are not Contract Documents. Such
“technical data" is identified in the Supplementary
Conditions. Except for such reliance on such "technical
data", CONTRACTOR may not rely upon or make any
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-15
SECTION 00700
GENERAL CONDITIONS
Claim against OWNER, ENGINEER or any of
ENGINEER's Consultants with respect to:
1. the completeness of such reports and
drawings for CONTRACTOR’s purposes, including,
but not limited to, any aspects of the means, methods,
techniques, sequences and procedures of construction
to be employed by CONTRACTOR and safety
precautions and programs incident thereto; or
2. other data, interpretations, opinions and
information contained in such reports or shown or
indicated in such drawings; or
3. any CONTRACTOR interpretation of or
conclusion drawn from any "technical data" or any
such other data, interpretations, opinions or
information.
C. CONTRACTOR shall not be responsible for any
Hazardous Environmental Condition uncovered or re-
vealed at the Site which was not shown or indicated in
Drawings or Specifications or identified in the Contract
Documents to be within the scope of the Work.
CONTRACTOR shall be responsible for a Hazardous
Environmental Condition created with any materials
brought to the Site by CONTRACTOR, Subcontractors,
Suppliers, or anyone else for whom CONTRACTOR is
responsible.
D. If CONTRACTOR encounters a Hazardous
Environmental Condition or if CONTRACTOR or
anyone for whom CONTRACTOR is responsible creates
a Hazardous Environmental Condition, CONTRACTOR
shall immediately: (i) secure or otherwise isolate such
condition; (ii) stop all Work in connection with such
condition and in any area affected thereby (except in an
emergency as required by paragraph 6.16); and (iii)
notify OWNER and ENGINEER (and promptly
thereafter confirm such notice in writing). OWNER shall
promptly consult with ENGINEER concerning the
necessity for OWNER to retain a qualified expert to
evaluate such condition or take corrective action, if any.
E. CONTRACTOR shall not be required to resume
Work in connection with such condition or in any
affected area until after OWNER has obtained any
required permits related thereto and delivered to
CONTRACTOR written notice: (i) specifying that such
condition and any affected area is or has been rendered
safe for the resumption of Work; or (ii) specifying any
special conditions under which such Work may be re-
sumed safely. If OWNER and CONTRACTOR cannot
agree as to entitlement to or on the amount or extent, if
any, of any adjustment in Contract Price or Contract
Russell Stephenson — Electrical Manhole Rehabilitation
Times, or both, as a result of such Work stoppage or such
special conditions under which Work is agreed to be
resumed by CONTRACTOR, either party may make a
Claim therefor as provided in paragraph 10.05.
F. If, after receipt of such written notice,
CONTRACTOR does not agree to resume such Work
based on a reasonable belief it is unsafe, or does not
agree to resume such Work under such special condi-
tions, then OWNER may order the portion of the Work
that is in the area affected by such condition to be deleted
from the Work. IFOWNER and CONTRACTOR cannot
agree as to entitlement to or on the amount or extent, if
any, of an adjustment in Contract Price or Contract Times
as a result of deleting such portion of the Work, then
either party may make a Claim therefor as provided in
paragraph 10.05. OWNER may have such deleted
portion ofthe Work performed by OWNER’s own forces
or others in accordance with Article 7.
G. To the fullest extent permitted by Laws and
Regulations, CONTRACTOR shall indemnify and hold
harmless OWNER, ENGINEER, ENGINEER’s Consul-
tants, and the officers, directors, partners, employees,
agents, other consultants, and subcontractors of each and
any of them from and against all claims, costs, losses, and
damages (including but not limited to all fees and charges
of engineers, architects, attorneys, and other professionals
and all court or arbitration or other dispute resolution
costs) arising out of or relating to a Hazardous
Environmental Condition created by CONTRACTOR or
by anyone for whom CONTRACTOR is responsible.
Nothing in this paragraph 4.06.G shall obligate
CONTRACTOR to indemnify any individual or entity
from and against the consequences of that individual’s or
entity’s own negligence.
H. The provisions of paragraphs 4.02, 4.03, and
4.04 are not intended to apply to a Hazardous
Environmental Condition uncovered or revealed at the
Site.
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-16
SECTION 00700
GENERAL CONDITIONS
ARTICLE 5 - BONDS AND INSURANCE
5.01 Performance, Payment, and Other Bonds
A. CONTRACTOR shall furnish performance and
payment Bonds, each in an amount at least equal to the
Contract Price as security for the faithful performance and
payment of all CONTRACTOR’s obligations under the
Coniract Documents. These Bonds shall remain in effect
at least until one year after the date when final payment
becomes due, except as provided otherwise by Laws or
Regulations or by the Contract Documents.
CONTRACTOR shall also furnish such other Bonds as
are required by the Contract Documents.
B. All Bonds shall be in the form prescribed by the
Contract Documents, except as provided otherwise by
Laws or Regulations, and shall be executed by such
sureties as are named in the current list of “Companies
Holding Certificates of Authority as Acceptable Sureties
on Federal Bonds and as Acceptable Reinsuring Compa-
nies” as published in Circular 570 (amended) by the
Financial Management Service, Surety Bond Branch,
U.S. Department ofthe Treasury. All Bonds signed by an
agent must be accompanied by a certified copy of such
agent’s authority to act.
