READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — July 25, 2016 — Stormwater - PBB — reading text

Part 1 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.

Stormwater - PBB — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA SERVICE AREA: TRANSPORTATION DEPARTMENT/PROGRAM: STORMWATER PROGRAM DESCRIPTION: The Stormwater Division of Public Works provides stewardship of the Okaloosa County stormwater infrastructure and compliance with applicable regulatory obligations. Stewardship responsibilities include: • Stormwater system construction, • Evaluation and repair of stormwater infrastructure, • Maintenance tasks, and • Storm recovery and restoration. Regualtory obligations include; • Development and implementation of Stormwater Best Management Practices (BMPs), • Collection and management of National Pollutant Discharge Elimiation System (NPDES) data, • Evaluation and reporting of NPDES compliance activities, and • Administrative maintenance of the NPDES Permit and Notice of Intent development. Additionally, stormwater staff provides support services for the Public Works work order system (Cartegraph). REVENUE: Stormwater Division is funded within the County Transportation Trust Fund (CTTF). Supporting revenue of the CTTF is fuel taxes, intergovernmental revenue, charges for services, miscellaneous revenue and transfers. Supporting revenue of the CTTF are gas taxes and local option gas tax (LOGT), constitutional gas taxes (CGT) and federal and state shared revenue, state and federal grants, and an annual allocation of revenue from the general fund. A revenue profile for the FY16 Stormwater Division budget is provided below. It is recommended that FY17 funding levels are maintained. MAJOR ACCOMPLISHMENTS LAST YEAR:  300 Stormwater Brochures for the General Public distributed Okaloosa County Equipment Rodeo, Okaloosa County Schools, Water and Sewer Office and Public Work Offices.  Identified 122 – Outfalls that flow into receiving waters and 265 – Total Outfalls currently GIS Arc mapped 0 corrected actions issued with corrections following.  122 Major Outfalls that discharge to surface waters recorded.  149 Dry Weather Inspections  Citizen Request for Services - 156 Complaints received. 156 Complaints Investigated  47 Staff performed In-House Training on Importance of Stormwater Maintenance, Sediment Control on Construction Sites and Installing Erosion and Turbidity Controls (31 Level 1) and (16 Level 2) Certifications.  31 Private and 8 County sites - Number of construction site operations under the erosion and sedimentation control requirements and active construction sites operating under the material management ordinance  72 Parks per week actively inspected for trash and drainage maintenance.  Inspected 27 Parks that have stormwater structures for NPDES.  53 - Number of county construction projects including minor maintenance that implemented correct erosion control methods. all County construction sites will be inspected by County Inspectors who are FDEP Sedimentation and Erosion Control Certified  4,002.5 cubic yards of sediment was removed from channels and basins  193 Stormwater ponds under Okaloosa County maintenance  31 Level 1 and 16 Level 2 Stormwater Operator Certifications employees performed In-House Training on Importance of Stormwater Maintenance, Sediment Control on Construction Sites, Installing Erosion and Turbidity Controls to reduce stormwater pollution  53 Stormwater related maintenance/construction Work Orders addressed  200 Stormwater related Work Requests addressed  39 Stormwater maintenance/construction PROGRAM GOAL: The primary goal of the Stormwater Division is to manage, construct, maintain, inspect and catalogue existing and planned stormwater systems within Okaloosa County. This goal is to be accomplished utilizing the Best Management Practices defined in the County Notice of Intent within the regulatory framework set forth within the Okaloosa County NPDES permit and Notice of Intent. KEY OBJECTIVES: 1. Implement a public education program to distribute educational materials to the community. 2. Conduct equivalent outreach activities about the impacts of stormwater discharges on water bodies and the steps that the public can take to reduce pollutants in stormwater runoff. 3. Comply with State and local public notice requirements when implementing a public involvement/public participation program. 4. Develop and maintain a storm sewer system map, showing the location of all known outfalls and the names and location of all surface waters of the State that receive discharges from those outfalls. 