Extension of Little
Silver Road Asphalt
Little Silver Road
Packet Pg. 810
$
Legend
Existing Okaloosa County Property (353 Acres)
Proposed Gulf Power Transmission Line Relocation Easement Preliminary Okaloosa County Reservoir and
Potential Property Acquisition Outside of Proposed NWFWMD Parcel 0 500 1,000 2,000 Water Treatment Plant
Watershed Boundary Feet
May 25, 2011
GNV C:\GIS\360358.A0 OKALOOSA WTR\OKALOOSA_PRIMARY_SITE.MXD 05/11/2011
IMPLEMENTATION PLAN PRELIMINARY BUDGET AND SCHEDULE
FY 2010 FY 2011 FY 2012 FY 2013 Total
Proof-of-Concept, Land Acquisition and Permitting
1 1
1. Preliminary Geotechnical Analysis $15,000 /$65,000 $15,000 /$65,000
1 1
2. Safe Yield Analysis on Shoal River and Unnamed Tributary $50,000 $50,000
1 1
3. Phase I Environmental Site Assessment $8,000 $8,000
4. Site Evaluation – WTP, Raw Water Intake, RWPS and Conveyance Sites $75,000 $75,000
1 1
5. Land Appraisal – WTP, Raw Water Intake, RWPS and Storage Reservoir $20,000 $20,000
1,2 1,2 1,2
6. Land Acquisition – WTP, Raw Water Intake, RWPS and Storage Reservoir $TBD $TBD $TBD
1 1
7. Wetland Investigation and Permitting $75,000 $50,000 $75,000 /$50,000
1 1
8. Cultural Resource Investigation $35,000 $35,000
Preliminary Evaluation of WTP, Raw Water Intake, RWPS, Conveyance, and Storage Reservoir
1. Shoal River Water Quality Characterization and Treatment Alternative Evaluation $50,000 $50,000
2. Bench-Scale Treatability Study $100,000 $100,000
3. Pilot-Testing of Treatment Alternatives (if needed) $50,000 $75,000 $125,000
4. Treatment Alternative Selection $30,000 $30,000
5. WTP, Raw Water Intake, RWPS, Storage Reservoir and Conveyance System Facility $300,000 $300,000
Plan
Existing System Evaluation
1. Hydraulic Model and Evaluation of Distribution System $150,000 $25,000 $175,000
2. Water Demand Projections $40,000 $40,000
2 2 2
Total Cost (NWFWMD) $203,000+TBD $TBD $0 $0 $203,000+TBD
Total Cost (OCWS) $140,000 $140,000 $300,000 $430,000 $1,010,000
Activities highlighted in Green are complete. Activities highlighted in Yellow are underway.
Packet Pg. 811
EXHIBIT B
T03NR23W21 T03NR23W22 T03NR23W23 T03NR23W24 T03NR22W19
T03NR23W27
T03NR23W28 T03NR23W26 T03NR23W25 T03NR22W30
T03NR23W33 T03NR23W34 T03NR23W35 T03NR23W36 T03NR22W31
T02NR23W04 T02NR23W03 T02NR23W02 T02NR23W01 T02NR22W06
T02NR23W09 T02NR23W10 T02NR23W11 T02NR23W12 T02NR22W07
T02NR23W16 T02NR23W15 T02NR23W14 T02NR23W13 T02NR22W18
SHOAL RIVER PROJECT AREA
¯
HAISEAL TIMBER CO PARCELS
OKALOOSA COUNTY PARCELS
DUKE FIELD APPROACH DEPARTURE CLEARANCE SURFACE
SECTIONS
PROPERTY APPRAISER PARCELS
5000 2500 0 5000 10000
MILITARY INSTALLATION BOUNDARY Packet Pg. 812
Feet
Okaloosa County Future
Water Supply Planning
Update
Water The Need
Background and History
Next Steps
Subtitle placed here
November 2013
Packet Pg. 813
The Need
Water customers in
Okaloosa County are
served by OCWS and
several other utilities
Drinking water supply
relies on wells in the
Floridan Aquifer
Water levels in the
Floridan Aquifer have
been declining since the
1950’s and further
declines are not
sustainable
Packet Pg. 814
The Need
Okaloosa County will need additional water sources to:
– Sustain County’s economic and population growth
– Protect Floridan Aquifer and prevent saltwater intrusion
– Provide for conjunctive use
Packet Pg. 815
Planning Background and History
Early 1990’s – Northwest Florida
Water Management District and
OCWS began to foresee the need
for future water supply planning
Mid 1990’s thru Mid 2000’s –
Initial studies were performed by
various groups (USACE and
NWFWMD primarily) on potential
sources throughout Okaloosa
County.
1999 – Creation of the Regional
Utility Authority (RUA)
Packet Pg. 816
Planning Background and History
2004 – Construction of a 21-mile
30-inch pipeline with two 1-MG
tanks thru Eglin AFB.
2006 – Northwest Florida Water
Management District contracted
with PBS&J to study potential
water supply alternatives.
2006 – Purchased 353 acres
along the Shoal River for future
utilization.
2008 – OCWS formed a Future
Water Supply Committee
consisting of local concerned
citizens.
Packet Pg. 817
Planning Background and History
2008 – OCWS contracted CH2M HILL to assist OCWS and
the Future Water Supply Committee with studying future
water supply.
2009-10 - Two Riverbank Filtration Studies Performed to
Evaluate Suitability of Shoal River.
2010 – In February, Okaloosa Board of County
Commissioners Approved a 4-Year Implementation Plan.
2010-13 – In partnership with the USACE and OCWS, CH2M
HILL has performed three tasks under the USACE’s
Planning Assistance to States Program which provides for a
50/50 cost-share for work performed. In total, the
partnership has performed almost $700,000 in studies with
OCWS contribution $350,000.
Packet Pg. 818
Planning Background and History
2013 – OCWS met with NWFWMD to discuss status of land
acquisition. NWFWMD has not budgeted for land acquisition
in their FY14 budget and has no firm timeline when or if land
acquisition will be funded. NWFWMD preference is for
OCWS to lead this effort.
Packet Pg. 819
Planning Background and History
2013 - Shoal River Land Acquisition was submitted to the
FDEP for consideration for Pot #2 of the RESTORE Act and
NFWF funding.
Packet Pg. 820
Next Steps
Safe Yield Analysis on Shoal River (aka Water Use Permit) -
Perform preliminary analysis to determine the feasibility of
withdrawing up to 10-million gallons per day from the Shoal
River.
Utilize existing REPI and DIG Grants obtained in partnership
with Eglin AFB to purchase land parcels north of Eglin AFB,
south of I-10 and near the Shoal River for both source water
protection, military buffer, and potential water treatment plant
site.
Packet Pg. 821
Next Steps
All three REPI Grants require a match
– The match for REPI 1 is the OCWS’s existing 353 acres along the Shoal
River.
– The match for