READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — April 1, 2014 — Action Item Printout — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 36-Action Item Printout.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: April 1, 2014 TO: Honorable Chairman and Members of the Board FROM: John Hofstad SUBJECT: State Water Artificial Reef Permits DEPARTMENT: Public Works BCC DISTRICT: All STATEMENT OF ISSUE: The Okaloosa County Artificial Reef Program (OCARP) has received conditional approval of permits for four artificial reef deployment areas in State waters. These permits must be approved by the Board and submitted to US Army Corp of Engineers (Corps) District Engineer for final approval. The signature by the District Engineer validates the permits. BACKGROUND: Nearly three years ago, OCARP prepared and submitted joint permit applications for four artificial reef deployment areas; Fish Haven 13, Fish Haven 14, Fish Haven 15 and Fish Haven 16, to the Florida Department of Environmental Protection (FDEP) and Corps. The FDEP permit approvals were granted just over a month after their respective submission dates but the Corps approvals were not granted until the week of March 10, 2014. The FDEP permits expire 5 years after approval and the Corps permits have 10 year durations. If necessary, the FDEP permits can be extended if the deployment area construction is not completed within 5 years. Each of the four Fish Haven deployment area permits include 9 proposed reef sites and will be built out utilizing funding from Florida Fish and Wildlife (FWC) grants, Okaloosa County Tourist Development Department and Natural Resource Damage Assessment (NRDA). Materials for the reefs include prefabricated reef modules and donated materials from the US Air Force, City of Fort Walton Beach and Mid-Bay Bridge Authority. Construction of reefs within Fish Havens 13-16 is slated to commence in the summer of 2014 with the 2013 FWC Supplemental Grant project. This project utilizes US Air Force material to construct reefs at the center points of the newly permitted deployment areas. OPTIONS: Approve/Disapprove RECOMMENDATIONS: Staff recommends the Board authorize the Chairman to sign the permits. RECOMMENDED BY: APPROVED BY: Ernie Padgett, County Administrator

Download this text file with its original spacing ↓