most city
thoroughfares as well as water wells, holding ponds, and certain other
areas;
Cemetery- Two ( 2) City cemeteries. They are assisted during the
growing season by ROW maintenance as well as Street Maintenance.
Service Maintenance-Areas adjacent to City Hall
Additional mowing activities are performed by units within Golf Course, Parks and
Recreation, and Utilities.
It has been suggested that some or all mowing and related turf maintenance
activities be consolidated under one ( 1) unit to potentially achieve increase efficiency
and cost savings.
Alternative Services Delivery Study for Fort Walton Beach, Florida Page 12- 14
Public Works
Recommendation # 57: Continue to provide mowing and related services with
current units. Much of the work is somewhat specialized including ROW
Maintenance' s work on thoroughfares that must not only meet State standards for the
work performed under contract but also must be closely coordinated with horticultural
work and interested civic organizations.
Golf course mowing and maintenance is highly specialized with different
equipment and techniques used for greens, fringes, fairways, tees, clubhouse
landscaping, etc.
Parks and Recreation also has specific requirements for many of their playfields.
In addition, most mowing is performed by unit personnel in conjunction with other
assigned duties.
Continuing to have each unit performing the mowing and maintenance work
within their respective areas of responsibility enhances the flexibility and
responsiveness necessary within smaller organizations.
Alternative Services Delivery Study for Fort Walton Beach, Florida Page 12- 15
SECTION 13.0
UTILITIES
Management Advisory Group, Inc. 2007
13.0 UTILITIES
The Utilities Department is responsible for providing safe, cost- effective potable
water, wastewater treatment and stormwater management services to the city' s citizens
and businesses. The department functions as an enterprise fund which means that all
costs (including depreciation) and all revenues from user charges are accounted for in
the Utilities Fund. The intent is to manage the department's finances in a manner similar
to a private business.
13. 1 Oraanization and StaffinQ
The ordinance establishing the Utilities Department specifies that it consists of six
divisions. Exhibit 13- 1 on the following page represents the current structure as noted in
the recommended City budget. We note that, in practice, the survey team now reports
to the Department Director rather than to the Operations Manager.
Following are the structure, staffing and major services provided by each of these
divisions:
Administration
The total number of authorized and filled positions is seven ( 7). This includes
the Department Director and Senior Staff Assistant as well as the Utilities Division
Operations Manager, the Environmental Specialist, the Survey Party Chief, an
Engineering Aide and the CAD Specialist.
Alternative Services Delivery Study for Fort Walton Beach, Florida Page 13- 1
Utilities
Exhibit 13- 1
Utilities Current
Organization Chart
CITY COUNCIL
Major services: Provides management and coordination of the operating
divisions and monitors compliance with all City, State and Federal codes, policies and
regulations. The Environmental Specialist addresses water quality and stormwater
management issues and GIS implementation. The survey crew locates water and
sewer lines and accesses, determines location references and updates maps. The
CAD Specialist supports design activities and the program to convert manual utility
infrastructure drawings to CAD.
Alternative Services Delivery Study for Fort Walton Beach, Florida Page 13-2
Utilities
Water Operations
The total number of authorized and filled positions is seven ( 7). The division
Superintendent has five ( 5) Water Treatment Operators and one ( 1) Service Worker II
reporting directly to him. The five ( 5) operators provide 6: 30 a. m. to 3: 00 p. m. coverage
seven ( 7) days a week and the Service Worker provides 3: 00 p. m. to 11 : 30 p. m.
coverage five ( 5) days a week. He is the first responder for alarms/ problems and
provides after- hours water "turn on" services, as necessary.
Major services: Maintains the City' s nine ( 9) potable water wells, five ( 5)
elevated water storage tanks, and four ( 4) ground water storage tanks. The division is
responsible for production of drinking water; ensuring that it is safe and free of
objectionable color, taste, and odor; and ensuring there is sufficient pressure and
storage to meet domestic and firefighting needs.
