afforded by or other provisions
of the Bonds or insurance required to be purchased and
maintained by the other party in accordance with Article
5 on the basis of non-conformance with the Contract
Documents, the objecting party shall so notify the other
party in writing within 10 days after receipt of the
certificates (or other evidence requested) required by
paragraph 2.05.C. OWNER and CONTRACTOR shall
each provide to the other such additional information in
respect of insurance provided as the other may reasonably
request. If either party does not purchase or maintain all
of the Bonds and insurance required of such party by the
Contract Documents, such party shall notify the other
party in writing of such failure to purchase prior to the
start of the Work, or of such failure to maintain prior to
any change in the required coverage. Without prejudice
to any other right or remedy, the other party may elect to
obtain equivalent Bonds or insurance to protect such
other party's interests at the expense of the party who was
required to provide such coverage, and a Change Order
shall be issued to adjust the Contract Price accordingly.
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-18
SECTION 00700
GENERAL CONDITIONS
ARTICLE 6 - CONTRACTOR’S REPONSIBILITIES
6.01 Supervision and Superintendence
A. CONTRACTOR shall supervise, inspect, and
direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and
expertise as may be necessary to perform the Work in
accordance with the Contract Documents.
CONTRACTOR shall be solely responsible for the
means, methods, techniques, sequences, and procedures
of construction, but CONTRACTOR shall not be
responsible for the negligence of OWNER or
ENGINEER in the design or specification of a specific
means, method, technique, sequence, or procedure of
construction which is shown or indicated in and expressly
required by the Contract Documents. CONTRACTOR
shall be responsible to see that the completed Work
complies accurately with the Contract Documents.
B. At all times during the progress of the Work,
CONTRACTOR shall assign a competent resident
superintendent thereto who shall not be replaced without
written notice to OWNER and ENGINEER except under
extraordinary circumstances. The superintendent will be
CONTRACTOR’s representative at the Site and shall
have authority to act on behalf of CONTRACTOR. All
communications given to or received from the superin-
tendent shall be binding on CONTRACTOR.
6.02 Labor; Working Hours
A. CONTRACTOR shall provide competent,
suitably qualified personnel to survey, lay out, and
construct the Work as required by the Contract Docu-
ments. CONTRACTOR shail at all times maintain good
discipline and order at the Site.
B. Except as otherwise required for the safety or
protection of persons or the Work or property at the Site
or adjacent thereto, and except as otherwise stated in the
Contract Documents, all Work at the Site shall be
performed during regular working hours, and
CONTRACTOR will not permit overtime work or the
performance of Work on Saturday, Sunday, or any legal
holiday without OWNER’s written consent (which will
not be unreasonably withheld) given after prior written
notice to ENGINEER.
Russell Stephenson — Electrical Manhole Rehabilitation
6.03 Services, Materials, and Equipment
A. Unless otherwise specified in the General Re-
quirements, CONTRACTOR shali provide and assume
full responsibility for all services, materials, equipment,
labor, transportation, construction equipment and
machinery, tools, appliances, fuel, power, light, heat,
telephone, water, sanitary facilities, temporary facilities,
and all other facilities and incidentals necessary for the
performance, testing, start-up, and completion of the
Work.
B. All materials and equipment incorporated into the
Work shall be as specified or, ifnot specified, shall be of
good quality and new, except as otherwise provided in
the Contract Documents. All warranties and guarantees
specifically called for by the Specifications shall
expressly run to the benefit of OWNER. If required by
ENGINEER, CONTRACTOR shall furnish satisfactory
evidence (including reports of required tests) as to the
source, kind, and quality of materials and equipment. All
materials and equipment shall be stored, applied,
installed, connected, erected, protected, used, cleaned,
and conditioned in accordance with instructions of the
applicable Supplier, except as otherwise may be provided
in the Contract Documents.
6.04 Progress Schedule
A. CONTRACTOR shall adhere to the progress
schedule established in accordance with paragraph 2.07
as it may be adjusted from time to time as provided
below.
1. CONTRACTOR shall submit to ENGI-
NEER for acceptance (to the extent indicated in
paragraph 2.07) proposed adjustments in the progress
schedule that will not result in changing the Contract
Times (or Milestones). Such adjustments will
conform generally to the progress schedule then in
effect and additionally will comply with any provi-
sions of the General Requirements applicable thereto.
2. Proposed adjustments in the progress
schedule that will change the Contract Times (or
Milestones) shall be submitted in accordance with the
requirements of Article 12. Such adjustments may
only be made by a Change Order or Written Amend-
ment in accordance with Article 12.
6.05 Substitutes and “Or-Equals”
A. Whenever an item of material or equipment is
specified or described in the Contract Documents by
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-19
SECTION 00700
GENERAL CONDITIONS
using the name of a proprietary item or the name of a
particular Supplier, the specification or description is
intended to establish the type, function, appearance, and
quality required. Unless the specification or description
contains or is followed by words reading that no like,
equivalent, or “or-equal” item or no substitution is
permitted, other items of material or equipment or
material or equipment of other Suppliers may be
submitted to ENGINEER for review under the circum-
stances described below.
