READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — May 20, 2014 — reading text
Part 105 of 120. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
REPORT AND POST-DEPLOYMENT NOTIFICATION
To Be Completed For Each Deployment Location or Date of Deployment
County or
Municipality:_____________________________________ Date of Placement:_________________________
Grant No. FWC - ________________________________ U.S. Army Corps
(if applicable) Permit No.: _______________________________
Total project cost: $___________ (Funding Source(s) and Amount(s): FWC $____________ Local $ __________ Other $________)
Name of Permitted Location Name
Reef Site: ________________________________ for This Deployment:________________________
°
Latitude:_____ ______.___ ___ ___’ North Longitude:______ °_______.___ ___ ___’ West
Degrees minutes decimal minutes Degrees minutes decimal minutes
GPS Brand:__________________ GPS Model number:___________
Geographical Location: ______________ at __________degrees from ___________________________________
(nautical miles) (bearing) (reference inlet)
Water Depth:________ feet (minus) Max. Material Height: ________feet (equals) Actual Vertical Clearance: ______feet
TYPE AND AMOUNT OF MATERIAL DEPLOYED AT THE LOCATION DESCRIBED ABOVE:
(ATTACH A PHOTOGRAPH OF THE MATERIAL ON THE BARGE IMMEDIATELY PRIOR TO DEPLOYMENT)
Primary Type of Material:____________________________________________ Number of Pieces:__________
Dimensions:________________________________________________________________________________
Secondary Type of Material:_________________________________________ Number of Pieces:__________
Dimensions:________________________________________________________________________________
How was tonnage calculated?(Check all that apply, attach additional sheets if necessary): Before & after barge draft calculation
Known weight of individual pieces
TOTAL TONNAGE FOR THIS DEPLOYMENT: _______________________ Trucking receipts
I DO HEREBY CERTIFY THAT THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE
Observer’s Name: _________________________________ Title: _________________________________
(PLEASE PRINT) (PLEASE PRINT)
Observer’s Signature: _______________________________ Date: __________________________________
Observer’s Remarks: __________________________________________________________________________
___________________________________________________________________________________________
I DO HEREBY CERTIFY THAT THE ABOVE INFORMATION COMPLIES WITH THE ABOVE REFERENCED PERMIT CONDITIONS
Permittee’s Staff Name: _________________________________ Title: __________________________________
(PLEASE PRINT) (PLEASE PRINT)
Permittee’s Staff Signature: ______________________________ Date: _________________________________
Local Tracking number ______________ FWC Tracking number _______________ Entered by _________ on _________
Rev. 4/23/2007 FWC initials date
Packet Pg. 741
SELF-CERTIFICATION STATEMENT OF COMPLIANCE
Permit Number: SAJ-2012-02734 (SP-SWA)
Permittee’s Name & Address (please print or type): __________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Telephone Number: ____________________________________________________________________
Location of the Work: __________________________________________________________________
_____________________________________________________________________________________
Date Work Started: __________________________ Date Work Completed: ______________________
Description of the Work (e.g. bank stabilization, residential or commercial filling, docks, dredging, etc.):
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Acreage or Square Feet of Impacts to Waters of the United States: _______________________________
Describe Mitigation completed (if applicable): ______________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Describe any Deviations from the Permit (attach drawing(s) depicting the deviations):
_____________________________________________________________________________________
_____________________________________________________________________________________
I certify that all work, and mitigation (if applicable) was done in accordance with the limitations and
conditions as described in the permit. Any deviations as described above are depicted on the attached
drawing(s).
______________________________
Signature of Permittee
______________________________
Date
Packet Pg. 742
N
MID BA
Y BRID
GE RD
EMERALD COAS
T PKWY (US HWY 98)
FDEP RANGE MONUMENTS (TYP)
HENDERSON BEACH STATE PARK
R-034 R-036 MEAN HIGH WATER LINE (+0.77')
R-037
4/4/2012 2:28:35 PM
R-035 R-038
0 R-039
R-040
0 R-041
R-042
ANTON FLEWELLING X:\SYS\PROJECTS\P2012-015 OKALOOSA CO SNORKEL REEF\PERMIT\P2012-015-P-OVERVIEW.DWG
R-043
-10
0
-10
-20
-10
-20