Sewer Operations
The total number of authorized positions is 13 of which 11 are filled~ The
division Superintendent position is vacant. Reporting directly to the Superintendent
position are the Wastewater Plant Supervisor ( who is serving as Superintendent until
that position is filled), a Maintenance Mechanic, a Wastewater Pretreatment
Coordinator, and a Lab Manager. Seven ( 7) Wastewater Plant Operators ( including one
vacancy) report directly to the supervisor as well as a Service Worker II who functions
as the Maintenance Mechanic' s assistance. The Operators are scheduled so that two
2) people are on duty seven ( 7) days a week from 7: 00 a. m. until 11 : 30 p. m.
Alternative Services Delivery Study for Fort Walton Beach, Florida Page 13-3
Utilities
Major services: Operates and maintains the sewer plant so that wastewater is
treated to a standard that allows it to be used as golf course irrigation water or to be
safely released to a spray field. The Lab Manager conducts daily meter calibrations and
performs weekly monitoring of CBOD levels. The pretreatment coordinator deals with
City businesses to help avoid release of contaminates and greases into the sewer
system
Water Distribution
The total number of authorized positions is five ( 5),of which four ( 4) are filled.
The unit is headed by a Construction Foreman I who reports directly to the Utilities
Division Operations Manager. Reporting directly to the foreman are a Heavy Equipment
Operator ( currently vacant) and three Service Workers.
Major services: The division maintains 113 miles of water mains; 10,400
service lines, valves and water meters; and 700 fire hydrants. Staff also replaces
undersized water mains, installs new fire hydrants, makes service taps for new
construction, and extends water mains as needed. The unit performs essentially all
water CIP projects in- house.
Sewer Collection
The total number of authorized positions is 11 of which 10 are filled. Sewer
Collection has two ( 2) primary units- Construction and Collection Systems. The
Construction Foreman II reports directly to the Utilities Division Operations Manager.
Reporting directly to him are a Heavy Equipment Operator and four ( 4) service workers.
The Collection Systems Supervisor also reports directly to the division operations
manager. Reporting directly to him are three ( 3) Collection Systems Workers ( one
Alternative Services Delivery Study for Fort Walton Beach, Florida Page 13-4
Utilities
currently vacant and the other two both absent on Workers' Compensation injuries) and
a Lift Station Mechanic.
Major services: Maintains 41 sewage lift stations, two ( 2) major pump stations
and 100 miles of gravity sewer lines. They also respond to customer complaints,
inspect sewer mains and laterals with closed circuit television equipment, and repair or
replace sewer mains and laterals, as needed. The unit performs essentially all sewer
CIP projects in- house, except in- place lining of sewer pipes.
Stormwater
The total number of authorized positions is zero ( 0). This division currently
consists only of capital improvement projects. The intent is that this will become an
operational division when an anticipated stormwater utility is created.
13.2 Maior Policies and Ooerationallssues
Organization Structure
Finding: The department' s organization structure is consistent with the 2005
ordinance that established Utilities but does not reflect actual operations. The
ordinance specifies that the department shall consist of the following divisions:
Water Distribution
Water Operations
Sewer Collection
Sewer Operations
Stormwater
Administration
Alternative Services Delivery Study for Fort Walton Beach, Florida Page 13. 5
Utilities
This structure is followed in presenting the department's budget. Operationally,
however, the structure is somewhat different. These differences are as follows:
The Sewer Collection and Water Distribution " divisions" are, in practice,
construction crews that work on the wastewater collection and water
distribution systems, respectively. Each is headed by a construction
foreman who reports to a " Utilities Division Operations Manager." A third
unit, called " Collection Systems," is headed by a supervisor who also
reports directly to the operations manager. The wastewater construction
crew performs all CIP work on the system while the collection systems
crew is responsible for maintaining the infrastructure for wastewater
collection. This is done through routine inspections, sewer line washes,
lift station and pump station cleaning, pump replacements, valve and
control maintenance, and similar functions.
The survey and CAD units