Okaloosa County BOCC — July 21, 2016 — Agenda Packet — reading text
Part 17 of 35. These parts divide the reading text for browsing; they are not the source document's page numbers.
Agenda Packet — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
(Dec) 01/31/2016 N/A N/A
Qtr 3 (Mar) 04/30/2016 N/A N/A
Qtr4 (June) 7/31/2016 N/A N/A
Pursuant to Rule 62B-36.006(2)(d), the local sponsor has a 100 percent compliance record
for submitting quarterly reports correctly and on time over the previous year, which awards
2 points for the “Quarterly Reporting Requirements” ranking criteria.
Are there active federal and state permits for the project? Yes (federal channel dredging only)
Federal permit #:SAJ-2007-04911 Expiration date:__May 11, 2026__
State permit #: 028799-003-JC Expiration date:__Feb 26, 2030___
Pursuant to Rule 62B-36.006(2)(d), the local sponsors hold active state and federal permits
for the proposed project, which awards 1 point for the “Active Permits” ranking criteria.
Have local funds been secured for the project? Yes
Explain: FY17 Tourist Development Department budget approved by Tourist Development
Council
Pursuant to Rule 62B-36.006(2)(d), the local sponsors have entered into an interlocal
agreement with regional partners for the purpose of joint inlet management, which awards
1 point for the “Interlocal Agreement for Inlet Management” ranking criteria.
Packet Pg. 201
2.p.a
Attachment: II. p. Local Govt Funding Request (5953 : FY 2017/18 Local Government Funding Request - East Pass sand trap (Jim Trifilio))
In order to acquire state funding, a resolution from the local sponsor must be provided by the
application deadline which declares:
• Support from the Sponsor for the Proposed Project
• Willingness to serve as the Local Sponsor
• Ability to provide the full Local Cost Share
• And the source of the funding
Please attach copy of resolution. To be provided following adoption in August 2016.
Previous State Commitment:
Has the Department previously cost shared, reviewed, and approved a feasibility or design phase
for this project? Yes (both previous inlet management plans, 1999 and 2010).
Pursuant to Rule 62B-36.006(2)(e), the Department has previously cost shared, reviewed,
and appoved a feasibility or design phase, which awards 1 point for the “Previous Cost
Sharing in Feasibility or Design” ranking criteria.
Will this project enhance or increase the longevity of a previously-constructed project? How?
Yes. This project will reduce the maintenance frequency of East Pass federal navigation channel
maintenance dredging and increase the longevity of the Western Destin Beach Restoration Project
by providing a highly cost-effective borrow area (sand source) for future beach re-nourishment.
The reduced beach re-nourishment maintenance costs will allow increased longevity to the beach
project, providing increased storm protection, recreation opportunities, increased property values,
and critical habitat.
Pursuant to Rule 62B-36.006(2)(e), the project has previous state commitment and
enhances or increases the longevity of a previously constructed project within the inlet
influence, which awards 1 point for the “Enhanced Longevity” ranking criteria.
Has a previously approved appropriation for this project phase been released in its entirety by the
local sponsor due to the project timelines?
Pursuant to Rule 62B-36.006(2)(e), the project has previous state commitment and
previously approved appropriations for a project phase could not be encumbered and were
released in their entirety by the local sponsor due to the project timelines, which awards 1
point for the “Previously Restored Shoreline” ranking criteria.
Inlet management plans:
Does the project have an existing Inlet Management Plan or completed Inlet Management Study
accepted by the Department that defines the sediment budget, quantifies the volumetric bypassing
objective and contains specific management strategies? Yes
Pursuant to Rule 62B-36.006(2)(f)(1), the project has an existing Inlet Management Plan
or completed Inlet Management Study accepted by the Department that defines the
sediment budget, quantifies the volumetric bypassing objective and contains specific
management strategies, which awards 5 points for the “Existing Inlet Management Plan”
Packet Pg. 202
2.p.a
ranking criteria.
Attachment: II. p. Local Govt Funding Request (5953 : FY 2017/18 Local Government Funding Request - East Pass sand trap (Jim Trifilio))
Has the Department received and approved an update to an existing Inlet Management Plan in the
form of a current inlet management study/sediment budget analysis within the previous 10 years or
does the project propose to conduct an update to an existing inlet management plan?
Yes
Pursuant to Rule 62B-36.006(2)(f)(2), the Department has received and approved an update
to an existing Inlet Management Plan in the form of a current inlet management
study/sediment budget analysis within the previous 10 years or proposes to conduct an
update to an existing inlet management plan, which awards 5 points for the “Updated Inlet
Management Plan” ranking criteria.
Does the project propose to develop a new inlet management study to be submitted to the
Department for adoption of an Inlet Management Plan?
No. However, the proposed project follows the final implementation strategy (Strategy #4) from
the most recent IMP and will provide greater flexibility in the future management of East Pass and
the high-quality sand source(s) within the inlet.
Pursuant to Rule 62B-36.006(2)(f)(3), the project proposes to develop a new inlet
management study to be submitted to the department for adoption of an Inlet Management
Plan, which awards 15 points for the “New Inlet Management Plan” ranking criteria.
Enhanced project performance: The increased nourishment interval shall be estimated by the
annual bypassing volume divided by the annual beach nourishment volume needed by a beach
project within the area of inlet influence multiplied by 5 for a total of 5 points. Does the proposed
inlet project increase the nourishment interval of the adjacent beach nourishment project? How?
Yes. However, the expected annual bypassing volume from the impoundment basin has not yet
been determined. At a minimum, the basin is expected to meet the bypassing deficiency of
approximately 20,000 cy/yr.
Pursuant to Rule 62B-36.006(2)(g)(3), the increase in annual bypassing volume of XX,000
cy divided by the annual beach nourishment volume needed by a beach within the area of
influence multiplied by 5, which awards X/5 points for the “Enhanced Project
Performance” ranking criteria.
Availability of Federal Funds:
Is the project Federally authorized by WRDA?
No, however, the applicant is currently seeking additional funding and partnership with the
USACE’s Regional Sediment Management Program.
Please provide date of authorization expiration. ______
Does this project phase have a Federal Project Cooperative Agreement, or similar for the current
phase? Provide a copy of the document.
See comment above.
Packet Pg. 203
2.p.a
Pursuant to Rule 62B-36.006(1)(d), the projects has United States Army Corps of
Attachment: II. p. Local Govt Funding Request (5953 : FY 2017/18 Local Government Funding Request - East Pass sand trap (Jim Trifilio))
Engineers Civil Works Congressional authorization for the requested project phase, which
awards 5 points for the “Congressional Authorization of Project Phase” ranking criteria.
Federal cost share percentage available for this project: NA
Pursuant to Rule 62B-36.006(1)(d), the projects has available federal funds and a current
United States Army Corps of Engineers project agreement executed for the requested
project phase or projects listed in a United States Army Corps of Engineers work
plan or current federal budget document, which awards 5 points for the “USACE Project
Agreement” ranking criteria.
Is this project funded through FEMA for storm repairs? No
Provide a copy of the signed Project Worksheet.
Pursuant to Rule 62B-36.006(1)(d), the projects has available federal funds and is a Federal
Emergency Management Agency (FEMA) nourishment project (Category G or equivalent
subsequent program for designed, constructed and routinely maintained beaches) with
approved Project Worksheets, which awards 5 points for the “Availability of FEMA
Funding” ranking criteria.
Packet Pg. 204
2.p.a
N
Attachment: II. p. Local Govt Funding Request (5953 : FY 2017/18 Local Government Funding Request -
CHOCTAWHATCHEE BAY
FEDERAL NAVIGATION