5. To the extent allowable under State or local law, effectively prohibit through ordinance, or other regulatory mechanism, of non-stormwater (i.e., "illicit") discharges into the storm sewer system and implement appropriate enforcement procedures and actions. 6. Develop and implement a plan to detect and eliminate non-stormwater discharges, including illegal dumping, to the MS4. 7. Develop and implement, to the extent allowable under State or local law, an ordinance or other regulatory mechanism to require erosion and sediment controls, as well as sanctions to ensure compliance, to reduce pollutants in any stormwater runoff to the Phase II MS4 from construction activities. 8. Develop and implement requirements for construction site operators to implement appropriate erosion and sediment control best management practices. 9. Develop and implement requirements for construction site operators to control waste such as discarded building materials, concrete truck washout, chemicals, litter, and sanitary waste at the construction site that may cause adverse impacts to water quality. 10. Develop and implement procedures for site plan review that incorporate consideration of potential water quality impacts. 11. Develop and implement procedures for receipt and consideration of information submitted by the public. 12. Develop and implement procedures for site inspection and enforcement of control measures. 13. Use an ordinance or other regulatory mechanism, to the extent allowable under State or local law, to address from post-construction runoff from new development and redevelopment projects that are part of a larger common plan of development or sale, that discharge into the Phase II MS4. 14. Develop and implement strategies that include a combination of structural and/or non-structural best management practices (BMPs) appropriate for the community. 15. Require adequate long-term operation and maintenance of BMPs. 16. Develop and implement an operation and maintenance program that has the ultimate goal of preventing or reducing pollutant runoff from MS4 operator activities, such as park and open space maintenance, fleet and building maintenance, new construction and land disturbances, and stormwater system maintenance. 17. Using training materials that are available from regulatory agencies or other organizations include employee training to prevent and reduce stormwater pollution from MS4 operator activities. 18. Develop and implement Stormwater Project database for tracking construction/maintenance projects including; surveys, inspections, material procurement and staging and project milestones. PERFORMANCE MEASURES: Actual Estimate Proposed Performance Measures FY14/15 FY15/16 FY16/17 Number of Stormwater Brochure distributed to the General Public. 900 1,000 1,000 Number of public notice meetings 4 4 4 Number of Stormwater outfalls mapped 241 300 300 Number of stormwater related enforcement actions taken 35 40 40 Number of stormwater inspections 8 99 99 Number of illicit discharges identified 1 10 10 Number of illicit discharges eliminated 0 10 10 Number of inspections conducted 148 122 122 Number of complaints received 906 1,000 1,000 Percentage of complaints investigated 100% 100% 100% Document and report the number of staff trained. 32 40 40 Number of construction sites operation under the erosion and 75 75 75 sedimentation control requirements. Number of stormwater management plans reviewed 35 35 35 Number of construction site inspections. 125 125 125 Number of county park stormwater systems maintained 53 53 53 Number of county construction projects that implement correct erosion 40 35 35 control methods. Volume (cubic yards) of material removed from catch basins. 6,109 15,000 15,000 Number of swale maintenance activities performed. 478 500 500 Number of stormwater ponds maintained. 191 185 185 HISTORICAL STAFFING SUMMARY: Category FY14 FY15 FY16 FY17 Full-time Administrative & Support 0 0 5 5 Full-time Operations & Trades 4 4 7 7 Total 4 4 12 12 EXPENDITURES: Expenditures Budget FY14 FY15 FY16 FY17 FY16/FY17 Increase/ Category Actual Actual Approved Proposed +/- Decrease Personnel Services $472,421 $454,713 $638,370 $643,004 $4,634 0.7% Operating Expenses $260,782 $262,558 $685,479 $596,496 ($88,983) (13.0%) Capital Outlay $0 $184,467 $932,540 $1,608,531 $675,991 72.5% Total $733,204 $901,738 $2,256,389 $2,848,031 $591,642 26.2% ACCOUNTS: FY15 FY16 FY17 FY16/FY17 Increase/ Code Category Approved Approved Proposed +/- Decrease 10 Salaries & Wages $355,119 $428,427 $432,259 $3,832 0.9% 20 Benefits $138,792 $209,943 $210,745 $802 0.4% 31 Professional Services $0 $100,000 $175,075 $75,075 75.1% Provides additional funding for engineering services. 40 Travel & Per Diem $50 $50 $50 $0 0.0% 41 Communications Services $1,000

Download this text file with its original spacing ↓