READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — August 19, 2014 — Action Item Printout — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 88-Action Item Printout.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: August 19, 2014 TO: Honorable Chairman and Members of the Board FROM: Zan Fedorak SUBJECT: Seeking Approval to Award Contract for Construction of Boarding Bridges and Bag Lifts DEPARTMENT: Purchasing BCC DISTRICT: All STATEMENT OF ISSUE: [PUR] Seeking approval to award contract for the construction of Boarding Bridges and Bag Lifts at the Northwest Florida Regional Airport (AP 49-14). BACKGROUND & ANALYSIS: On November 5, 2013, the Board of County Commissioners approved the request to design and install 2 new passenger boarding bridges. A Non-Mandatory Pre-Bid Meeting was held on May 14, 2014 at the Northwest Florida Regional Airport and the Bid Opening was held on July 25, 2014. There were two proposals received. However, Thyssen Krupp was the only bid to meet specifications at a base bid of $1,686,452 with additives making the final total of $1,998,640. The project consists of the construction of two new Passenger Boarding Bridges for Gates A-1 and A-2 on the West side of the terminal. Also included in this project will be the replacement of the 400hz/48VDC ground power units and the pre-conditioned air units. The bridge structure will consist of a ramped fixed tunnel, a rotating rotunda, telescoping bridge tunnel section, a cab with full controls for moving the bridge into position, vertical and horizontal drive system, a hooded canopy over the fuselage, and provisions to re- mark the apron for the new parking positions associated with revised docking procedures than what is currently marked and the potential for larger mix of aircraft at these positions. In addition, the airport will be adding 4 new bag lift devices to each of the existing B Gates. The project is funded from 90% FAA; 5% FDOT and 5% local. Proposed construction duration is 241 days. OPTIONS: Approval/Deny award of the contract for the construction of Boarding Bridges and Bag Lifts at the Northwest Florida Regional Airport (AP 49-14) for a total cost of $1,998,640 and authorize the Chairman to sign the contract. RECOMMENDATION: Staff recommends approval of the contract for the construction of Boarding Bridges and Bag Lifts at the Northwest Florida Regional Airport (AP 49-14) for a total cost of $1,998,640 and authorize the Chairman to sign the contract. RECOMMENDED BY: APPROVED BY: Ernie Padgett, County Administrator

Download this text file with its original spacing ↓