READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 19, 2014 — Action Item Printout — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 88-Action Item Printout.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: August 19, 2014
TO: Honorable Chairman and Members of the Board
FROM: Zan Fedorak
SUBJECT: Seeking Approval to Award Contract for Construction of Boarding
Bridges and Bag Lifts
DEPARTMENT: Purchasing
BCC DISTRICT: All
STATEMENT OF ISSUE: [PUR] Seeking approval to award contract for the construction of
Boarding Bridges and Bag Lifts at the Northwest Florida Regional Airport (AP 49-14).
BACKGROUND & ANALYSIS: On November 5, 2013, the Board of County Commissioners
approved the request to design and install 2 new passenger boarding bridges. A Non-Mandatory
Pre-Bid Meeting was held on May 14, 2014 at the Northwest Florida Regional Airport and the
Bid Opening was held on July 25, 2014. There were two proposals received. However, Thyssen
Krupp was the only bid to meet specifications at a base bid of $1,686,452 with additives making
the final total of $1,998,640. The project consists of the construction of two new Passenger
Boarding Bridges for Gates A-1 and A-2 on the West side of the terminal. Also included in this
project will be the replacement of the 400hz/48VDC ground power units and the pre-conditioned
air units. The bridge structure will consist of a ramped fixed tunnel, a rotating rotunda,
telescoping bridge tunnel section, a cab with full controls for moving the bridge into position,
vertical and horizontal drive system, a hooded canopy over the fuselage, and provisions to re-
mark the apron for the new parking positions associated with revised docking procedures than
what is currently marked and the potential for larger mix of aircraft at these positions. In
addition, the airport will be adding 4 new bag lift devices to each of the existing B Gates. The
project is funded from 90% FAA; 5% FDOT and 5% local. Proposed construction duration is
241 days.
OPTIONS: Approval/Deny award of the contract for the construction of Boarding Bridges and
Bag Lifts at the Northwest Florida Regional Airport (AP 49-14) for a total cost of $1,998,640
and authorize the Chairman to sign the contract.
RECOMMENDATION: Staff recommends approval of the contract for the construction of
Boarding Bridges and Bag Lifts at the Northwest Florida Regional Airport (AP 49-14) for a total
cost of $1,998,640 and authorize the Chairman to sign the contract.