READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — May 20, 2014 — reading text
Part 117 of 120. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
3N 100% 100% 932S 21
17th St Hwy 189 Monroe St 3N 100% 560 18
State Line Rd Robinson Rd Davis Rd 1 100% 100% 4400 20
Vernon Taylor Hwy4 Garrett M ill 3N 100% 100% 660 21
John B Cadenhead Rd Hwy 602 End of Millings 100% 100% 3100 20
Contract 1960 $81 ,806.44
CMR Contract 1960 $150,976 .40
Task order 2 for 1960 $232,782.84
Packet Pg. 838
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: May 20, 2014
TO: Honorable Chairman and Members of the Board
FROM: John Hofstad
SUBJECT: PW - Asphalt Paving Systems C12-1961
DEPARTMENT: Public Works
BCC DISTRICT: All
STATEMENT OF ISSUE: Public Works staff provides a list of roads annually to the Board for
consideration and approval to have a variety of treatment types performed. Resurfacing roads
are performed using internal staff while other preservation techniques are performed utilizing
external sources.
BACKGROUND: Asphalt Paving Systems, Inc is the contractor tasked with providing annual
road preservation techniques based upon staff recommendation of treatment types for roads
within the County maintenance system.
OPTIONS: Approve/Disapprove
RECOMMENDATIONS: Request approval of Task Order 2 for C12-1961 along with the
associated road list to move forward with scheduling and performing the work.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Packet Pg. 839
Double Micro-
Road Name From To District Fog Seal Chip Seal Chip Seal Surfacing Overlay Feet Width
District 2 Task Order 2 Contract 1961 Acct #3204-553012 Mot/Mob - $1,902.33 APS - $35,546.64 Total APS - $37,448.97
Eldridge Rd Address 223 Lewis Turner Blvd 2 100% 4000 21
3rd Ave 3rd St Van Dyke Dr 2 200% 300 22
Van Dyke Dr 3rd Ave 3rd Ave 2 200% 820 22
Whitrock Ln South Ave Cul-de-sac 2 100% 1400 23
Topaz Ct Whitrock Ln Cul-de-sac 2 100% 350 23
Saphire Ct Whitrock Ln Cul-de-sac 2 100% 350 23
Opal Ct Whitrock Ln Cul-de-sac 2 100% 350 23
Gladys Katherine Woodham 2 100% 1000 21
District 4 Task Order 2 Contract 1961 Acct #3204-553014 Mot/Mob - $2,391.05 APS - $45,229.18 Total APS - $47,620.23
Pointed Leaf Ln Beverly Street Cul-de-sac 4 100% 528 22
Rush Park Cir Hwy 98 1st Stop sign 4 100% 400 21
West Park Dr Rush Park Cir Rush Park Cir 4 200% 550 23
Church St Hwy 98 Forrest Glen 4 100% 470 23
Willow Bend Schneider Drive 2342 Willow Bend 4 100% 2600 24
Rush Park Cir 1st Stop sign Rush Park Cir 4 200% 2350 23
District 5 Task Order 2 Contract 1961 Acct #3204-553015 Mot/Mob - $1,506.62 APS - $26,819.08 Total APS - $28,325.70
Laredo Ave Redwood Ave 18th St 5 100% 450 24
11th St 4064 11th St End 5 100% 614 20
Andros Way Grenada Way Antiqua Way 5 100% 670 24
Woodlands Rd Whitepoint Rd Greenwood Way 5 100% 1235 24
Oakwood Cir Greenwood Way Woodlands Rd 5 100% 1223 24
Greenwood Way Greenwood Ln Woodlands Rd 5 100% 1120 24
Edrehi Ave boat ramp Edrehi Ave End of Pavement 5 100% 528 21
Ruckel Drive E College Blvd address 1504 Ruckel Dr 5 100% 1500 27
Oakwood Way Ridgewood Cove N Oakwood Cir 5 100% 400 25
Contract 1961 $113,394.90
Task order 2 for 1961 $113,394.90
Packet Pg. 840
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: May 6, 2014
TO: Honorable Chairman and Members of the Board
FROM: John Hofstad
SUBJECT: PW - Asphalt Paving Systems C12-1961
DEPARTMENT: Public Works
BCC DISTRICT: All
STATEMENT OF ISSUE: Public Works staff provides a list of roads annually to the Board for
consideration and approval to have a variety of treatment types performed. Resurfacing roads
are performed using internal staff while other preservation techniques are performed utilizing
external sources.
BACKGROUND: Asphalt Paving Systems, Inc is the contractor tasked with providing annual
road preservation techniques based upon staff recommendation of treatment types for roads
within the County maintenance system.
OPTIONS: Approve/Disapprove
RECOMMENDATIONS: Request approval of Task Order 2 for C12-1961 along with the
associated road list to move forward with scheduling and performing the work.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Packet Pg. 841
TASK ORDER APPROVAL FORM
CONTRACT#: . .:.C.:. . :.1=2--'-1-'--'96:<...!1_ _ __ _ __
TASK ORDER # : - --'2:...__ _ _ _ _ __
TASK ORDER AMOUNT: $_113,397.90._ _ _ __ _ __
OFFERED BY CONSULT ANT:
Asphalt Paving Systems (APS)
FIRM'S NAME
Robert Capoferri
REPRESENTATIVE'S PRINTED NAME
SIG~
President 4/2/14
TITLE DATE
RECOMMENDED FOR APPROVAL APPROVED BY OKALOOSA COUNTY
(Department Director) (Per Purchasing Manual)
• $25,000 or less approved by Purchasing
Director
• Between $25,001 and $50,000 approved by
Purchasing Director and County
Administrator
• In excess of $50,000 approved by the Board.
John Hofstad
Public Works Director
TITLE DATE
DATE I
CO~IST&Iicable) CHAIRMAN (if applicable)
ylzcY/;'(
DATE DATE
Packet Pg. 842
Double Micro-
Road Name From To District Fog Seal Chip Seal Chip Seal Surfacing Overlay Feet Width
District 2 Task Order 2 Contract 1961 Acct #3204-553012 Mot/Mob - $1,902.33 APS - $35,546.64 Total APS - $37,451.97
Eldridge Rd Address 223 Lewis Turner Blvd 2 100% 4000 21
3rd Ave 3rd St Van Dyke Dr 2 200% 300 22
Van Dyke Dr 3rd Ave 3rd Ave 2 200% 820 22
Whitrock Ln South Ave Cul-de-sac 2 100% 1400 23
Topaz Ct Whitrock Ln Cul-de-sac 2 100% 350 23
Saphire Ct Whitrock Ln Cul-de-sac 2 100% 350 23
Opal Ct Whitrock Ln Cul-de-sac 2 100% 350 23
Gladys Katherine Woodham 2 100% 1000 21
District 4 Task Order 2 Contract 1961 Acct #3204-553014 Mot/Mob - $2,391.05 APS - $45,229.18 Total APS - $47,620.23
Pointed Leaf Ln Beverly Street Cul-de-sac 4 100% 528 22
Rush Park Cir Hwy 98 1st Stop sign 4 100% 400 21
West Park Dr Rush Park Cir Rush Park Cir 4 200% 550 23
Church St Hwy 98 Forrest Glen
