LF/day) 58 days $ 1,000.00 $ 58,000.00 TOTAL GATOR BORING (Contract C14-2094-WS) $ 1,386,558.40 TOTAL EA TAPPING SERVICES (Contract C14-2128-WS) $ 12,000.00 TOTAL OCWS MATERIALS $ 1,156,314.80 TOTAL OCWS LABOR + EQUIP $ 232,000.00 SUBTOTAL CONSTRUCTION (Includes Contracted Services) $ 2,786,873.20 18 15% contingency on materials $ 173,447.22 19 15% admin/overhead fee on labor/mat'l (not equip or contracted) $ 199,547.22 TOTAL CONSTRUCTION $ 3,159,867.64 Packet Pg. 15 Okaloosa County Water & Sewer East County RePump Project- Contract Estimates Contract 1 Contract 2 Contract 3 Contract 4 Contract 5 Pre- Engineered Building Pumps Generator MCC/Controls Site Work Piping OCWS Material $ Cost $ 96,000.00 130,000.00 $328,000.00 $13,797.44 $196,680.00 Labor Cost $ 87,400.00 Contract Cost $ 157,567.06 CONTRACT 1 COST (Pre-Engineered Building) $157,567.06 CONTRACT 2 COST (3- 100hp Centrifugal Pumps) $ 96,000.00 CONTRACT 3 COST (550 kW Generator) $130,000.00 CONTRACT 4 COST (Motor Control & Control Panel) $328,000.00 CONTRACT 5 COST (OCWS Labor, Site Work & Mech Piping) $297,877.44 TOTAL COMBINED CONTRACTS COST $ 1,009,444.50 Packet Pg. 16 Phase 1: Rocky Bayou 16" Force Main (FM) Phase 7: Replace Meigs-Seminole Lift Station Phase 2: Rocky Bayou 16" FM Phase 8: Hwy 20 12" FM Phase 3: Rocky Bayou 16" FM Phase 9: New College Blvd Lift Station LLY Phase 4: Rocky Bayou 16" FM Phase 10: NVOC 16" FM KE Phase 5: Eglin Main 20" FM & 2 Lift Stations Phase 10a: NVOC 16" FM Alternate Phase 6: Replace 10" FM at Canal with 16" FM WOLVERINE JACKSO N E Y EG LA R LL JC CO ER ROG S STIC VAL A ANDREW 5 Y8 HW ND BO Arbennie Pritcehtt WRF R TW O BE NR GE Proposed Eglin Main Lift Station LEWIS TURNER East County Master Sewer Plan - Page 1 . MAP PROJECTION: Lambert Conformal Conic Projection Stateplane : Flo ida Nor th (0903) NAD 1983(90), NAVD 1988. Existing Phase 3 Phase 6 Phase 9 StreetCenterlines PUBLIC RECORD: This map was created by Okaloosa County GIS and is in the public domain pur uant Phase 1 Phase 4 Phase 7 Phase 10 to Chapter 119 , Florida Statutes. DISCLAIMER: Phase 2 Phase 5 Phase 10a 1 inch = 2,500 feet Okaloosa County h reby expressly disclaims Phase 8 any liability for errors or omissions in these maps, indexes or legends. Packet Pg. 17 85 Y2 UNNAME D HW

Download this text file with its original spacing ↓