I. “Or-Equal” Items: Uf, in ENGINEER’s sole
discretion, an item of material or equipment proposed
by CONTRACTOR is functionally equal to that
named and sufficiently similar so that no change in
related Work will be required, it may be considered
by ENGINEER as an “or-equal” item, in which case
review and approval of the proposed item may, in
ENGINEER’s sole discretion, be accomplished
without compliance with some or all of the require-
ments for approval of proposed substitute items. For
the purposes of this paragraph 6.05.A.1, a proposed
item of material or equipment will be considered
functionally equal to an item so named if
a. In the exercise of reasonable judgment
ENGINEER determines that: (i) it is at least
equal in quality, durability, appearance, strength,
and design characteristics; (ii) it will reliably
perform at least equally well the function
imposed by the design concept of the completed
Project as a _ functioning whole; and
CONTRACTOR;
b. Certifies that: (i) there is no increase in
cost to the OWNER; and (ii) it will conform
substantially, even with deviations, to the
detailed requirements of the item named in the
Contract Documents.
2. Substitute Items
a. If, in ENGINEER’s sole discretion, an
item of material or equipment proposed by
CONTRACTOR does not qualify as an
“or-equal” item under paragraph 6.05.A.1, it will
be considered a proposed substitute item.
b. CONTRACTOR shall submit sufficient
information as provided below to allow
ENGINEER to determine that the item of
material or equipment proposed is essentially
equivalent to that named and an acceptable
substitute therefor. Requests for review of
Russell Stephenson — Electrical Manhole Rehabilitation
proposed substitute items of material or
equipment will not be accepted by ENGINEER
from anyone other than CONTRACTOR.
c. The procedure for review by
ENGINEER will be as set forth in paragraph
6.05.A.2.d, as supplemented in the General
Requirements and as ENGINEER may decide is
appropriate under the circumstances.
d. CONTRACTOR shall first make
written application to ENGINEER for review of
a proposed substitute item of material or
equipment that CONTRACTOR seeks to furnish
or use. The application shall certify that the
proposed substitute item will perform adequately
the functions and achieve the results called for by
the general design, be similar in substance to that
specified, and be suited to the same use as that
specified. The application will state the extent, if
any, to which the use of the proposed substitute
item will prejudice CONTRACTOR’s
achievement of Substantial Completion on time,
whether or not use of the proposed substitute
item in the Work will require a change in any of
the Contract Documents (or in the provisions of
any other direct contract with OWNER for work
on the Project) to adapt the design to the
proposed substitute item and whether or not
incorporation or use of the proposed substitute
item in connection with the Work is subject to
payment of any license fee or royalty. All
variations of the proposed substitute item from
that specified will be identified in the application,
and available engineering, sales, maintenance,
repair, and replacement services will be
indicated. The application will also contain an
itemized estimate of all costs or credits that will
result directly or indirectly from use of such
substitute item, including costs of redesign and
claims of other contractors affected by any
resulting change, all of which will be considered
by ENGINEER in evaluating the proposed
substitute item. ENGINEER may require
CONTRACTOR to furnish additional data about
the proposed substitute item.
B. Substitute Construction Methods or Procedures:
If a specific means, method, technique, sequence, or
procedure of construction is shown or indicated in and
expressly required by the Contract Documents,
CONTRACTOR may furnish or utilize a substitute
means, method, technique, sequence, or procedure of
construction approved by ENGINEER. CONTRACTOR
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-20
SECTION 00700
GENERAL CONDITIONS
shall submit sufficient information to allow ENGINEER,
in ENGINEER’s sole discretion, to determine that the
substitute proposed is equivalent to that expressly called
for by the Contract Documents. The procedure for
review by ENGINEER will be similar to that provided in
subparagraph 6.05.A.2.
C. Engineer’s Evaluation: ENGINEER will be
allowed a reasonable time within which to evaluate each
proposal or submittal made pursuant to paragraphs
6.05.A and 6.05.B. ENGINEER will be the sole judge of
acceptability. No “or-equal” or substitute will be or-
dered, installed or utilized until ENGINEER’s review is
complete, which will be evidenced by either a Change
Order for a substitute or an approved Shop Drawing for
an “or equal.” ENGINEER will advise CONTRACTOR
in writing of any negative determination.
D. Special Guarantee; OWNER may require
CONTRACTOR to furnish at CONTRACTOR’s ex-
pense a special performance guarantee or other surety
with respect to any substitute.
E. ENGINEER’s Cost Reimbursement:
ENGINEER will record time required by ENGINEER
and ENGINEER’s Consultants in evaluating substitute
proposed or submitted by CONTRACTOR pursuant to
paragraphs 6.05.A.2 and 6.05.B and in making changes
in the Contract Documents (or in the provisions of any
other direct contract with OWNER for work on the
Project) occasioned thereby. Whether or not
ENGINEER approves a substitute item so proposed or
submitted by CONTRACTOR, CONTRACTOR shall
reimburse OWNER for the charges of ENGINEER and
ENGINEER’s Consultants for evaluating each such
proposed substitute.
F. CONTRACTOR’s Expense: CONTRACTOR
shall provide all data in support of any proposed
substitute or “or-equal” at