Okaloosa County BOCC — October 5, 2013 — Lord&Son Cost Estimate - Shalimar — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 84-Lord_Son Cost Estimate - Shalimar.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

State of FL Certified General Contractor #CG CO08942 CONSTRUCTION, State of FL Certified General Contractor #CG CO57094 INC. State of AL Certified General Contractor #12776 State of GA Certified General Contractor #GCCO002537 State of MS Certified General Contractor #08714 srerrcreernnes N lb OS BON CONSTRUCTION MANAGER / GENERAL CONTRACTOR Trusted Performance ... Lasting Value September 11, 2013 Mr. Ernie Padgett, Okaloosa County Administrator 1804 Lewis Turner Boulevard, Suite 400 Fort Walton Beach, Florida 32547 RE: Okaloosa Shalimar Annex Dear Ernie: Pursuant to your request for rough order of magnitude (ROM) estimates for comparison of construction costs for renovation of existing facilities versus new construction, we have broken down the comparison into the following four options. _ Option 1 — New two-story building of approximately 50,000-SF $165.00 X 50,000-SF $8,250,000 Additional items: demolition, sitework, landscaping, telecommunications, site lighting, A/E fees, and Civil Engineer fee 1,505,000 Total — Option 1 $9,755,000 If the County elects to complete these sections of work with their forces, deduct: Demolition ($ 195,000) Sitework ( 268,000) Landscaping ( 150,000) Telecommunications ( 200,000) Site Lighting (_ 140,000) Total Deducts ($ 953,000) Total Option 1 with Deducts $8,802,000 Option 2 — New three-story building where third floor is shelled space only; approximately 75,000-SF $165.00 X 50,000-SF $8,250,000 25,000-SF third floor shell 395,000 19 David Street ¢ Fort Walton Beach, Florida 32547 P.O. Box 1808 ¢ Fort Walton Beach, Florida 32549 850-863-5158 « FAX 850-862-4904 info@lordandson.com WE Associated Builders ual Dantrestare tee. www.lordandson.com North Florida Chapter Specializing in Commercial Construction Since 1975 Mr. Ernie Padgett September 11, 2013 Page 2 Additional items: demolition, sitework, landscaping, telecommunications, site lighting, A/E fees, and Civil Engineer fee 1,505,000 Total — Option 2 $10,150,000 If the County elects to complete the sections of work with their forces as listed in Option 1: Deduct ($ 953,000) Total Option 2 with Deducts $9,197,000 Option 3 — Complete renovation of entire existing facility; approximately 65,658-SF. Includes sitework, landscape, front entrance, site lighting and A/E fees. Original total estimate $11,350,000 minus Judicial Space cost; deduct $920,000 Total — Option 3 $10,430,000 If the County elects to complete these sections of work with their forces, deduct: Sitework ( 153,000) Landscaping ( 150,000) Telecommunications ( 200,000) Site Lighting (_ 140.000) Total Deducts ($ 643,000) Total Option 3 with Deducts $ 9,787,000 Option 4 — Renovation of Buildings B and G only, including all exterior renovations of canopies ADA requirements and A/E fees. Total — Option 4 $10,430,000 The County completes renovation in Buildings A, C, D, E and F Deduct ($3,745,000) Total Option 4 with Deducts $ 6,685,000

Download this text file with its original spacing ↓