and expressly called for by
the Contract Documents) or to safety precautions or
programs incident thereto. The review and approval
ofa separate item as such will not indicate approval
of the assembly in which the item functions.
3. ENGINEER’s review and approval of Shop
Drawings or Samples shall not relieve
CONTRACTOR from responsibility for any variation
from the requirements of the Contract Documents
unless CONTRACTOR has in writing called
ENGINEER’ attention to each such variation at the
time of each submittal as required by paragraph
6.17.D.3 and ENGINEER has given written approval
of each such variation by specific written notation
thereof incorporated in or accompanying the Shop
Drawing or Sample approval; nor will any approval
by ENGINEER relieve CONTRACTOR from
responsibility for complying with the requirements of
paragraph 6.17.D.1.
F. Resubmittal Procedures:
1. CONTRACTOR shall make corrections
required by ENGINEER and shall return the required
number of corrected copies of Shop Drawings and
submit as required new Samples for review and
approval. CONTRACTOR shall direct specific
attention in writing to revisions other than the
corrections called for by ENGINEER on previous
submittals.
6.18 Continuing the Work
A. CONTRACTOR shall carry on the Work and
adhere to the progress schedule during all disputes or
disagreements with OWNER. No Work shall be delayed
or postponed pending resolution of any disputes or
disagreements, except as permitted by paragraph 15.04
or as OWNER and CONTRACTOR may otherwise agree
in writing.
6.19 CONTRACTOR ’s General Warranty and
Guarantee
A. CONTRACTOR warrants and guarantees to
OWNER, ENGINEER, and ENGINEER’s Consultants
that all Work will be in accordance with the Contract
Documents and will not be defective. CONTRACTOR’s
warranty and guarantee hereunder excludes defects or
damage caused by:
1. abuse, modification, or improper main-
tenance or operation by persons other than CON-
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-25
SECTION 00700
GENERAL CONDITIONS
TRACTOR, Subcontractors, Suppliers, or any other
individual or entity for whom CONTRACTOR is
responsible; or
2. normal wear and tear under normal usage.
B. CONTRACTOR’s obligation to perform and
complete the Work in accordance with the Contract
Documents shall be absolute. None of the following will
constitute an acceptance of Work that is not in accor-
dance with the Contract Documents or a release of
CONTRACTOR’s obligation to perform the Work in
accordance with the Contract Documents:
1. observations by ENGINEER;
2. recommendation by ENGINEER or payment
by OWNER of any progress or final payment;
3. the issuance of a certificate of Substantial
Completion by ENGINEER or any payment related
thereto by OWNER;
4. use or occupancy of the Work or any part
thereof by OWNER;
5. anyacceptance by OWNER or any failure to
do so;
6. any review and approval of a Shop Drawing
or Sample submittal or the issuance of a notice of
acceptability by ENGINEER;
7. any inspection, test, or approval by others; or
8. any correction of defective Work by OWN-
ER.
6.20 Indemnification
A. To the fullest extent permitted by Laws and
Regulations, CONTRACTOR shall indemnify and hold
harmless OWNER, ENGINEER, ENGINEER’s Consul-
tants, and the officers, directors, partners, employees,
agents, and other consultants and subcontractors of each
and any of them from and against all claims, costs, losses,
and damages (including but not limited to all fees and
charges of engineers, architects, attorneys, and other
professionals and all court or arbitration or other dispute
resolution costs) arising out of or relating to the perfor-
mance of the Work, provided that any such claim, cost,
loss, or damage:
Russell Stephenson — Electrical Manhole Rehabilitation
1. is attributable to bodily injury, sickness,
disease, or death, or to injury to or destruction of real
or personal property (other than the Work itself),
including the loss of use resulting therefrom; and
2. is caused in whole or in part by any act or
omission of CONTRACTOR, any Subcontractor, any
Supplier, or any individual or entity directly or
indirectly employed by any of them to perform any of
the Work or anyone for whose acts any of