C. If the surety on any Bond furnished by
CONTRACTOR is declared bankrupt or becomes
insolvent or its right to do business is terminated in any
state where any part of the Project is located or it ceases
to meet the requirements of paragraph 5.01.B,
CONTRACTOR shall within 20 days thereafter
substitute another Bond and surety, both of which shall
comply with the requirements of paragraphs 5.01.B
and 5.02.
$.02 Licensed Sureties and Insurers
A. All Bonds and insurance required by the Contract
Documents to be purchased and maintained by OWNER
or CONTRACTOR shall be obtained from surety or
insurance companies that are duly licensed or authorized
in the jurisdiction in which the Project is located to issue
Bonds or insurance policies for the limits and coverages
so required. Such surety and insurance companies shall
also meet such additional requirements and qualifications
as may be provided in the Supplementary Conditions.
Russell Stephenson — Electrical Manhole Rehabilitation
5.03 Certificates of Insurance
A. CONTRACTOR shall deliver to OWNER, with
copies to each additional insured identified in the Supple-
mentary Conditions, certificates of insurance (and other
evidence of insurance requested by OWNER or any other
additional insured) which CONTRACTOR is required to
purchase and maintain. OWNER shall deliver to
CONTRACTOR, with copies to each additional insured
identified in the Supplementary Conditions, certificates of
insurance (and other evidence of insurance requested by
CONTRACTOR or any other additional insured) which
OWNER is required to purchase and maintain.
5.04 CONTRACTOR’s Liability Insurance
A. CONTRACTOR shall purchase and maintain
such liability and other insurance as is appropriate for the
Work being performed and as will provide protection
from claims set forth below which may arise out of or
result from CONTRACTOR’s performance of the Work
and CONTRACTOR’s other obligations under the
Contract Documents, whether it is to be performed by
CONTRACTOR, any Subcontractor or Supplier, or by
anyone directly or indirectly employed by any of them to
perform any of the Work, or by anyone for whose acts any
of them may be liable:
1. claims under workers’ compensation,
disability benefits, and other similar employee benefit
acts;
2. claims for damages because of bodily injury,
occupational sickness or disease, or death of
CONTRACTOR’s employees;
3. claims for damages because of bodily injury,
sickness or disease, or death of any person other than
CONTRACTOR’s employees;
4. claims for damages insured by reasonably
available personal injury liability coverage which are
sustained: (1) by any person as a result of an offense
directly or indirectly related to the employment of
such person by CONTRACTOR, or (ii) by any other
person for any other reason;
5. claims for damages, other than to the Work
itself, because of injury to or destruction of tangible
property wherever located, including loss of use
resulting therefrom; and
6. claims for damages because of bodily injury
or death of any person or property damage arising out
GENERAL CONDITIONS
OKALOOSA COUNTY WATER AND SEWER
DATE: 5/13/2012
00700-17
SECTION 00700
GENERAL CONDITIONS
of the ownership, maintenance or use of any motor
vehicle.
B. The policies of insurance so required by this
paragraph 5.04 to be purchased and maintained shall:
1. with respect to insurance required by para-
graphs 5.04.A.3 through 5.04.A.6 inclusive, include
as additional insureds (subject to any customary
exclusion in respect of professional liability)
OWNER, ENGINEER, ENGINEER's Consultants,
and any other individuals or entities identified in the
Supplementary Conditions, all of whom shall be listed
as additional insureds, and include coverage for the
respective officers, directors, partners, employees,
agents, and other consultants and subcontractors of
each and any of all such additional insureds, and the
insurance afforded to these additional insureds shall
provide primary coverage for all claims covered
thereby;
2. include at least the specific coverages and be
written for not less than the limits of liability provided
in the Supplementary Conditions or required by Laws
or Regulations, whichever is greater;
3. include completed operations insurance;
4. include contractual liability insurance
covering CONTRACTOR’s indemnity obligations
under paragraphs 6.07, 6.11, and 6.20;
5. contain a provision or endorsement that the
coverage afforded will not be canceled, materially
changed or renewal refused until at least thirty days
prior written notice has been given to OWNER and
CONTRACTOR and to each other additional insured
identified in the Supplementary Conditions to whom a
certificate of insurance has been issued (and the
certificates of insurance furnished by the
CONTRACTOR pursuant to paragraph 5.03 will so
provide);
6. remain in effect at least until final payment
and at all times thereafter when CONTRACTOR may
be correcting, removing, or replacing defective Work
in accordance with paragraph 13.07; and
7. with respect to completed operations insur-
ance, and any insurance coverage written on aclaims-
made basis, remain in effect for at least two years
after final payment (and CONTRACTOR shall
furnish OWNER and each other additional insured
identified in the Supplementary Conditions, to whom
a certificate of insurance has been issued, evidence
Russell Stephenson — Electrical Manhole Rehabilitation
satisfactory to OWNER and any such additional
insured of continuation of such insurance at final
payment and one year thereafter).
5.05 OWNER’s Liability Insurance
A. Inaddition to the insurance required to be provid-
ed by CONTRACTOR under paragraph 5.04, OWNER,
at OWNER’s option, may purchase and maintain at
OWNER’s expense OWNER’s own liability insurance as
will protect OWNER against claims which may arise
from operations under the Contract Documents.
5.06 Property Insurance (See Supplementary
Conditions)
5.07 (Not Used)
5.08 (Not Used)
5.09 (Not Used)
5.10 Acceptance of Bonds and Insurance; Option to
Replace
A. If either OWNER or CONTRACTOR has any
objection to the coverage