Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
LF/day) 58 days $ 1,000.00 $ 58,000.00
TOTAL GATOR BORING (Contract C14-2094-WS) $ 1,386,558.40
TOTAL EA TAPPING SERVICES (Contract C14-2128-WS) $ 12,000.00
TOTAL OCWS MATERIALS $ 1,156,314.80
TOTAL OCWS LABOR + EQUIP $ 232,000.00
SUBTOTAL CONSTRUCTION (Includes Contracted Services) $ 2,786,873.20
18 15% contingency on materials $ 173,447.22
19 15% admin/overhead fee on labor/mat'l (not equip or contracted) $ 199,547.22
TOTAL CONSTRUCTION $ 3,159,867.64
Packet Pg. 15
Okaloosa County Water & Sewer
East County RePump Project- Contract Estimates
Contract 1 Contract 2 Contract 3 Contract 4 Contract 5
Pre-
Engineered
Building Pumps Generator MCC/Controls Site Work Piping OCWS
Material $
Cost $ 96,000.00 130,000.00 $328,000.00 $13,797.44 $196,680.00
Labor Cost $ 87,400.00
Contract
Cost $ 157,567.06
CONTRACT 1 COST (Pre-Engineered
Building) $157,567.06
CONTRACT 2 COST (3- 100hp Centrifugal Pumps) $ 96,000.00
CONTRACT 3 COST (550 kW Generator) $130,000.00
CONTRACT 4 COST (Motor Control & Control Panel) $328,000.00
CONTRACT 5 COST (OCWS Labor, Site Work & Mech
Piping) $297,877.44
TOTAL COMBINED CONTRACTS COST $ 1,009,444.50
Packet Pg. 16
Phase 1: Rocky Bayou 16" Force Main (FM) Phase 7: Replace Meigs-Seminole Lift Station
Phase 2: Rocky Bayou 16" FM Phase 8: Hwy 20 12" FM
Phase 3: Rocky Bayou 16" FM Phase 9: New College Blvd Lift Station
LLY
Phase 4: Rocky Bayou 16" FM Phase 10: NVOC 16" FM KE
Phase 5: Eglin Main 20" FM & 2 Lift Stations Phase 10a: NVOC 16" FM Alternate
Phase 6: Replace 10" FM at Canal with 16" FM
WOLVERINE
JACKSO N
E
Y
EG
LA R
LL
JC
CO
ER
ROG
S
STIC
VAL A
ANDREW
5
Y8
HW
ND
BO
Arbennie Pritcehtt WRF R TW
O BE
NR
GE Proposed Eglin Main Lift Station
LEWIS TURNER
East County Master Sewer Plan - Page 1
.
MAP PROJECTION:
Lambert Conformal Conic Projection
Stateplane : Flo ida Nor th (0903)
NAD 1983(90), NAVD 1988.
Existing Phase 3 Phase 6 Phase 9 StreetCenterlines PUBLIC RECORD:
This map was created by Okaloosa County GIS
and is in the public domain pur uant
Phase 1 Phase 4 Phase 7 Phase 10
to Chapter 119 , Florida Statutes.
DISCLAIMER:
Phase 2 Phase 5 Phase 10a 1 inch = 2,500 feet
Okaloosa County h reby expressly disclaims
Phase 8 any liability for errors or omissions in
these maps, indexes or legends.
Packet Pg. 17
85
Y2
UNNAME D
HW